# Task Owner Task Name Commencement Date Intended Completion Date Progress comments Status Action
1

Jun 25, 2024 Nov 30, -0001

0%

Completed
2

Jul 25, 2024 Jul 26, 2024

100%

Completed
3

Oct 17, 2024 Dec 10, 2024

%

Overdue
4

Sep 06, 2024 Sep 06, 2024

100%

Completed
5

Nov 30, -0001 Nov 30, -0001

100%

Completed
6

Jun 19, 2024 Jun 19, 2024

%

Completed
7

Apr 15, 2024 May 22, 2024

%

Overdue
8

Global Health Workforce Program: Uongozi Wa Afya Mashinani LG46 Training; Strathmore Business School;

Jul 08, 2024 Jul 12, 2024

100%

Completed
9

Inaugural Multidisciplinary Team (MDT) Review Meeting

Aug 16, 2024 Aug 16, 2024

100%

Completed
10

K-WASH & FLOCCA Meeting With CECM Finance And Water

May 27, 2024 May 28, 2024

100%

Completed
11

Kicowasco Meter Readers Meeting

May 20, 2024 May 20, 2024

100%

Completed
12

Preparation For External Financial Audit For The LVCT Dhibiti Sub Award And Wezesha Afya G2G Project Awards;

Sep 05, 2024 Sep 06, 2024

100%

Completed
13

Primary Health Care Networks Orientation.

Aug 03, 2024 Aug 03, 2024

100%

Completed
14

Primary Health Care Networks – Baseline Assessment Feedback

Aug 01, 2024 Aug 01, 2024

100%

Completed
15

Primary Health Care Networks – Orientation

Jul 31, 2024 Jul 31, 2024

100%

Completed
16

TB Short-Term Regimen Sensitization Meetings

Aug 01, 2024 Aug 01, 2024

100%

Completed
17

?Visit Gathigiriri And Thiba Health Center To Prepare For Visit By CDC Donors On Tuesday Next Week.

Apr 30, 2024 Apr 30, 2024

100%

Completed
18

16 Days Of GBV ACTIVISM

Nov 26, 2024 Nov 29, 2024

100%

Completed
19

20 CHPs And Nurses With Ambulance At MCAs Tournament At Kiburu

Aug 25, 2024 Aug 25, 2024

100%

Completed
20

20 CHPs And Nurses With Ambulance At MCAs Tournament At Sagana

Sep 01, 2024 Sep 01, 2024

100%

Completed
21

2025 Alcoholic Drinks Applications

Oct 01, 2024 Nov 30, 2024

%

Overdue
22

2nd Operation Triple Zero (OTZ) Conference

Sep 03, 2024 Sep 05, 2024

100%

Completed
23

3 Day Workshop To Review And Update The Public-Private Mix Action Plan For TB, HIV And Malaria

Oct 14, 2024 Oct 17, 2024

100%

Completed
24

3 Tier HIV Testing Training

Dec 04, 2024 Dec 06, 2024

100%

Completed
25

3 Tier HIV Testing Training Of Facility Staff

Jan 21, 2025 Jan 23, 2025

100%

Completed
26

3 Tier HIV Testing Training Of Facility Staff- Group 1

Feb 03, 2025 Feb 05, 2025

100%

Completed
27

3 Tier HIV Testing Training Of Facility Staff- Group 2;

Feb 05, 2025 Feb 07, 2025

100%

Completed
28

3-tier HIV Testing TOT Training

Nov 20, 2024 Nov 22, 2024

100%

Completed
29

8.00 A.m - 10.00 A.m Departmental Meeting

Nov 30, -0001 Nov 30, -0001

100%

Completed
30

A Departmental Meeting

Jul 23, 2024 Jul 23, 2024

100%

Completed
31

A Precursor Preparation Meeting For The IGF

Dec 08, 2024 Dec 08, 2024

100%

Completed
32

ABDP Meeting And Motor Vehicle Meeting

Jun 17, 2024 Jun 17, 2024

100%

Completed
33

ABDP Meeting At IFAD Hall Embu

Jun 24, 2024 Jun 25, 2024

100%

Completed
34

ABDP Meeting;Office Work

Jun 24, 2024 Jun 24, 2024

%

Completed
35

ABDP Training On County -level Financial Accounting , Recording & Reporting Training

May 06, 2024 May 10, 2024

100%

Completed
36

Accompanied Her Excellency The Governor To Nairobi

Oct 23, 2024 Oct 24, 2024

100%

Completed
37

ACCOMPANYING THE PS - SPECIAL PROGRAMS

May 29, 2024 May 29, 2024

100%

Completed
38

Acquisition And Compensation Of Land

May 20, 2024 May 20, 2024

50%

Overdue
39

Administration Departmental Meeting

Jul 08, 2024 Jul 08, 2024

100%

Completed
40

Administration Departmental Meeting

Aug 06, 2024 Aug 06, 2024

100%

Completed
41

ADP Meeting At Narig Boardroom

Aug 09, 2024 Aug 09, 2024

100%

Completed
42

ADP Public Participation

Aug 13, 2024 Aug 19, 2024

100%

Completed
43

ADP Public Participation

Aug 13, 2024 Aug 14, 2024

100%

Completed
44

ADP Public Participation

Aug 14, 2024 Aug 15, 2024

100%

Completed
45

ADP Public Participation

Aug 15, 2024 Aug 16, 2024

100%

Completed
46

ADP Public Participation

Aug 13, 2024 Aug 13, 2024

%

Completed
47

ADP Public Participation

Aug 14, 2024 Aug 14, 2024

%

Completed
48

ADP Public Participation

Aug 15, 2024 Aug 15, 2024

%

Completed
49

AGM For Kutus Mjini Water Projec

Jul 17, 2024 Jul 18, 2024

100%

Completed
50

ALCHOLIC DRINKS LICENSING CYCLE (2025)

Sep 02, 2024 Dec 31, 2024

%

Overdue
51

Alcoholic Drinks Public Participation

Nov 25, 2024 Nov 29, 2024

%

Overdue
52

Alcoholic Drinks Work Plans

May 06, 2024 May 10, 2024

0%

Completed
53

Alcoholic Drinks Revenue Mobilization

May 13, 2024 May 17, 2024

100%

Completed
54

Alcoholic Drinks Revenue Mobilization

May 20, 2024 May 20, 2024

0%

Completed
55

Amending With The HR Department On Performance Contract

Jul 22, 2024 Jul 22, 2024

100%

Completed
56

Annual Aquaculture Day Opening In The Morning Hours

May 20, 2024 May 20, 2024

100%

Completed
57

Annual Aquaculture Day

May 20, 2024 May 20, 2024

%

Completed
58

ANNUAL DEVELOPMENT PLAN PUBLIC PARTICIPATION AT KIROGO SOCIAL HALL IN GATHIGIRIRI WARD

Aug 13, 2024 Aug 13, 2024

100%

The Meeting On ADP At Kirogo Gathigiriri Ward Went On Well With A Very Good Attendance, Members Of The Public Proposed Various Projects For Implementation Across  All The Departments.

Completed
59

Annual Development Plan Public Participation Meetings

Aug 13, 2024 Aug 16, 2024

100%

Completed
60

Annual NCD Caucus Meeting;

Mar 21, 2025 Mar 21, 2025

100%

Completed
61

Annual Review Meeting With County Health Managers

Sep 11, 2024 Sep 11, 2024

100%

Completed
62

Annual Review Meeting With Healthcare Workers From Wezesha Afya Project Supported Facilities

Sep 07, 2024 Sep 07, 2024

100%

Completed
63

Annual Ward Climate Change Prioritization

Jun 24, 2024 Jun 24, 2024

100%

Completed
64

Annual Ward Climate Change Project Prioritization Project In Kerugoya

Jun 25, 2024 Jun 25, 2024

100%

Completed
65

Annual Ward Climate Change Project Prioritization Workshop

Jun 27, 2024 Jun 27, 2024

100%

Completed
66

Annual Ward Climate Change Project Prioritization Workshop In Kianyaga Stadium

Jun 26, 2024 Jun 26, 2024

100%

Completed
67

Apparel Center Site Visit

Apr 22, 2024 Apr 22, 2024

100%

Completed
68

Appearance Before The County Public Investment And Accounts Commitee.

Jun 06, 2024 Jun 06, 2024

100%

Completed
69

ARES MEETING ON THE ISSUE OF HOSPITAL SOLARIZATION

Oct 24, 2024 Oct 24, 2024

100%

The Meeting Took Place And A Team Was Formed To First Understand And Give Its Inputs To The Content Of The Memoranda

Completed
70

Arranging ECDE Materials And Uniform For Distribution To ECDE Centres.

Jul 12, 2024 Jul 12, 2024

100%

Completed
71

Asess County Vehicle Status

Oct 04, 2024 Oct 04, 2024

100%

Completed
72

Assessment Of A New Slaughter Slab At Gathoge Mwea East

Jul 16, 2024 Jul 16, 2024

100%

Completed
73

Assessment Of All Banana Aggregation Centers

Jun 03, 2024 Jun 14, 2024

100%

Completed
74

Assessment Of Dairy Farmers Supported Through Fodder Production By NARIGP Project.

Jun 03, 2024 Jun 14, 2024

100%

Completed
75

Assessment Of Dairy Goat Farmers Supported By NARIGP Project

Jun 03, 2024 Jun 14, 2024

100%

Completed
76

Assessment Of Feed Mixers Supported By The Narigp Project

Jun 03, 2024 Jun 14, 2024

100%

Completed
77

Assessment Of Greenhouses Funded By NARIGP Project

Jun 10, 2024 Jun 14, 2024

100%

Completed
78

Assessment Of Mutira Coffee Cooperative Society

Jun 03, 2024 Jun 14, 2024

100%

Completed
79

Assessment Of New Slaughter Slab At Togonye Murinduko Ward

Jul 16, 2024 Jul 16, 2024

100%

Completed
80

Assessment Of Nursery Seedling Supported By NARIGP Project

Jun 10, 2024 Jun 14, 2024

100%

Completed
81

Assessment Of Poultry Cage Farming Groups Supported By The NARIGP Project

Jun 03, 2024 Jun 14, 2024

100%

Completed
82

Assessment Of Seedlings Nursery Supported By The NARIGP Project

Jun 03, 2024 Jun 14, 2024

100%

Completed
83

Assessment On Tveta _ Licensing Compliance S In Line With Previous Audit Exercise By The Directorate

May 22, 2024 May 29, 2024

100%

Completed
84

Assets Management-handing Over Report For Departmental Assets By IGTRC

May 06, 2024 May 06, 2024

%

Completed
85

Attend A Group Meeting At Kabare Ward

Oct 09, 2024 Oct 09, 2024

100%

Completed
86

Attend A Group Meeting At Kariti Ward

Nov 07, 2024 Nov 07, 2024

100%

Completed
87

Attend A Group Meeting At Mutira Ward

Aug 30, 2024 Aug 30, 2024

100%

Completed
88

Attend A Group Meeting At Mutithi Ward

Aug 23, 2024 Aug 23, 2024

100%

Completed
89

Attend A Group Meeting At Mutithi Ward

Aug 28, 2024 Aug 28, 2024

100%

Completed
90

Attend A Meeting At H.E Residence

Aug 12, 2024 Aug 12, 2024

100%

Completed
91

Attend A Meeting At H.E Residence

Aug 12, 2024 Aug 12, 2024

100%

Completed
92

Attend A Meeting At NARIGP Boardroom

Aug 28, 2024 Aug 28, 2024

100%

Completed
93

Attend A Welfare Meeting At Kiangothe, Kabare

Aug 06, 2024 Aug 06, 2024

100%

Completed
94

Attend A Women Group Meeting At Kianjangá, Kirinyaga West

Aug 05, 2024 Aug 05, 2024

100%

Completed
95

Attend A Women Group Meeting In Ndia

Jul 26, 2024 Jul 26, 2024

100%

Completed
96

Attend ADP Public Participation

Aug 13, 2024 Aug 15, 2024

100%

Completed
97

Attend ADP Public Participation Excercise

Aug 13, 2024 Aug 15, 2024

100%

Completed
98

Attend Burial

May 21, 2024 May 21, 2024

100%

Completed
99

Attend Cabinet Meeting

Apr 25, 2024 Apr 25, 2024

100%

Completed
100

Attend Council Of Governors Meeting

Sep 04, 2024 Sep 06, 2024

100%

Completed
101

Attend H.E Function At Gathigiriri And Nyangati Ward

Sep 16, 2024 Sep 16, 2024

100%

Completed
102

Attend H.E Launch At Kerugoya NCBA

Nov 19, 2024 Nov 19, 2024

100%

Completed
103

Attend KUSP II Pre-assessment Meeting At Kerugoya Municipal Offices

Nov 20, 2024 Nov 20, 2024

100%

Completed
104

ATTEND THE KIMANDI WELFARE GROUP MEETING IN KERUGOYA

Sep 12, 2024 Sep 12, 2024

%

Overdue
105

ATTEND THE WORLD ENVIRONMENT DAY CELEBRATIONS

Jun 05, 2024 Jun 05, 2024

100%

Completed
106

Attend To Administrative Duties

Nov 25, 2024 Nov 25, 2024

100%

Completed
107

Attend To Office Work

Aug 26, 2024 Aug 27, 2024

%

Completed
108

Attend Women Caucus At Machakos

Aug 16, 2024 Aug 16, 2024

100%

Completed
109

Attending A LAPFUND Meeting

Jul 15, 2024 Jul 15, 2024

100%

Completed
110

Attending An Official Meeting At Becham

Jul 25, 2024 Jul 25, 2024

0%

Completed
111

ATTENDING BUDGET PORTAL SENSITIZATION AND DATA LOADING WORKSHOP AT ESERIANI H&R NAIVASHA

May 06, 2024 May 17, 2024

100%

Workshop In Completed.

Completed
112

Attending Burial

Oct 29, 2024 Oct 29, 2024

100%

Completed
113

Attending Of Workshop Of Kenya Preparedness Plan For Food And Nutrition Security Crises Consultative

Sep 12, 2024 Sep 13, 2024

100%

Completed
114

Attending Official Regional Music Festival Opening Ceremony

Jul 01, 2024 Jul 01, 2024

100%

Completed
115

Attending Planning Meeting For School Children Deworming With MoH, MOE And County Commissioner.

Apr 29, 2024 Apr 29, 2024

100%

Completed
116

Attending Public Participation At Mwea East

Aug 13, 2024 Aug 13, 2024

100%

Completed
117

Attending Senate

Jun 19, 2024 Jun 19, 2024

100%

Completed
118

Attending Senate Assembly Meeting

Jun 19, 2024 Jun 19, 2024

100%

Completed
119

Attending To A Graduation Ceremony At Ndia Polytechnic

May 24, 2024 May 24, 2024

100%

Completed
120

ATTENDING TO A K WASH MEETING ON BUDGETING

Jun 04, 2024 Jun 04, 2024

100%

The Meeting Took Place And Came Up With A Working Strategy With View To Making Sure That All That Is Required As A Requirement For K WASH  Is Achieved.

Completed
121

Attending To Administrative Duties

Jul 02, 2024 Jul 02, 2024

100%

Completed
122

Attending To Administrative Duties

Nov 11, 2024 Nov 11, 2024

100%

Completed
123

Attending To Administrative Duties

Nov 18, 2024 Nov 18, 2024

100%

Completed
124

Attending To Administrative Duties

Aug 26, 2024 Aug 26, 2024

100%

Completed
125

Attending To Administrative Duties

Jun 19, 2024 Jun 19, 2024

100%

Completed
126

Attending To Administrative Duties

Aug 05, 2024 Aug 05, 2024

100%

Completed
127

Attending To Administrative Duties

Aug 20, 2024 Aug 20, 2024

100%

Completed
128

Attending To Administrative Duties

Jul 22, 2024 Jul 22, 2024

100%

Completed
129

Attending To Administrative Duties

Sep 04, 2024 Sep 04, 2024

100%

Completed
130

Attending To Administrative Duties

Jun 25, 2024 Jun 25, 2024

100%

Completed
131

Attending To Administrative Duties

Sep 09, 2024 Sep 09, 2024

100%

Completed
132

Attending To Administrative Duties

Sep 24, 2024 Sep 24, 2024

100%

Completed
133

Attending To Administrative Duties

Sep 30, 2024 Sep 30, 2024

100%

Completed
134

Attending To Administrative Duties

Oct 08, 2024 Oct 08, 2024

100%

Completed
135

Attending To Administrative Duties

Oct 14, 2024 Oct 14, 2024

100%

Completed
136

Attending To Administrative Duties

Oct 23, 2024 Oct 23, 2024

100%

Completed
137

Attending To Clients In The Office

Aug 07, 2024 Aug 07, 2024

100%

Completed
138

Attending To Clients In The Office

Jul 10, 2024 Jul 10, 2024

100%

Completed
139

Attending To The Clients In The Office

Jul 31, 2024 Jul 31, 2024

100%

Completed
140

ATVETs Commercialization Training At Machakos

May 30, 2024 May 31, 2024

100%

Completed
141

Audit Of Mass Distribution Of Long-Lasting Mosquito Nets By KEMSA

Nov 04, 2024 Nov 08, 2024

100%

Completed
142

Auditors Meeting

Sep 02, 2024 Sep 03, 2024

%

Overdue
143

AWP/NHIF FY2023/2024 Quarter 4 Review Meeting; Nice Digital Hotel

Jul 10, 2024 Jul 10, 2024

100%

Completed
144

AWP/NHIF FY2023/2024 Quarter Four Review Meeting; Nice Digital Hotel

Jul 10, 2024 Jul 10, 2024

100%

Completed
145

Bar And Restaurant Verification Exercise

Mar 04, 2025 Mar 11, 2025

100%

Completed
146

Bar And Restaurant Verification Exercise

Feb 24, 2025 Mar 04, 2025

100%

Completed
147

Baringo County Visit On K Wash Bench Mark

Feb 18, 2025 Feb 18, 2025

100%

The Team Paid Us A Courtesy Call To Understand How We Are Operating Our Water Service Providers.

Completed
148

Baseline Assessment For PCN Establishment

Jul 24, 2024 Jul 26, 2024

100%

Completed
149

Beautification Of Our Entry Points

Apr 22, 2024 May 03, 2024

100%

This Was Done And Regular Maintenance Is On Course

Completed
150

BENCH MARKING WITH KISUMU COUNTY ON MATERIAL RECOVERY FACILITY(MRF)

Mar 10, 2025 Mar 13, 2025

%

Overdue
151

Benchmark Visit To Nyeri County

Sep 04, 2024 Sep 04, 2024

%

Overdue
152

Benchmarking Meeting On Ecde Digital Integration In Learning And And Teaching With Blooming Flowers Academy Nrb

Jul 29, 2024 Jul 29, 2024

%

Completed
153

Benchmarking Visit By Kiambu MCAs - Health And Finance Committees.

May 21, 2024 May 21, 2024

100%

The Team Changed The Visiting Date  To 03.06.2024.

The Team Visited On 03.06.2024 And The Benchmarking Activities Took Place Smoothly.

Completed
154

Benchmarking Visit By Laikipia County Health Officials

May 23, 2024 May 23, 2024

100%

It Was Great Having The Team 

This Activity Was Successful And The Team Was Very Very Happy With The Reception.

Completed
155

Bill Generation Approvals

Jan 28, 2025 Feb 04, 2025

100%

Completed
156

Blended Training In Malaria Diagnostics For Laboratory Officers

Feb 10, 2025 Feb 12, 2025

100%

Completed
157

Board Meeting At Rukanga Water Company

Jun 25, 2024 Jun 26, 2024

100%

Completed
158

Board Meeting At Rukanga Water Project

Jul 29, 2024 Jul 30, 2024

100%

Completed
159

BQ Data Collection,

Dec 16, 2024 Dec 23, 2024

100%

Completed
160

BQs Data Collection

Nov 11, 2024 Nov 19, 2024

100%

Completed
161

BQs Development For Ward Based Projects

Nov 19, 2024 Nov 26, 2024

100%

Completed
162

BQs Development For Ward Based Projects

Nov 04, 2024 Nov 12, 2024

100%

Completed
163

BQs Preparation

Oct 22, 2024 Nov 05, 2024

100%

Completed
164

Briefing Of Youths Under ASEs On ABDP Competitive Grant Process

May 14, 2024 May 14, 2024

100%

Completed
165

Budget Meeting With CECM Finance

May 27, 2024 May 28, 2024

100%

Completed
166

Budget Meeting With CECM Finance In NARIGP Boardroom

May 27, 2024 May 27, 2024

100%

Completed
167

Budget Response Meeting

May 27, 2024 May 27, 2024

100%

Completed
168

BUDGET RESPONSE PREPARATION MEETING

May 27, 2024 May 27, 2024

100%

The Meeting Took Place And Was Successful

Completed
169

Building Approval Validation

May 07, 2024 May 10, 2024

%

Overdue
170

Building Plans Development And Approvals

Aug 26, 2024 Aug 30, 2024

20%

Overdue
171

Building Plans Development And Approvals

Jul 02, 2024 Jul 31, 2024

80%

Overdue
172

Building Plans Development And Approvals

Jul 09, 2024 Jul 31, 2024

70%

Overdue
173

Building Safety And Compliance

May 06, 2024 May 06, 2024

100%

Building Safety And Compliance Enumerations;-

N/B, Development Captured: 284

Completed
174

Building Safety And Compliance

May 07, 2024 May 10, 2024

100%

Building Safety And Compliance Enumerations;-

N/B, Development Captured: 284

Completed
175

Bulk Water Inspection

Jun 06, 2024 Jun 07, 2024

100%

Completed
176

Bulky Water Meeting

Sep 20, 2024 Sep 21, 2024

100%

Completed
177

Bursary Monthly Reconciliation And Preparation Of Beneficiary Lists

Jul 02, 2024 Jul 02, 2024

100%

Completed
178

Bursary Secretaries Meeting

Jul 03, 2024 Jul 03, 2024

100%

Completed
179

CABINET

Dec 05, 2024 Dec 05, 2024

100%

Cabinet Was Post Poned

Completed
180

CABINET

Sep 05, 2024 Sep 05, 2024

100%

Cabinet Was Postponed To A Later Date

Completed
181

Cabinet Meeting

Apr 25, 2024 Apr 25, 2024

%

Completed
182

Cabinet Meeting

Apr 25, 2024 Apr 25, 2024

20%

Completed
183

CAIP

Nov 06, 2024 Nov 06, 2024

%

Completed
184

CAIP And Kibingoti Market

Sep 16, 2024 Jul 16, 2024

%

Completed
185

CAIP Meeting;Office Work

Nov 02, 2024 Nov 02, 2024

%

Completed
186

CAIP Progress Site Visit;Office Work

Jun 26, 2024 Jun 26, 2024

%

Completed
187

CAIP/EPZ Meeting

Aug 08, 2024 Aug 08, 2024

%

Completed
188

CAIP;Office Work

Nov 04, 2024 Nov 04, 2024

%

Completed
189

CAIPS INSPECTION

Sep 18, 2024 Sep 18, 2024

%

Completed
190

CAIPS And Markets

May 20, 2024 May 20, 2024

%

Completed
191

CAIPS Meeting - Sagana

May 07, 2024 May 07, 2024

%

Overdue
192

CAIPS,Kutus Livestock Market,Kagio Visit,SACCO Meeting

Nov 30, -0001 Nov 30, -0001

%

Completed
193

CAIPS;MARKETS

Jan 15, 2025 Jan 15, 2025

%

Completed
194

Cancer Communication Policy Dissemination Workshop– Maxland Hotel Juja; Officers; Oncologist, County Health Promotion Officer; Clinician Kerugoya County Referral Hospital

Jun 18, 2024 Jun 19, 2024

100%

Completed
195

Capacity Building And Sensitization Of Irrigation Cooperative Committee Members And Farmers Producer Organization

Nov 14, 2024 Nov 15, 2024

100%

Completed
196

Capacity Building Campaign For Staff On Rapid Disease Control And Surveillance

Aug 02, 2024 Aug 02, 2024

100%

Completed
197

Capacity Building On Anopheles Stephensi Entomological Surveillance;

Dec 02, 2024 Dec 06, 2024

100%

Completed
198

Capacity Building Workshop For Ward Bursary Accountants

Jun 14, 2024 Jun 14, 2024

100%

Completed
199

Capacity Building Workshop For Ward Bursary Accountants

Jun 14, 2024 Jun 14, 2024

100%

Completed
200

Carrying 0n Audit With KENAO

Sep 09, 2024 Sep 13, 2024

100%

Completed
201

CCIS APA

May 27, 2024 May 31, 2024

100%

The County Will Submit The Minimum Performance Conditions, Which Will Determine Whether The County Will Receive CCIS 3 Grant

Completed
202

CCTV REPAIR AT HQ MAINTENANCE

Oct 14, 2024 Oct 14, 2024

40%

Overdue
203

CCU ACTIVITIES TO THE WARD PRIORITIZATION OF PROJECTS IN ALIGNMENT TO THE WORK PLAN

Jun 24, 2024 Jun 28, 2024

100%

The Meetings Took Place And Were Effective

Completed
204

CCU Meeting

Sep 05, 2024 Sep 05, 2024

%

Overdue
205

CCU Meeting

Jun 13, 2024 Jun 13, 2024

100%

Done

Completed
206

CDC Kenya Implementing Partners Virtual Meeting On Self-Reliance

Mar 18, 2025 Mar 18, 2025

%

Completed
207

CDC Kenya Official Visit To Kirinyaga County- Thiba And Gathigiriri Health Centers

May 28, 2024 May 28, 2024

100%

Completed
208

CDC Site Improvement Monitoring Visits

Jul 22, 2024 Jul 26, 2024

100%

Completed
209

CDC- Division Of Global HIV And TB (DGHT) Meeting

May 08, 2024 May 08, 2024

0%

Completed
210

CDC- Implementing Partners Review Meeting For Wezesha Afya Kirinyaga Project

May 13, 2024 May 13, 2024

%

Completed
211

CDC-Implementing Partners’ Consultative Meeting

Jan 21, 2025 Jan 21, 2025

100%

Completed
212

CDC-Kenya Implementing Partners Update Meeting

Mar 06, 2025 Mar 06, 2025

100%

Completed
213

CDC-Kenya Implementing Partners Update Virtual Meeting

Mar 13, 2025 Mar 13, 2025

100%

Completed
214

CECM Water Meeting

Jun 12, 2024 Jun 13, 2024

100%

Completed
215

Cervical Cancer Screen & Treat H/W Mentorship For Health Care Workers

Feb 11, 2025 Feb 14, 2025

100%

Completed
216

Cervical Cancer Screen & Treat H/W Mentorship For Health Care Workers

Feb 18, 2025 Feb 21, 2025

100%

Completed
217

Cervical Cancer Screening Program Annual Progress Review Meeting

Aug 06, 2024 Aug 08, 2024

100%

Completed
218

CFSP PUBLIC PARTICIPATION IN KARITI WARD

Feb 14, 2025 Feb 14, 2025

100%

We Went For The Public Participation At MURURIINI In Kariti Ward. The Only Project They Were Seeking Support For Is The Karuiru Water Project From A Departmental View.

Completed
219

CFSP PUBLIC PARTICIPATION IN KARUMANDE WARD

Feb 13, 2025 Feb 13, 2025

100%

Karumande People Were Very Happy That The  County Government Has Given Them Projects And They Asked For More Support Especially In Roads Murram Ming And Street Lighting.

Completed
220

Championing Evidence Based Advocacy (CEBA) For Primary Health Care (PHC) Project Annual Feedback Meeting

Sep 02, 2024 Sep 02, 2024

100%

Completed
221

Changing Diabetes In Children (CDIC) PROJECT DQA Visit To Kerugoya CRH

May 27, 2024 May 27, 2024

100%

Completed
222

Children Policy

Oct 22, 2024 Oct 29, 2024

100%

Completed
223

Children Policy

Oct 30, 2024 Nov 06, 2024

100%

Completed
224

CHMT Meeting With HOYMAS On Key Population Programming – Venue To Be Determined

Jun 14, 2024 Jun 14, 2024

100%

Completed
225

CHMT Support Supervision In Kirinyaga Central Sub-County

Oct 30, 2024 Oct 30, 2024

100%

Completed
226

CHMT Support Supervision In Mwea East Sub-County

Oct 28, 2024 Oct 28, 2024

100%

Completed
227

CHP Household Registration Review Meeting – Kirinyaga West

Aug 20, 2024 Aug 20, 2024

100%

Completed
228

CIAGIINI TUJENGE SITE VISIT

Jul 25, 2024 Jul 24, 2024

100%

The Management Team Decided To Fore Visit First To Determine The Viability Of The Project And Resolved That The Technical Experts Need To Work Out A Fiscal Analysis Of The Investment And Report Back To Management On A Report To Be Adopted.

Completed
229

CIAGIINI TUJENGE WATER PROJECT VISIT

Jan 17, 2025 Jan 17, 2025

100%

I Visited The Area With Technical Experts From KICOWASCO Who Assessed The Nature Of Work Required To Be Done To Ensure The Area Residents Get Clean Piped Water.

Completed
230

CIDU SENSITIZATION ON FORMULATION BY THE STATE DEPARTMENT OF IRRIGATION SERVICES

Mar 04, 2025 Mar 04, 2025

100%

The Team From The State Department Of Water Came And Shared With Us A Framework And Proposed Legislation On The Management Of  CIDU.

Completed
231

Clean Up Of CHP Details On ECHIS

Nov 26, 2024 Nov 27, 2024

100%

Completed
232

CLEARING DEPARTMENTS ITEMS FROM KIANYAGA STADIUM

Sep 27, 2024 Sep 27, 2024

100%

This Was Done

Completed
233

CME On Infection Prevention With A Focus On Chlorhexidine Use

Feb 21, 2025 Feb 21, 2025

100%

Completed
234

CNOs And Nurse Leaders Biannual Workshop To Orient And Train In Implementation Of Data Demand And Information Application System

Nov 18, 2024 Nov 22, 2024

100%

Completed
235

Collection Of Vaccines From Nyeri Depot – KEPI Logistician

Jun 11, 2024 Jun 11, 2024

100%

Completed
236

Commemoration Of World Aids Day

Dec 01, 2024 Dec 01, 2024

100%

Completed
237

Commemoration Of World TB Day

Mar 24, 2025 Mar 24, 2025

100%

Completed
238

Commodity Managers’ Training On Integrated LMIS For Public Health Programs

Oct 14, 2024 Oct 17, 2024

100%

Completed
239

Commodity Security Review Meeting

Sep 17, 2024 Sep 17, 2024

100%

Completed
240

Community (house-to-house) Vitamin A+ Deworming Exercise

Nov 11, 2024 Nov 12, 2024

100%

Completed
241

Community Barazas On Safe Use Of Pesticides And Introduction Of Agripreneurs To The Community

Mar 03, 2025 Mar 05, 2025

%

Overdue
242

Community DQA Tool And ECHIS-KHIS Integration Finalization Workshop ; Venue- Naivasha; Officer Involved – Community Strategy Focal Person

Jun 10, 2024 Jun 14, 2024

100%

Completed
243

Community Health Assistants Training On Community Health Modules

Jul 17, 2024 Jul 19, 2024

100%

Completed
244

Community Vitamin A+ Deworming Planning Meeting

Nov 07, 2024 Nov 08, 2024

100%

Completed
245

Competence Based Education And Training(CBET)

May 27, 2024 May 31, 2024

100%

Completed
246

Compilation Of The Departmental Plan For The Administrative Department

Jul 11, 2024 Jul 11, 2024

100%

Completed
247

Compilation Of The Departmental Plan For The Gender & Youth Department

Jul 10, 2024 Jul 10, 2024

100%

Completed
248

Completion Of Proposal To Work Aid And Carrying Out Audit On Bursary

Oct 07, 2024 Oct 11, 2024

100%

Completed
249

Conduct A Field Day For The Control Of Fall Army Warm (FAW) In Maize Using Fawligen Bio Pesticide At The Pilot Demo Site At Kanyekiine Kirinyaga Central In Partnership With Centre For Agriculture And

Dec 11, 2024 Dec 11, 2024

100%

Completed
250

Conduct Review Of Strategic Plan

Jul 03, 2024 Jul 03, 2024

100%

Completed
251

Conduct Status Check Of H.E Residence

Sep 10, 2024 Sep 10, 2024

100%

Completed
252

Conduct Status Check Of H.E Residence

Jun 27, 2024 Jun 27, 2024

100%

Completed
253

Conducted A Status Check Of H.E Residence

Aug 29, 2024 Aug 29, 2024

100%

Completed
254

Conducting A Field Day For The Control Of Fall Armyworm (FAW) In Maize Using Fawligen Bio -pesticides At The Pilot Demo Site Kanyekiine Ward Kirinyaga Central In Partnership With Centre For Agricultur

Dec 11, 2024 Dec 11, 2024

100%

Completed
255

Conducting Administrative Duties

Nov 04, 2024 Nov 04, 2024

100%

Completed
256

Confirmation Of Budget Status

Jun 06, 2024 Jun 06, 2024

100%

Completed
257

Consolidation Of Health Workforce Data And Development Of A Dashboard For HRH Planning Policy

Sep 11, 2024 Sep 13, 2024

100%

Completed
258

Consultative Meeting Between County Pharmacists And Pharmacy And Poisons Board (PPB)

Mar 24, 2025 Mar 24, 2025

100%

Completed
259

Consultative Meeting On Ending Preventable Maternal Mortality And Every Newborn Action Plan

Dec 16, 2024 Dec 17, 2024

100%

Completed
260

Consultative Meeting With COG On The Readiness Of County Public Health Facilities On Implementation Of The Social Health Insurance Act

Sep 03, 2024 Sep 03, 2024

100%

Completed
261

Consultative Meeting With County Reproductive Health Coordinators From 3rd-7th June 2024; Venue- Naivasha; Officer Involved; CNO

Jun 03, 2024 Jun 07, 2024

100%

Completed
262

Consultative Meeting With HealthX

Sep 03, 2024 Sep 03, 2024

100%

Completed
263

Consultative Meeting With Kenya National Union Of Nurses

Feb 04, 2025 Feb 04, 2025

100%

Completed
264

CONSULTATIVE MEETING WITH NIA, WRA AND WATER PROJECTS CHAIRMEN

Oct 23, 2024 Oct 23, 2024

100%

The Meeting Went On And A Resolution Was Arrived At To Have An Assessment By A Team Of Engineers And Other Players Identified From The Members Present To Report The Current Status Of The Two Intakes As Far As The Quantity Of Water Demand Is Concerned.

Completed
265

Consultative Meeting With Public Health Officers

Feb 18, 2025 Feb 18, 2025

100%

Completed
266

Continuation Of Murraming Of Roads In Mutithi Ward

Jul 08, 2024 Jul 12, 2024

%

Overdue
267

Continuous Professional Development Stakeholders’ Engagement Meeting -Nursing Council Of Kenya

Jul 29, 2024 Jul 29, 2024

100%

Completed
268

CONTRACT PERFORMANCE TRAINING FOR WATER SERVICE PROVIDERS

Nov 22, 2024 Nov 22, 2024

100%

The Directors And The Teams Of Management Were Trained On Performance And Are Ready To Sign Contracts.

Completed
269

Cooperatives

Sep 24, 2024 Sep 24, 2024

%

Completed
270

Cooperatives

Sep 27, 2024 Sep 27, 2024

%

Completed
271

COOPERATIVES

Jan 07, 2025 Jan 07, 2025

%

Completed
272

Cooperatives

Oct 24, 2024 Oct 24, 2024

%

Overdue
273

Cooperatives

Jul 10, 2024 Jul 10, 2024

%

Completed
274

Cooperatives And Markets

May 27, 2024 May 27, 2024

%

Completed
275

Cooperatives:Markets

Aug 20, 2024 Aug 20, 2024

%

Completed
276

Cooperatives;Markets

Jul 17, 2024 Jul 17, 2024

%

Completed
277

Cooperatives;Office Work

Sep 17, 2024 Sep 17, 2024

%

Completed
278

Cooperatives;Weigthts And Measures

Oct 31, 2024 Oct 31, 2024

%

Completed
279

Council Of Governors And MoH Consultative Meeting On The Social Health Insurance Fund Means Testing Instrument

Sep 09, 2024 Sep 09, 2024

100%

Completed
280

County Alcoholic Drinks Committee Meeting

Nov 21, 2024 Nov 21, 2024

100%

Completed
281

County Aggregation Industrial Park Visit At Sagana

Apr 22, 2024 Apr 22, 2024

%

Completed
282

COUNTY BLOOD TRANSFUSION CENTRE- Strengthening (renovations And Staffing Needs)

May 08, 2024 May 09, 2024

0%

Completed
283

COUNTY CLIMATE CHANGE MEETING

Jun 12, 2024 Jun 12, 2024

100%

Members Of The CCU Gave More Input To The CCIS And CCRI Work Plans Before They Agreed For There Submission To The Cabinet  For Approval

Completed
284

County Clinical Officers Consultative Meeting

Nov 11, 2024 Nov 12, 2024

100%

Completed
285

County Competition Law And Policy Forum

Mar 20, 2025 Mar 20, 2025

100%

Completed
286

County Education Board Meeting

Aug 02, 2024 Aug 02, 2024

0%

Completed
287

COUNTY ENVIRONMENTAL COMMITTEE PLANNING MEETING

Jan 23, 2025 Jan 23, 2025

100%

There Was A Resolve To Ensure That An Intergovernmental CEC(County Environmental Committee) Be Called To Resolve And Address Issues Going Forward Regarding How Best To Deal With Effluents And Waste Disposal.

Completed
288

County Fiscal Strategy Paper Public Participation;

Feb 11, 2025 Feb 14, 2025

100%

Completed
289

County Health Management Team Meeting

Aug 30, 2024 Aug 30, 2024

100%

Completed
290

County HIV Committee Meeting

Oct 01, 2024 Oct 01, 2024

100%

Completed
291

County Liqour Licensing Comittee Meeting

Nov 19, 2024 Nov 26, 2024

100%

Completed
292

County Liqour Licensing Comittee Meeting

Jan 14, 2025 Jan 21, 2025

100%

Completed
293

County Music Festival

Jun 18, 2024 Jun 19, 2024

100%

Completed
294

County Peer Review Mechanism (CPRM) Process And Dissemination Of The AU Agenda 2063 Framework

Nov 12, 2024 Nov 14, 2024

100%

Completed
295

County Review And Approval Of Health Facilities Device Requests On HealthPro System

Mar 26, 2025 Mar 26, 2025

100%

Completed
296

County Sensitization On Guidelines For Development Of County Nutrition Action Plans

Oct 15, 2024 Oct 17, 2024

100%

Completed
297

County Stakeholders Consultation Meeting On GBV And Child Abuse

Aug 19, 2024 Aug 19, 2024

100%

Completed
298

COUNTY VEHICLE STATUS

May 20, 2024 May 20, 2024

100%

Completed
299

CPF Meeting

Jun 11, 2024 Jun 12, 2024

100%

Completed
300

CSLG 2 MEETING

Jun 14, 2024 Jun 14, 2024

100%

We Were Able To Give Our Inputs Via Responding To Both A Questionnaire Provided As Well As A One On One Question And Answer Deliberation

Completed
301

Curriculum Development For The Nationa Value Chain Development Project ( NAVCDP)

Aug 07, 2024 Aug 09, 2024

100%

Completed
302

Daily Routine

Sep 09, 2024 Sep 13, 2024

40%

Overdue
303

Daily Virtual Meeting With CDC-Kenya

Mar 06, 2025 Mar 06, 2025

100%

Completed
304

Daily Virtual Meeting With CDC-Kenya To Check Progress Of Implementation Of Cooperative Agreement Project

Feb 25, 2025 Feb 25, 2025

100%

Completed
305

Daily Virtual Meeting With CDC-Kenya To Check Progress Of Implementation Of Cooperative Agreement Project

Feb 26, 2025 Nov 30, -0001

100%

Completed
306

Daily Virtual Meeting With CDC-Kenya To Check Progress Of Implementation Of Cooperative Agreement Project

Feb 27, 2025 Feb 27, 2025

100%

Completed
307

Daily Virtual Meeting With CDC-Kenya To Check Progress Of Implementation Of Cooperative Agreement Project

Feb 28, 2025 Feb 28, 2025

100%

Completed
308

Daily Virtual Meeting With CDC-Kenya To Check Progress Of Implementation Of Cooperative Agreement Project

Mar 10, 2025 Mar 10, 2025

100%

Completed
309

Daily Virtual Meeting With CDC-Kenya To Check Progress Of Implementation Of Cooperative Agreement Project

Feb 24, 2025 Feb 24, 2025

100%

Completed
310

Dairy Stakeholder Meeting For Adoption Of Dairy Strategy

Sep 12, 2024 Sep 12, 2024

100%

Completed
311

Dairy Stakeholder Meeting For The Adoption Of Dairy Strategy

Sep 12, 2024 Sep 12, 2024

100%

Completed
312

Data Collection On Common Integrated Groups (CIGs) Vulnerable And Marginalized Groups (VMGs) And Farmer Beneficiaries

Dec 09, 2024 Dec 13, 2024

100%

Completed
313

Data Validation Meeting On The Completed Household Registration – Venues- At Kirinyaga North And South HQs.

May 09, 2024 May 09, 2024

100%

Completed
314

Data Validation Meeting On The Completed Household Registration – Venues- At Kirinyaga North And South HQs.

May 10, 2024 May 10, 2024

100%

Completed
315

Day 2 Of Hormonal IUD Supervision And Mentorship

Oct 11, 2024 Oct 11, 2024

100%

Completed
316

Day 2 Of Hormonal IUD Supervision And Mentorship

Oct 11, 2024 Oct 11, 2024

100%

Completed
317

Day 2 Of Phase II Malezi Bora Activity

Oct 11, 2024 Oct 11, 2024

100%

Completed
318

Delivery Of Learning Materials To Kirinyaga East Subcountu

Jul 15, 2024 Jul 15, 2024

%

Completed
319

Delivery Of Learning Materials To Mwea East Subcountu

Jul 16, 2024 Jul 16, 2024

%

Completed
320

Delivery Of Learning Materials To Mwea East Subcountu

Nov 30, -0001 Nov 30, -0001

%

Completed
321

Department Advisory Committee Meeting

Jul 18, 2024 Jul 18, 2024

100%

Completed
322

Department Project Progress Reports

May 06, 2024 May 06, 2024

%

Overdue
323

DEPARTMENTAL BUDGET ESTIMATES RESPONSES

May 24, 2024 May 29, 2024

100%

Completed
324

Departmental Meeting

May 03, 2024 May 03, 2024

100%

Completed
325

Departmental Advisory Committee Meeting

Oct 09, 2024 Oct 09, 2024

100%

Completed
326

Departmental Advisory Committee Meeting

Jan 28, 2025 Jan 28, 2025

100%

Completed
327

Departmental Directorates Planning

Sep 02, 2024 Sep 09, 2024

100%

Completed
328

Departmental Directorates Planning

Jul 15, 2024 Jul 22, 2024

100%

Completed
329

Departmental Meeting

May 27, 2024 Nov 30, -0001

100%

Completed
330

Departmental Meeting

Oct 14, 2024 Oct 21, 2024

100%

Completed
331

Departmental Meeting

Oct 30, 2024 Nov 05, 2024

100%

Completed
332

DEPARTMENTAL MEETING

Jul 03, 2024 Jul 03, 2024

100%

Completed
333

Departmental Meeting

Aug 05, 2024 Aug 12, 2024

100%

Completed
334

DEPARTMENTAL MEETING

Jul 29, 2024 Jul 29, 2024

100%

Completed
335

Departmental Meeting

Jul 08, 2024 Jul 08, 2024

%

Completed
336

Departmental Meeting

Jul 08, 2024 Jul 08, 2024

100%

Completed
337

Departmental Meeting

Jun 03, 2024 Jun 03, 2024

100%

Completed
338

Departmental Meeting

Sep 16, 2024 Sep 23, 2024

100%

Completed
339

Departmental Meeting

Jun 10, 2024 Jun 10, 2024

100%

Completed
340

Departmental Meeting

May 20, 2024 May 20, 2024

100%

Completed
341

Departmental Meeting

Sep 30, 2024 Oct 07, 2024

100%

Completed
342

Departmental Meeting

Jun 18, 2024 Jun 18, 2024

100%

Completed
343

DEPARTMENTAL MEETING IN PREPAREDNESS FOR THE PRESIDENTIAL VISIT

Aug 07, 2024 Aug 07, 2024

100%

As A Department We Agreed On Making Sure That All The Sites For Visit Are Thorough And Ready

Completed
344

DEPARTMENTAL MEETING;Office Work

Jan 08, 2025 Jan 08, 2025

%

Overdue
345

Departmental Meetings

Jun 21, 2024 Jun 21, 2024

100%

Completed
346

DEPARTMENTAL PERFOMANCE CONTRACTING VETTING MEETING

Jul 23, 2024 Jul 23, 2024

100%

The Vetting Exercise Went On Well With Members Being Taken Through The Expected Re Alignment Activities For A Good Performance Document

Completed
347

Departmental Performance Review Meeting

Dec 20, 2024 Dec 20, 2024

100%

Completed
348

DEPARTMENTAL PLANNING MEETING ON FINALIZING WORK PLANS

Sep 24, 2024 Sep 24, 2024

100%

Review Done Pending Approval Of The Governor

Completed
349

DEPARTMENTAL REPORTS REVIEW

Apr 26, 2024 Apr 26, 2024

%

Completed
350

Departmental Strategy Meeting With Vtc Principals

Jun 14, 2024 Jun 14, 2024

100%

Completed
351

Departmental Strategy Meeting With Vtc Principals

Nov 30, -0001 Nov 30, -0001

100%

Completed
352

Deployment Of Digital XR With AI Planning Meeting-Virtual, Key Officers- Radiology In Charge.

Jun 10, 2024 Jun 10, 2024

100%

Completed
353

Developing The Annual Development Plan For The Gender & Youth Department

Jul 16, 2024 Jul 16, 2024

100%

Completed
354

Development Of Children Protection Policy

Oct 28, 2024 Oct 28, 2024

100%

Completed
355

Development Of Human Resource And Governance Policies For SACCOS

Aug 22, 2024 Aug 23, 2024

100%

Completed
356

Development Of The Kenya Malaria Strategy 2023-2027 - 3rd – 7th June 2024; Venue- Naivasha; Key Officers- County Malaria Control Coordinator.

Jun 03, 2024 Jun 07, 2024

100%

Completed
357

Development Of The Kirinyaga County Nutrition Action Plan

Nov 25, 2024 Nov 29, 2024

100%

Completed
358

Development Of The Quality-of-Care Assessment Main Report From 3-7 June 2024; Venue- Naivasha; Officer Involved; CDH

Jun 03, 2024 Jun 07, 2024

100%

Completed
359

Directorate Of Culture Training

Jun 10, 2024 Jun 17, 2024

100%

Participants Issued With Completion Certificates By The Ministry.

Completed
360

Directorate Of Liqour Planning

Jun 03, 2024 Jun 10, 2024

100%

Completed
361

Directorate Of Liqour Planning

Jan 07, 2025 Jan 14, 2025

100%

Completed
362

Directorate Of Liqour Planning

Nov 11, 2024 Nov 19, 2024

100%

Completed
363

Directorate Of Liqour Planning

Jun 18, 2024 Jun 25, 2024

100%

Completed
364

Directorate Of Sports Meeting

Jan 07, 2025 Jan 14, 2025

100%

Completed
365

DISASTER MANAGEMENT MEETING

Apr 26, 2024 Apr 26, 2024

100%

Completed
366

Disbursement Of October 2024-September 2025 Contract Letters To LVCT-Dhibiti And Wezesha Afya Projects Supported Staff

Sep 30, 2024 Sep 30, 2024

100%

Completed
367

Disciplinary Advisory Committee

Jun 12, 2024 Jun 13, 2024

100%

Completed
368

Disease Surveillance For Foot And Mouth Disease In All The Wards.

Feb 17, 2025 Feb 21, 2025

%

Completed
369

Disease Surveillance Meeting To Review Animal Bites In Kirinyaga East

Jan 27, 2025 Jan 27, 2025

100%

Completed
370

Dispute Resolution At Kutus Old Town

Aug 05, 2024 Aug 09, 2024

40%

Overdue
371

Dissemination Meeting Of The Kenya Strategic Framework For The Elimination Of Mother-to-child Transmission Of HIV, Hepatitis B, And Syphillis 2023-2027

Jan 29, 2025 Jan 30, 2025

100%

Completed
372

Dissemination Of 2024 NASCOP Data And Service Quality Assessments

Mar 04, 2025 Mar 04, 2025

100%

Completed
373

Dissemination Of Community Integrated Development Manual (CIDP) To The Community Driven Development Committee (CDDC) At The Ward Level.

Dec 02, 2024 Dec 06, 2024

100%

Completed
374

Dissemination Of Community Integrated Development Manual (CIDP) To The Community Driven Development Committee (CDDC) At The Ward Level.

Dec 02, 2024 Dec 06, 2024

%

Completed
375

Dissemination Of The Sessional Paper No. 1 Of 2023 On The Kenya National Population Policy For Sustainable Development

Jul 17, 2024 Jul 17, 2024

100%

Completed
376

Distribution Of ECDE Materials And Uniform To Wards

May 21, 2024 May 24, 2024

100%

Completed
377

Distribution Of ECDE Materials And Uniforms-Murinduko Ward

Jul 16, 2024 Jul 16, 2024

100%

Completed
378

DISTRIBUTION OF ITEMS IN TEBERE WARD

Sep 16, 2024 Sep 16, 2024

100%

Completed
379

Distribution Of Laboratory Commodities And Reagents To Various Health Facilities

Sep 09, 2024 Sep 12, 2024

100%

Completed
380

Distribution Of Meko Gas Cylinders

May 02, 2024 May 02, 2024

100%

Completed
381

Distribution Of Mosquito Nets

Aug 26, 2024 Aug 29, 2024

100%

Completed
382

Distribution Of Vaccines To Rural Health Facilities Officers Involved: Sub-County Nurses

Jun 12, 2024 Jun 13, 2024

100%

Completed
383

Distributors Meeting

Feb 17, 2025 Feb 25, 2025

100%

Completed
384

Division Of TB & Leprosy - Joint Work Planning

Jul 15, 2024 Jul 19, 2024

100%

Completed
385

Drug-Resistance TB Training Of 30 Health Care Workers – Various Venues In The County- CTLC, County Pharmacist From 29-30 May

May 29, 2024 May 30, 2024

100%

Completed
386

E WASTE CONFERENCE

Dec 17, 2024 Dec 17, 2024

100%

Kenyan Situation On E Waste Emission Was Presented As Well As The County Position With Respect To A Possible Solution To The Emission Challenge.

Completed
387

E Water Meeting

Oct 14, 2024 Oct 15, 2024

100%

Completed
388

E Water Meeting At 8pm

Jul 08, 2024 Jul 09, 2024

100%

Completed
389

E Water Meeting On Gathigiriri Project

Oct 16, 2024 Oct 16, 2024

100%

We Went Round And Were Satisfied That The Extension Sought Was Necessary And That The Would Would Reap More Benefits

Completed
390

E WATER TEAM MEETING ON MURUBARA BOREHOLE

Jul 17, 2024 Jul 17, 2024

100%

This Meeting Took Place At Murubara Primary School And It Was Agreed That For Every Step The E Water Wants To Make Pertaining The Water Issue It Must Be Within The SPA As Agreed.

Completed
391

Early Childhood Curriculum Development Workshop

Dec 09, 2024 Dec 13, 2024

100%

Completed
392

Earth View Meeting

May 29, 2024 May 30, 2024

100%

Completed
393

Earthview Meeting

Jul 25, 2024 Jul 26, 2024

100%

Completed
394

EARTHVIEW SMART METERS MEETING

Jul 25, 2024 Jul 25, 2024

100%

The Meeting Successfully Addressed The Issues That Had Been Identified And With Correct Legal Input From The County Attorney Resolved To Go On As Per The Contract Agreement

Completed
395

EKYAN Briefing Meeting

May 28, 2024 May 28, 2024

100%

Completed
396

Electronic Community Health Information System (eCHIS) Superuser Training At Machakos From 27-28 May 2024 - CHRIO, IT Officer, Community Health Strategy Focal Person.

May 27, 2024 May 28, 2024

100%

Completed
397

Electronic-Community Health Information System (e-CHIS) Training

Aug 05, 2024 Aug 06, 2024

100%

Completed
398

Electronic-Community Health Information System (e-CHIS) Training

Aug 07, 2024 Aug 08, 2024

100%

Completed
399

Elimination Of Mother-To-Child Transmission Quarterly TWG Meeting

Nov 07, 2024 Nov 07, 2024

100%

Completed
400

Elimination Of Mother-To-Child Transmission Quarterly TWG Meeting;

Nov 14, 2024 Nov 14, 2024

100%

Completed
401

Emergency Maternal, Obstetric And Neonatal Care (EmONC) Training In Mwea East And West

Mar 11, 2025 Mar 13, 2025

100%

Completed
402

Empowerment Fund Meeting

Nov 15, 2024 Nov 15, 2024

100%

Completed
403

Empowerment Fund Meeting

Jul 18, 2024 Jul 18, 2024

100%

Completed
404

Empowerment Fund Meeting

Jun 07, 2024 Jun 07, 2024

100%

Completed
405

Empowerment Fund Meeting

Oct 07, 2024 Oct 07, 2024

100%

Completed
406

End Of Year Status Report

Jul 08, 2024 Jul 15, 2024

100%

Submitted To CEC Finance

Completed
407

Enforcement Of Alcoholic Drinks Outlets

May 07, 2024 Jun 30, 2024

80%

Completed
408

Enforcement Of Alcoholic Drinks Outlets

May 20, 2024 May 24, 2024

100%

Completed
409

Enforcement Of Revenue

Jul 05, 2024 Jul 05, 2024

0%

Completed
410

Enforcement Visits

Aug 26, 2024 Aug 30, 2024

%

Overdue
411

Engagement With Safaricom On Digital Learning.

Jun 24, 2024 Jun 24, 2024

100%

Completed
412

ENGANGEMENT WITH DIRECTOR WATER ON CIDU

Jan 23, 2025 Jan 23, 2025

100%

We Already Have Data On All The Micro Irrigation Projects In The County Per Sub-county And Ward. The Process Of Operationalization Of CIDU Is Ongoing With Policy And Other Legal Frameworks Underway.

Completed
413

Enquiries On Land Matters.

May 30, 2024 Jun 30, 2024

80%

Overdue
414

Entomological Surveillance Planning Tool (ESPT) Practitioner Workshop

Oct 08, 2024 Oct 11, 2024

100%

Completed
415

Entomological Surveillance Training For Effective Mosquito Surveillance And Control

Feb 17, 2025 Feb 21, 2025

100%

Completed
416

Entry Meeting On Meru University Research Study In Kirinyaga County

Mar 11, 2025 Mar 11, 2025

100%

Completed
417

Entry Meeting With CHS On TB Support To Kirinyaga County

Nov 20, 2024 Nov 20, 2024

100%

Completed
418

Environment Committee Meeting

May 23, 2024 May 24, 2024

100%

Completed
419

Environment Committee Meeting

May 30, 2024 May 31, 2024

100%

Completed
420

ESP Market

Nov 20, 2024 Nov 20, 2024

%

Completed
421

ESP Kimbimbi Market;Foodstuff Distribution

May 16, 2024 May 16, 0224

%

Completed
422

ESP Markets And Other Markets

Jul 03, 2024 Jul 03, 2024

%

Completed
423

ESP Markets: Cooperatives

Sep 25, 2024 Sep 25, 2024

%

Completed
424

Evaluation Meeting On Flloca Perfomance

Jun 06, 2024 Jun 06, 2024

100%

The Meeting Was Able To Address On All Issues Pertaining The Requirements For Both CCIS And CCRI

Completed
425

Evaluation Of The Inspection Process Of Slaughter Slabs And Supervision Of Meat Inspection In Ndia And Kirinyaga Central

May 13, 2024 May 17, 2024

100%

Completed
426

Event Based Surveillance Training

Nov 04, 2024 Nov 05, 2024

100%

Completed
427

Event Based Surveillance Training And Mentorship Of Community Health Extension Workers And Animal Health Assistants

Nov 11, 2024 Nov 12, 2024

100%

Completed
428

Event Based Surveillance Training Of Sub-County Teams

Nov 07, 2024 Nov 08, 2024

100%

Completed
429

Ewater Meeting

Oct 16, 2024 Oct 17, 2024

100%

Completed
430

Ewater Meeting

Jul 31, 2024 Aug 01, 2024

100%

Completed
431

External Auditors Meeting

Oct 04, 2024 Oct 04, 2024

100%

Completed
432

Facility Based Electronic Medical Records Training Schedules

Nov 25, 2024 Nov 28, 2024

100%

Completed
433

Facility Based Electronic Medical Records Training Schedules

Nov 25, 2024 Nov 28, 2024

100%

Completed
434

Farmer Cooperatives And SACCOs Data Analysis And Report Writing

May 03, 2024 May 04, 2024

100%

Completed
435

Fast-track Land Purchases Process

May 06, 2024 May 10, 2024

100%

Valuation Done

Completed
436

Field Work

Oct 25, 0224 Oct 25, 2024

%

Completed
437

Field Activity

Jun 21, 2024 Jun 21, 2024

100%

Completed
438

Field Activity

Sep 27, 2024 Sep 27, 2024

100%

Completed
439

Field Activity

Oct 01, 2024 Oct 01, 2024

100%

Completed
440

Field Activity

Oct 03, 2024 Oct 03, 2024

100%

Completed
441

Field Activity

Oct 09, 2024 Oct 10, 2024

100%

Completed
442

Field Activity

Jun 27, 2024 Jun 28, 2024

100%

Completed
443

Field Activity

Jul 25, 2024 Jul 26, 2024

100%

Completed
444

Field Activity

Oct 17, 2024 Oct 18, 2024

100%

Completed
445

Field Activity

Oct 22, 2024 Oct 23, 2024

100%

Completed
446

Field Activity

Jul 11, 2024 Aug 11, 2024

100%

Completed
447

Field Activity

Oct 24, 2024 Oct 25, 2024

100%

Completed
448

Field Activity

Oct 18, 2024 Oct 19, 2024

100%

Completed
449

Field Activity

Nov 26, 2024 Nov 27, 2024

100%

Completed
450

Field Activity

Aug 01, 2024 Aug 02, 2024

100%

Completed
451

Field Activity

Dec 10, 2024 Dec 11, 2024

100%

Completed
452

Field Activity

Nov 05, 2024 Nov 06, 2024

100%

Completed
453

Field Activity

Aug 12, 2024 Aug 13, 2024

100%

Completed
454

Field Activity

Aug 19, 2024 Aug 20, 2024

100%

Completed
455

Field Activity

May 20, 2024 May 21, 2024

100%

Completed
456

Field Activity And Ngomano Intake Nyangati Ward

Jul 09, 2024 Jul 10, 2024

100%

Completed
457

Field Activity At Baragwi And Ngariama Wards

Jun 03, 2024 Jun 04, 2024

100%

Completed
458

Field Activity At Baragwi Ward

Aug 20, 2024 Aug 21, 2024

100%

Completed
459

Field Activity At Inoi

Jun 11, 2024 Jun 12, 2024

100%

Completed
460

Field Activity At Kerugoya Ward

May 21, 2024 May 22, 2024

100%

Completed
461

Field Activity At Kerugoya Ward

Aug 21, 2024 Aug 22, 2024

100%

Completed
462

Field Activity At Kerugoya Ward

Dec 11, 2024 Dec 11, 2024

100%

Completed
463

Field Activity At Kerugoya Ward

May 31, 2024 May 31, 2024

100%

Completed
464

Field Activity At Kerugoyaward

Jun 10, 2024 Jun 11, 2024

100%

Completed
465

Field Activity At Kianduro

May 30, 2024 May 31, 2024

100%

Completed
466

Field Activity At Kianyaga Water Company

May 22, 2024 May 23, 2024

100%

Completed
467

Field Activity At Kibaratani Village

Jun 28, 2024 Jun 29, 2024

100%

Completed
468

Field Activity At Mukure Ward

Nov 27, 2024 Nov 28, 2024

100%

Completed
469

Field Activity At Mukure Ward

Jul 03, 2024 Jul 04, 2024

100%

Completed
470

Field Activity At Muratiri Treatment Plant

Jun 14, 2024 Jun 15, 2024

100%

Completed
471

Field Activity At Mutira Ward

May 27, 2024 May 28, 2024

100%

Completed
472

Field Activity At Mutira Ward

May 22, 2024 May 23, 2024

100%

Completed
473

Field Activity At Mutithi

Nov 30, -0001 Nov 30, -0001

100%

Completed
474

Field Activity At Mutithi

Nov 18, 2024 Nov 19, 2024

100%

Completed
475

Field Activity At Mutithi Ward

May 28, 2024 May 29, 2024

100%

Completed
476

Field Activity At Mutithi Ward

Jul 02, 2024 Jul 03, 2024

100%

Completed
477

Field Activity At Ngariama And Mukure Wards

Aug 26, 2024 Aug 27, 2024

100%

Completed
478

Field Activity At Ngariama Ward

Jun 13, 2024 Jun 14, 2024

100%

Completed
479

Field Activity At Njukiini Ward -Kianduro Water Project.

Jun 05, 2024 Jun 05, 2024

100%

Completed
480

Field Activity At Nyangati Ward

Jul 03, 2024 Jul 04, 2024

100%

Completed
481

Field Activity At Nyangati Ward

Aug 07, 2024 Aug 08, 2024

100%

Completed
482

Field Activity At Nyangatiward

Jul 12, 2024 Jul 13, 2024

100%

Completed
483

Field Activity At Rukanga

Dec 05, 2024 Dec 06, 2024

100%

Completed
484

Field Activity At Rukanga Water Company

Jul 04, 2024 Jul 05, 2024

100%

Completed
485

Field Activity At Tebere Ward

May 23, 2024 May 24, 2024

100%

Completed
486

Field Activity At Thiba Ward

Jul 01, 2024 Jul 02, 2024

100%

Completed
487

Field Activity At Wamumu Ward

Aug 07, 2024 Aug 08, 2024

100%

Completed
488

Field Activity In Gathigiriri And Nyangati Ward

Sep 16, 2024 Sep 17, 2024

100%

Completed
489

Field Activity Mukure Ward

May 24, 2024 May 24, 2024

100%

Completed
490

Field At Kiangai Water Project

May 30, 2024 May 31, 2024

100%

Completed
491

Field Day

Apr 23, 0004 Apr 23, 2024

%

Completed
492

Field Day On Cooperatives ,Weights And Measures

Apr 29, 2024 May 06, 2024

%

Completed
493

Field Visit

May 06, 2024 May 10, 2024

%

Overdue
494

Field Visit At Richugu Water

Aug 29, 2024 Aug 30, 2024

100%

Completed
495

Field Visit To Ascertain Level Of Compliance Of Alcoholic Drink Outlets

Jun 24, 2024 Jun 28, 2024

0%

Completed
496

Field Visit To Ascertain Level Of Compliance Of Alcoholic Drink Outlets

Jul 22, 2024 Jul 26, 2024

100%

Completed
497

Field Visit To Ascertain Level Of Compliance Of Alcoholic Drink Outlets

Apr 22, 2024 Apr 22, 2024

%

Completed
498

Field Visit To Ascertain Level Of Compliance Of Alcoholic Drink Outlets

Apr 23, 2024 Apr 23, 2024

%

Completed
499

Field Visit To Ascertain Level Of Compliance Of Alcoholic Drink Outlets

Apr 30, 2024 Apr 30, 2024

%

Completed
500

Field Visit To Ascertain Level Of Compliance Of Alcoholic Drink Outlets

May 03, 2024 May 03, 2024

%

Completed
501

Field Visit To Ascertain Level Of Compliance Of Alcoholic Drink Outlets

May 06, 2024 May 06, 2024

%

Completed
502

Field Visit To Ascertain Level Of Compliance Of Alcoholic Drink Outlets

Jun 03, 2024 Jun 07, 2024

100%

Completed
503

Field Visit To Ascertain Level Of Compliance Of Alcoholic Drink Outlets

Jul 01, 2024 Jul 31, 2024

100%

Completed
504

Field Work

Sep 06, 2024 Sep 06, 2024

%

Overdue
505

Field Work

May 06, 2024 May 06, 2024

100%

Visted 9 Site At Kerugoya [inoi-2, Mutira-7]

Completed
506

Field Work

May 08, 2024 May 09, 2024

100%

Completed
507

Field Work

Nov 07, 2024 Nov 07, 2024

%

Completed
508

Finalising With Senate Documents

Jun 18, 2024 Jun 18, 2024

100%

Completed
509

Finalization Of Financial Obligation

Jun 18, 2024 Jun 18, 2024

100%

Completed
510

Finalization Of Report On Reprocessing Of Medical Devices From 3-7 June 2024; Venue- Naivasha; Officer Involved; IPC Focal Person

Jun 03, 2024 Jun 07, 2024

100%

Completed
511

Finalization Of The Hospital Acquired Infections (HAI) Surveillance Training Package

Nov 11, 2024 Nov 15, 2024

100%

Completed
512

Finalizing On Departmental ADP For Onward Submission To Finance

Jul 15, 2024 Jul 15, 2024

100%

ADP Done And Submitted

Completed
513

FINANCIAL MANAGEMENT FIF BUDGET VOTES

May 20, 2024 May 21, 2024

0%

Completed
514

Financial Management Training For Facility In Charges

Feb 25, 2025 Feb 25, 2025

100%

Completed
515

Financial Management- CT Scan Audit At Kerugoya L 5

May 06, 2024 May 08, 2024

0%

Completed
516

FINANCIAL MANAGEMENT- FIF REGULATIONS

Jul 02, 2024 Jul 02, 2024

%

Completed
517

Financial Management-FIF REGULATIONS

May 06, 2024 May 06, 2024

%

Completed
518

Financial Management-FIF SECRETARIAT OFFICES

May 07, 2024 May 07, 2024

0%

Completed
519

Firestation Progress Meeting

Jul 29, 2024 Aug 02, 2024

%

Overdue
520

FLLoCA ASSESSMENT MEETING IN NAIVASHA BY OAG

May 28, 2024 May 31, 2024

100%

The Assessment By OAG On The Third CCIS Happened And We Met All The Requisite Conditions.

Completed
521

FLOCCA MEETING WITH PIU ON PROJECT MANAGEMENT COMMITTEES PROGRESS

Jan 13, 2025 Jan 13, 2025

100%

This Meeting Was Postponed To A Later Date

Completed
522

Flood Management Budget Proposals

Apr 23, 2024 Apr 24, 2024

%

Overdue
523

Flood Management Data Processing

Apr 23, 2024 Apr 23, 2024

%

Completed
524

Floodlights Repair And Maintenance Program

May 13, 2024 May 17, 2024

%

Overdue
525

Follow Up On The On The NITA Programme On Prior Knowledge Compliance

Nov 30, -0001 Nov 30, -0001

100%

Completed
526

Follow-up And Mentorship Of CHPs Trained In ICCM 4-7 June 2024; Officers Involved; Community Health Focal Person; CCO

Jun 11, 2024 Jun 11, 2024

100%

Completed
527

Follow-up And Mentorship Of CHPs Trained In ICCM From 4th-7th June 2024; Officers Involved; Community Health Focal Person; CCO

Jun 04, 2024 Jun 07, 2024

100%

Completed
528

Following Up Of The Preparedness Of Kiangungu Pry And Kirinyaga Central Polytechnic Ahead Of The Presidential Visit

Aug 09, 2024 Aug 09, 2024

0%

Completed
529

Following/enhancing Ecde Milk Feeding Programme

Jun 04, 2024 Jun 10, 2024

100%

Completed
530

FOOD DISTRIBUTION

May 21, 2024 May 23, 2024

%

Overdue
531

Food Program

May 16, 2024 May 16, 2024

100%

Completed
532

Formulating The Procurement Plan For The Gender Department

Aug 22, 2024 Aug 22, 2024

100%

Completed
533

Formulating The Workplans For The Administrative Department

Aug 21, 2024 Aug 21, 2024

100%

Completed
534

Formulating WorkPlans For The Gender Department

Aug 19, 2024 Aug 19, 2024

100%

Completed
535

Formulation Of Mental Health Policy- Meeting At DG Boardroom With Consultants, Dep. Of Gender, Health And Finance.

May 02, 2024 May 02, 2024

100%

Completed
536

Formulation Of Mental Health Policy- Meeting At DG Boardroom With Consultants, Dep. Of Gender, Health And Finance.

May 03, 2024 May 03, 2024

100%

Completed
537

Formulation Of The County Development Strategy Document For Investments Of Priority Value Chains( Coffee, Bananas,Avocado, And Tomatoes)

Jul 29, 2024 Aug 02, 2024

100%

Completed
538

Full Board Meeting At KICOWASCO

Aug 16, 2024 Aug 17, 2024

100%

Completed
539

FY 24/ 25 Planning

Jul 22, 2024 Jul 29, 2024

100%

Completed
540

FY 24/ 25 Planning

Jul 22, 2024 Jul 29, 2024

100%

Completed
541

FY 24/ 25 Planning

May 27, 2024 Jun 03, 2024

100%

Completed
542

FY 24/ 25 Planning

Sep 09, 2024 Sep 16, 2024

100%

Completed
543

FY 24/25 Mid-Term Performance Review Meeting

Jan 29, 2025 Jan 29, 2025

80%

Completed
544

FY 24/25 Mid-Term Performance Review Meeting;

Jan 30, 2025 Jan 30, 2025

100%

Completed
545

FY23/24 Annual Performance Review Meeting

Oct 16, 2024 Oct 16, 2024

100%

Completed
546

FY23/24 Annual Performance Review Meeting

Oct 17, 2024 Oct 17, 2024

100%

Completed
547

FY24/25 Q1 Continuous Quality Improvement Review Meeting

Nov 06, 2024 Nov 06, 2024

100%

Completed
548

G 7 Planning Meeting

Sep 04, 2024 Sep 04, 2024

100%

Completed
549

G7

Sep 26, 2024 Sep 26, 2024

%

Completed
550

G7 Activation KIRINYAGA CHAPTER

Sep 26, 2024 Sep 26, 2024

100%

The Department Participated Fully.

Completed
551

G7 Caucus Visit To Kirinyaga County

Sep 26, 2024 Sep 26, 2024

100%

Completed
552

G7 Meeting

Sep 23, 2024 Sep 24, 2024

100%

Completed
553

G7 Meeting

Sep 24, 2024 Sep 25, 2024

100%

Completed
554

G7 Meeting

Sep 25, 2024 Sep 26, 2024

100%

Completed
555

G7 Meeting

Sep 10, 2024 Sep 11, 2024

100%

Completed
556

G7 Meeting At Kamiigua Grounds

Sep 25, 2024 Sep 25, 2024

100%

Completed
557

G7 Meeting At Machakos

Aug 16, 2024 Aug 16, 2024

100%

Completed
558

G7 PLANNING MEETING

Sep 03, 2024 Sep 03, 2024

100%

A Brief Was Presented And Various Roles Shared Among The Participants Regarding The Preparation Of The G7 Meeting Scheduled For The 26/09/2024

Completed
559

G7 Planning Meeting

Sep 09, 2024 Sep 09, 2024

100%

Progress Report And Further Review Of Progress Of Preparation Of The G7 Meeting

Completed
560

G7 PLANNING MEETING AT KIANYAGA

Sep 23, 2024 Sep 23, 2024

100%

The Meeting Was Done And Fruitful Deliberations On The G7 Activation Arrived At.

Completed
561

G7 PREPARATION MEETING

Nov 30, -0001 Sep 10, 2024

100%

Completed
562

G7 Summit At Kianyaga Stadium

Sep 26, 2024 Sep 26, 2024

100%

Completed
563

G7 Summit At Kwale County

Oct 17, 2024 Oct 18, 2024

100%

Completed
564

G7M Meeting

Sep 13, 2024 Sep 14, 2024

100%

Completed
565

G7Meeting

Sep 11, 2024 Sep 12, 2024

100%

Completed
566

GBV Activism Celebration At Kerugoya

Dec 10, 2024 Dec 10, 2024

100%

Completed
567

GBV Community Orientation Package ToT Training

Dec 16, 2024 Dec 20, 2024

100%

Completed
568

GBVRC Site Visit At Kerugoya

Jul 04, 2024 Jul 04, 2024

100%

Completed
569

Gender & Youth Departmental Meeting With The CS

Jul 17, 2024 Jul 17, 2024

100%

Completed
570

Gender & Youth Meeting To Plan Activities On 16 Days Of GBV Activism

Nov 13, 2024 Nov 13, 2024

100%

Completed
571

Gender & Youth Meeting To Plan On The 16 Days Of GBV Activism

Nov 21, 2024 Nov 21, 2024

100%

Completed
572

Gender & Youth Meeting To Plan The International Day For PWD

Dec 04, 2024 Dec 04, 2024

100%

Completed
573

Gender And Youth Departmental Meeting

Jul 24, 2024 Jul 24, 2024

100%

Completed
574

Gender And Youth Departmental Meeting

Aug 27, 2024 Aug 27, 2024

100%

Completed
575

Gender And Youth Departmental Meeting

Sep 03, 2024 Sep 03, 2024

100%

Completed
576

Gender And Youth Departmental Meeting

Jun 26, 2024 Jun 26, 2024

100%

Completed
577

Gender And Youth Departmental Meeting

Oct 01, 2024 Oct 01, 2024

100%

Completed
578

Gender And Youth Departmental Meeting

Oct 15, 2024 Oct 15, 2024

100%

Completed
579

Gender And Youth Meeting On GBV Activism

Nov 06, 2024 Nov 06, 2024

100%

Completed
580

Gender And Youth Meeting To Plan GBV Activism Celebration

Dec 09, 2024 Dec 09, 2024

100%

Completed
581

Gender Departmental Meeting

Aug 07, 2024 Aug 07, 2024

100%

Completed
582

Gender Departmental Meeting

Aug 08, 2024 Aug 08, 2024

100%

Completed
583

Gender-Based Violence (GBV) Services Quality Assurance Supervision 3rd – 7th June 2024-Countrywide; Officer Involved; GBV Focal Person

Jun 03, 2024 Jun 07, 2024

100%

Completed
584

Gender-Based Violence Technical Working Group Meeting – Nice Digital Hotel.

May 22, 2024 May 22, 2024

100%

Completed
585

General Office Administration - Kutus And Kerugoya Offices

May 27, 2024 May 31, 2024

0%

Completed
586

General Office Administration - Kutus And Kerugoya Offices

Jul 01, 2024 Jul 05, 2024

%

Overdue
587

General Office Administration - Kutus And Kerugoya Offices

May 07, 2024 May 07, 2024

0%

Completed
588

General Office Administration - Kutus And Kerugoya Offices

May 08, 2024 May 10, 2024

0%

Completed
589

General Office Administration - Kutus And Kerugoya Offices

May 14, 2024 May 14, 2024

0%

Completed
590

General Office Administration - Kutus And Kerugoya Offices

May 20, 2024 May 24, 2024

0%

Completed
591

General Office Administration - Kutus And Kerugoya Offices

Jun 24, 2024 Jun 28, 2024

0%

Completed
592

GICHUGU GROUP VISITS

Jun 07, 2024 Jun 07, 2024

100%

Completed
593

Gichugu Water Company Staff Meeting

Sep 11, 2024 Sep 12, 2024

100%

Completed
594

Gichugu Water Company Staff Meeting

Sep 10, 2024 Sep 11, 2024

100%

Completed
595

Gichugu Water Meeting

Jul 22, 2024 Jul 23, 2024

100%

Completed
596

Gichugu Water Meeting

Oct 15, 2024 Oct 16, 2024

100%

Completed
597

Gichugu Water Meeting

Sep 09, 2024 Sep 10, 2024

100%

Completed
598

Global Handwashing Day Commemoration Activities

Oct 15, 2024 Oct 15, 2024

100%

Completed
599

GOVERNOR MINJI MINJ FOOTBALL CUP

May 20, 2024 May 24, 2024

100%

Completed
600

GOVERNOR"S CUP

Sep 02, 2024 Sep 30, 2024

%

Overdue
601

Governors Cup Execution

Mar 11, 2025 Mar 18, 2025

%

Overdue
602

Governors Cup Launch Planning

Dec 04, 2024 Dec 11, 2024

100%

Awaiting Communication

Completed
603

Governors Cup Tournament Forecasting

Aug 27, 2024 Sep 03, 2024

100%

Completed
604

Grading And Murraming Of Roads In Kabare Ward

May 27, 2024 May 31, 2024

0%

Completed
605

Grading And Murraming Of Roads In Mutithi Ward

Jun 03, 2024 Jun 10, 2024

0%

Completed
606

Graduation Ceremony At Our Lady Of Lourdes College

Nov 29, 2024 Nov 29, 2024

100%

Completed
607

Grant Meeting With CS;Budget Utilization Meeting Yr 24/25;Industrial Park

Aug 27, 2024 Aug 27, 2024

%

Overdue
608

GREEN FINANCING MEETING

Dec 02, 2024 Dec 02, 2024

100%

The Meeting Culminated With A Training  By ADA And PWC With View To Coming With  Proper Project Proposals For Funding Under Green Financing.

Completed
609

Ground Preparation /inspection At Kiangungu Pry School And Kirinyaga Central Tvet In Readiness To Presidential Visit

Aug 08, 2024 Aug 08, 2024

%

Completed
610

GROUP VISIT IN GICHUGU

Jun 21, 2024 Jun 21, 2024

100%

Completed
611

Group Meeting With Nduma SHG At Kimbimbi, Mwea

Aug 08, 2024 Aug 08, 2024

100%

Completed
612

GROUP VISIT

Jun 25, 2024 Jun 25, 2024

100%

Completed
613

GROUP VISIT

Jul 01, 2024 Jul 01, 2024

100%

Completed
614

GROUP VISIT

Jul 04, 2024 Jul 04, 2024

100%

Completed
615

GROUP VISIT

Jul 09, 2024 Jul 09, 2024

100%

Completed
616

Group Visit At KARII, Kangai

Aug 01, 2024 Aug 01, 2024

100%

Completed
617

Group Visit At Baricho

Jul 30, 2024 Jul 30, 2024

100%

Completed
618

Group Visit At Njukiini Ward

Jul 25, 2024 Jul 25, 2024

100%

Completed
619

GROUP VISITS

Jun 03, 2024 Jun 03, 2024

100%

Completed
620

GROUPS VISIT

Jul 11, 2024 Jul 11, 2024

100%

Completed
621

GROUPS VISIT

Jul 02, 2024 Jul 02, 2024

100%

Completed
622

GROUPS VISIT

Jul 03, 2024 Jul 03, 2024

100%

Completed
623

GROUPS VISIT AT MWEA WEST

Jun 06, 2024 Jun 06, 2024

100%

Completed
624

HAND OVER OF THIBA DAM CONSTRUCTED BUILDINGS TO THE COUNTY GOVERNMENT OF KIRINYAGA

Aug 08, 2024 Aug 08, 2024

100%

The Hand Over Exercise Took Place As Planned Both At The Office For Documentation Signing As Well As At The Site For Physical Inspection Of The Condition Of The Infrastructure Before Finally Taking Over The Keys

Completed
625

Handling Office Correspondence

May 06, 2024 May 10, 2024

100%

Completed
626

Handling Office Correspondence

May 08, 2024 May 08, 2024

100%

Completed
627

Handling Office Correspondence

May 13, 2024 May 13, 2024

100%

Completed
628

Health Facilities In Charges Meeting

Mar 25, 2025 Mar 25, 2025

100%

Completed
629

Health Facility Assessment For The Private Sector To Monitor Quality Of Malaria Care-Sensitization Meeting

Feb 24, 2025 Feb 24, 2025

100%

Completed
630

Health Products And Technologies Unit Meeting

Jan 21, 2025 Jan 21, 2025

100%

Completed
631

Health Sector Intergovernmental Consultative Forum From 4th-6th June 2024; Key Officers; CECM

Jun 04, 2024 Jun 06, 2024

100%

Completed
632

Health Sector Workload Indicators For Staffing Needs (WISN)

Dec 02, 2024 Dec 03, 2024

100%

Completed
633

Hellen Keller International Close-out Meeting

Dec 09, 2024 Dec 09, 2024

100%

Completed
634

Hemovigilance And Facility Transfusion Committee Sensitization Meeting In Laikipia County; Officers; 6 Officers From Kerugoya CRH

Jun 18, 2024 Jun 20, 2024

100%

Completed
635

Her Excellency Meeting

Sep 17, 2024 Sep 18, 2024

100%

Completed
636

HIV Committee Meeting

Dec 18, 2024 Dec 18, 2024

100%

Completed
637

HIV Implementing Partners Expenditure And HRH Reporting Training

Oct 15, 2024 Oct 18, 2024

100%

Completed
638

HIV Integration Summit – Pride Inn Mombasa; Officers CECM, CoH, CDH, CASCO

Jun 18, 2024 Jun 21, 2024

100%

Completed
639

HIV Key Populations Technical Working Group Meeting At Nice Digital Hotel.

May 17, 2024 May 17, 2024

100%

Completed
640

HIV Monitoring And Evaluation Tools Training

Sep 18, 2024 Sep 19, 2024

100%

Completed
641

HIV/TB Data Review Meeting

Sep 30, 2024 Sep 30, 2024

100%

Completed
642

HMIS FOLLOW UP

Aug 26, 2024 Aug 26, 2024

100%

Completed
643

Hold A Meeting With The Chief Officer And The Three Directors In The Department,

Aug 29, 2024 Nov 30, -0001

100%

Completed
644

Hormonal Family Planning Trainer Of Trainers Training From 29-31 May– 6 Health Care Workers At Thika

May 29, 2024 May 31, 2024

100%

Completed
645

Hormonal Intra-uterine Devices Training Of Health Care Workers

Jul 29, 2024 Jul 31, 2024

100%

Completed
646

Hormonal Intrauterine Device Family Planning Support Supervision At Sub-county Level

Oct 01, 2024 Oct 03, 2024

100%

Completed
647

Hormonal IUD Supervision And Mentorship

Oct 08, 2024 Oct 08, 2024

100%

Completed
648

Hosting Visitors

Aug 21, 2024 Aug 21, 2024

100%

Completed
649

HR MANAGEMENT-MEETING WITH CPSB

Jun 03, 2024 Jun 07, 2024

0%

Completed
650

Human Rights, Gender And Medical Ethics Training From 27-29 May 2024. CASCO To Attend-delegated To SCASCO Kirinyaga East.

May 27, 2024 May 29, 2024

100%

Completed
651

ICD-11 Training At Eseriani Hotel, Naivasha; Officer Involved; KCRH Medical Officer (Trainer)

Jun 18, 2024 Jun 21, 2024

100%

Completed
652

IDSR Evaluation And Baseline Assessment

Sep 09, 2024 Sep 13, 2024

100%

Completed
653

IMMERSE Study – Malaria -Training In Kilifi

Jul 22, 2024 Jul 24, 2024

100%

Completed
654

Immunization Support Supervision To Immunizing Facilities

Jan 13, 2025 Jan 17, 2025

100%

Completed
655

Impromptu Spot Check On Kagio, Kibirigwi, Sagana And Kerugoya

Aug 01, 2024 Aug 01, 2024

100%

This Impromptu Check Is A Re Affirmation That The Actual Activities Of Cleaning And Collection Of Garbage Are Going On As Planned

Completed
656

IMPROMPTU SPOT CHECK ON KANDONGU, KAGIO AND MUTITHI TOWNS

Jul 12, 2024 Nov 30, -0001

100%

The Towns Are Neat And Clean.

Completed
657

In The Office Attending To Clients

Jun 03, 2024 Nov 30, -0001

70%

Completed
658

Incorporation Of Health Care Infection Surveillance Training Package Into The MoH Virtual Academy Curriculum

Nov 25, 2024 Nov 29, 2024

100%

Completed
659

Induction Of Hospital Board Members

Feb 21, 2025 Feb 21, 2025

100%

Completed
660

Industrial Park;RECCE

Sep 10, 2024 Sep 10, 0224

%

Completed
661

Industrial Park

Nov 13, 2024 Dec 13, 2024

%

Completed
662

Industrial Park

Nov 19, 2024 Nov 19, 2024

%

Completed
663

Industrial Park

Nov 28, 2024 Nov 28, 2024

%

Completed
664

Industrial Park

Oct 15, 2024 Oct 15, 2024

%

Completed
665

Industrial Park

Oct 21, 2024 Oct 21, 2024

%

Completed
666

Industrial Park

Aug 09, 2024 Aug 09, 2024

%

Completed
667

Industrial Park Meeting

May 29, 2024 May 30, 2024

100%

Completed
668

Industrial Park Meeting

Oct 28, 2024 Oct 29, 2024

100%

Completed
669

Industrial Park Meeting

Jul 31, 2024 Aug 01, 2024

100%

Completed
670

Industrial Park Perimeter Wall BQ Follow-up

May 13, 2024 May 16, 2024

%

Overdue
671

Information Sourcing On Operation Of Agricultural Revolving Funds For County Agricultural Institutions In Nyandarua County

May 22, 2024 May 23, 2024

100%

Completed
672

INOI WARD FOOTBALL TOURNAMENT

Jul 29, 2024 Aug 04, 2024

%

Overdue
673

Inspection Exercise

Jul 08, 2024 Jul 09, 2024

%

Overdue
674

Inspection Of Desilting Of Canals In Mwea

May 27, 2024 May 31, 2024

0%

Completed
675

Inspection Of Kerugoya CRH As A Training Site For The East, Central And Southern Africa College Of Paediatrics And Child Health(ECSAPACH) – Officers Involved- Paeditrician And Hospital Manager

Jun 10, 2024 Jun 10, 2024

100%

Completed
676

Inspection Of Medical Facilities By Kenya Medical Practitioners And Dentists Council

Feb 17, 2025 Feb 21, 2025

100%

Completed
677

Inspection Of Slaughter Slabs In Mwea West

May 21, 2024 May 21, 2024

100%

Completed
678

Inspection Visit At Kaitheri Apparel

Sep 05, 2024 Sep 05, 2024

100%

Completed
679

Inspection Visit At Kaitheri Apparel And GBVC

Oct 30, 2024 Oct 30, 2024

100%

Completed
680

Installation And Integration Of Artificial Intelligence Systems With Digital X-Ray At Kimbimbi Sub-County Hospital.

May 17, 2024 May 17, 2024

100%

Completed
681

Installation Of Digital X-ray Unit At Kerugoya CRH By LVCT-Health

Jan 30, 2025 Jan 30, 2025

100%

Completed
682

Integrated Community Case Management (ICCM) Training In Mandera County

Oct 28, 2024 Nov 08, 2024

100%

Completed
683

Integrated Community Case Management (ICCM) Training In Mandera County

Nov 04, 2024 Nov 08, 2024

100%

Completed
684

Integrated HIV Service And Data Quality Assessment At Facility Level

Nov 05, 2024 Nov 08, 2024

100%

Completed
685

Integrated HIV/TB Support Supervision

Dec 09, 2024 Dec 13, 2024

100%

Completed
686

Integrated HIV/TB Support Supervision

Dec 16, 2024 Dec 17, 2024

100%

Completed
687

Interdepartmental G7 Preparation Meetings

Sep 11, 2024 Sep 13, 2024

100%

Completed
688

Interdepartmental G7 Preparation Meetings

Sep 17, 2024 Sep 19, 2024

100%

Completed
689

Interdepartmental Meeting Ahead Of G7 Kirinyaga

Sep 02, 2024 Sep 02, 2024

100%

Completed
690

Introduction Of Digital Health Systems On Payment Of CHPs– Virtual Sensitization

Feb 27, 2025 Feb 27, 2025

100%

Completed
691

Introduction Of The Kirinyaga County FIF Board To CHMT And Senior Health Managers

Mar 03, 2025 Mar 03, 2025

100%

Completed
692

Inventorization Of Irrigation Schemes

Jul 08, 2024 Jul 12, 2024

100%

Completed
693

Invitation To A Public Service And Administration Meeting At Nakuru

Aug 14, 2024 Aug 17, 2024

%

Completed
694

Issuance And Collection Of Acknowledgement Receipts For Sponsorship Bursary

May 17, 2024 May 17, 2024

100%

Completed
695

Issuance Of Breast Prosthetics To 30 Breast Cancer Survivors At The Kerugoya CRH Cancer Centre By A Philanthropist From Ireland.

May 23, 2024 May 23, 2024

100%

It Was A Great Blessing To The 32 Women And To Us As A County.

We Received A Philanthropist From Ireland (Mary Keane) Who Visited And Donated 32 Breast Protheses To Women Cancer Survivors.

Completed
696

Issuance Of Breast Prosthetics To Breast Cancer Survivors – CCC Boardroom

Jun 06, 2024 Jun 06, 2024

100%

Completed
697

Issuance Of Bursary

May 07, 2024 May 07, 2024

100%

Completed
698

Issuance Of Bursary

May 09, 2024 May 09, 2024

100%

Completed
699

Issuance Of Mosquito Nets To Mwea Residents

Sep 09, 2024 Sep 09, 2024

100%

Completed
700

Issuance Of Social Health Insurance Scheme Tablets To 74 Public Health Facilities

Sep 30, 2024 Sep 30, 2024

100%

Completed
701

ISSUANCE OF WATER PIPES TO GATHIGIRIRI WATER PROJECTS

Sep 16, 2024 Sep 16, 2024

100%

The Water Pipes Were Issued To The Beneficiaries

Completed
702

ISSUANCE OF WATER PIPES TO MUTITHI WATER PROJECTS

Feb 11, 2025 Feb 11, 2025

100%

The Exercise Of The Issuance Of Water Pipes For Mutithi Ward Went On Very Well Courtesy Of HE The Governor.

Completed
703

Jacaranda Health Data Dashboard Dissemination Meeting

Oct 22, 2024 Oct 22, 2024

100%

Completed
704

Jacaranda Health Data Dashboard Dissemination Meeting;

Oct 23, 2024 Oct 23, 2024

100%

Completed
705

Jamuhuri Meeting At Mutitu Grounds

May 29, 2024 Jun 01, 2024

100%

Completed
706

JICA Mission Visit To Kirinyaga County Department Of Health

Aug 09, 2024 Aug 09, 2024

100%

Completed
707

JICA SAMACH Project JCC Meeting – Sarova Pan Afric Hotel; Officers; CDH, Health Financing Focal Person

Jun 19, 2024 Jun 19, 2024

100%

Completed
708

Joint Consultative Meeting

Aug 26, 2024 Aug 26, 2024

%

Overdue
709

Joint Support Supervision On Global Fund Commodities Review Meeting

Aug 28, 2024 Aug 30, 2024

100%

Completed
710

K WASH BRIEF ON PROGRESS

Aug 26, 2024 Aug 26, 2024

100%

The Meeting Was Successful And Progress On The Preparations Was Discussed.

Completed
711

K WASH STAKEHOLDERS ENGAGEMENT

Sep 13, 2024 Sep 13, 2024

100%

The Public Participation Exercise  On The Preparation Of The County Water And Sanitation Strategy Was Done

Completed
712

K WASH Strategy Update

Jul 03, 2024 Jul 03, 2024

100%

The Meeting Took Place And I Was Briefed On The Progress  Of Activities Undertaken Where Data Collection Was Done And Analysis Was On Going.

Completed
713

K-wash Meeting

Sep 05, 2024 Sep 05, 2024

100%

Completed
714

K-WASH Meeting At Nairobi

Dec 17, 2024 Dec 18, 2024

100%

Completed
715

K-WASH Meeting At Nairobi

Jun 04, 2024 Jun 04, 2024

100%

Completed
716

K-Wash Program Deliberative Meeting

Oct 01, 2024 Oct 01, 2024

100%

Completed
717

KABARE NYANGATI COURT CASES

Jul 22, 2024 Aug 10, 2024

70%

Overdue
718

Kabare Water Meeting

May 24, 2024 May 24, 2024

100%

Completed
719

KABATIRO EVICTION NOTICE

Nov 04, 2024 Nov 29, 2024

%

Overdue
720

Kagio And Kutus Market

Jun 05, 2024 Nov 30, -0001

%

Completed
721

Kagio Market Visit

Apr 22, 2024 Apr 22, 2024

%

Completed
722

Kagumo;Kiangai Market

Nov 29, 2024 Nov 29, 2024

%

Completed
723

Kaitheri Apparel And GBVRC Site Visit At Kerugoya

Sep 20, 2024 Sep 20, 2024

100%

Completed
724

Kaitheri Apparel Center Site Visit

Jun 24, 2024 Jun 24, 2024

100%

Completed
725

Kamiigua G7 Planning MEETING

Sep 11, 2024 Sep 11, 2024

100%

Updates As To The Site, Resource Mobilization And Identification Of Touring Destination Was Done

Completed
726

Kangai Sports Issuance

Aug 12, 2024 Aug 19, 2024

100%

Completed
727

Kangai Ward-Grading And Drainage Improvement Of Marura Road

May 06, 2024 May 10, 2024

%

Overdue
728

Kangaita Old Town Visit

Jul 03, 2024 Jul 03, 2024

100%

We Managed To Clear A Garbage That Had Been Long Covered And Inaccessible, We Were Able To Open Up And Cleared All What Was There. The Area Residents Are Very Happy.

Completed
729

Kariti Ward Unblocking Of Drainages- Around Mjini And Upper Sagana

May 06, 2024 May 08, 2024

%

Overdue
730

KARUMANDE ADP PUBLIC PARTICIPATION

Aug 15, 2024 Aug 15, 2024

100%

The ADP Public Participation Went On Well Though I Was Tasked To Attend To A Crisis Kagio Market Traders Meeting

Completed
731

Keeping Premature Babies Warm In The Labour Ward-The NEWS-HEAT Trial Launch Meeting;

Feb 10, 2025 Feb 11, 2025

100%

Completed
732

Kenya Academy Of Sports Brief

Jul 01, 2024 Jul 08, 2024

100%

Completed
733

Kenya Academy Of Sports Brief

Jun 03, 2024 Jun 10, 2024

100%

Completed
734

Kenya Association Of Family Physicians Conference (5th-7th June) 2024 At Ole Sereni Hotel In Nairobi; Officer Involved-PHC Coordinator

Jun 05, 2024 Jun 07, 2024

100%

Completed
735

Kenya Cooperative Agreement Quarterly Forum

Sep 11, 2024 Sep 11, 2024

100%

Completed
736

Kenya Malaria Survey Costing Meeting

Jul 15, 2024 Nov 30, -0001

100%

Completed
737

Kenya Mentor Mothers Program Annual Cross-Learning And Feedback Forum

Mar 17, 2025 Mar 19, 2025

100%

Completed
738

Kenya Mentor Mothers Program Annual Cross-learning And Feedback-

Mar 11, 2025 Mar 12, 2025

100%

Completed
739

KERUGOYA SPOT CHECK ON EFFLUENTS DISCHARGE

Jul 15, 2024 Jul 15, 2024

100%

Found The Officers From Both Water And Public Health Working On The Area And The Exercise Is Still On

Completed
740

Key Populations Service Delivery Models And Sustainability Meeting

Aug 15, 2024 Aug 15, 2024

100%

Completed
741

KFS REGIONAL MEETING

Nov 13, 2024 Nov 13, 2024

100%

The Meeting Took Place And We Agreed In Principle That We Are Going To Grow Trees Especially In The Public Open Spaces.

Completed
742

KIAMUKA WATER PROJECT VISIT

Oct 09, 2024 Oct 09, 2024

100%

The Project Is Positively Impacting The Lives Of The Farmers Who Have Embarked On Serious Small Scale Horticulture Farming In Various Crops Like Cabbages, Tomatoes Etc.

Completed
743

KIANDAI DISPENSARY LAUNCH AND ISSUANCE OF PIPES AND ACCESSORIES

Feb 18, 2025 Feb 18, 2025

100%

Kiandai Dispensary Was Launched And Residents Were Very Happy

Completed
744

Kianyaga Childrens Home

Nov 26, 2024 Dec 04, 2024

100%

Completed
745

Kianyaga Childrens Home

Nov 26, 2024 Dec 04, 2024

100%

Completed
746

Kianyaga Childrens Home

Oct 14, 2024 Oct 21, 2024

100%

Completed
747

Kianyaga Childrens Home

Jul 01, 2024 Jul 08, 2024

100%

Completed
748

Kianyaga Childrens Home

May 28, 2024 Jun 03, 2024

100%

Completed
749

Kianyaga Childrens Home

Sep 02, 2024 Sep 09, 2024

100%

Completed
750

Kianyaga Childrens Home

Jul 29, 2024 Aug 05, 2024

100%

Completed
751

Kianyaga Childrens Home

Jan 08, 2025 Jan 14, 2025

100%

Completed
752

Kianyaga Childrens Home

Nov 11, 2024 Nov 19, 2024

100%

Completed
753

Kianyaga Childrens Home

Jan 21, 2025 Jan 28, 2025

100%

Completed
754

Kianyaga Childrens Home

Sep 16, 2024 Sep 23, 2024

100%

Completed
755

Kianyaga Childrens Home

Aug 19, 2024 Aug 27, 2024

100%

Completed
756

Kianyaga Childrens Home

Jul 15, 2024 Jul 22, 2024

100%

Completed
757

Kianyaga Childrens Home

Feb 24, 2025 Mar 04, 2025

100%

Completed
758

Kianyaga Childrens Home

Oct 07, 2024 Oct 14, 2024

100%

Completed
759

Kianyaga Childrens Home Food And Rations

Jun 10, 2024 Jun 17, 2024

100%

Completed
760

Kianyaga Law Court

Aug 05, 2024 Oct 04, 2024

%

Overdue
761

Kianyaga Stadium

Sep 30, 2024 Oct 07, 2024

100%

Completed
762

KIBINGO BORE HOLE VISIT

Jan 06, 2025 Jan 06, 2025

100%

The Contractor Pledged To Repair And Address All Forms Of Damages Incurred.

Completed
763

Kibirigwi FCS Elections

Aug 22, 2024 Aug 22, 2024

%

Completed
764

KIBIRIGWIFCS OFFICIAL VISIT

Jul 26, 2024 Jul 26, 2024

0%

Completed
765

KICOWASCO AGM

Feb 21, 2025 Feb 21, 2025

100%

The AGM Meeting With The Share Holders Of KICOWASCO Took Place At The Beckam Hotel. All Went As Planned.

Completed
766

Kicowasco Board Committee Meeting

Jul 18, 2024 Jul 19, 2024

100%

Completed
767

KICOWASCO BOARD EVALUATION

Oct 11, 2024 Oct 12, 2024

100%

Completed
768

KICOWASCO Board Finance Committee Meeting

Jul 11, 2024 Jul 12, 2024

100%

Completed
769

KICOWASCO Board Meeting

Sep 30, 2024 Sep 30, 2024

100%

Completed
770

KICOWASCO BOARD MEETING

Jul 24, 2024 Jul 24, 2024

100%

The Full Board Meeting Took Place With Several Resolutions Passed For Efficient And Effective Operations Of The Company

Completed
771

Kicowasco BODs Meeting

Jun 19, 2024 Jun 20, 2024

100%

Completed
772

Kicowasco BODs Meeting

Jul 24, 2024 Jul 25, 2024

100%

Completed
773

Kicowasco BODs Meeting

Jul 11, 2024 Aug 11, 2024

100%

Completed
774

Kicowasco BODs Meeting

Dec 02, 2024 Dec 03, 2024

100%

Completed
775

Kicowasco BODs Meeting

Dec 13, 2024 Dec 16, 2024

100%

Completed
776

Kicowasco BODs Meeting

Aug 05, 2024 Aug 06, 2024

100%

Completed
777

KICOWASCO DISTRIBUTION MANAGER INTERVIEWS

Aug 16, 2024 Aug 16, 2024

100%

Interviews Were Done And A Suitable Candidate Identified

Completed
778

KICOWASCO EVALUATION MEETING

Oct 11, 2024 Oct 11, 2024

100%

The Board Of Directors Were Evaluated And Further Put To Performance Based On There Role As Directors Of The Company.

Completed
779

KICOWASCO Finance And HR Committee

Aug 09, 2024 Aug 10, 2024

100%

Completed
780

KICOWASCO FULL BOARD MEEETING

Nov 08, 2024 Nov 08, 2024

100%

Attended The Full Board Meeting Where Critical Decisions Necessitating Performance Of The Company Were Made.

Completed
781

KICOWASCO FULL BOARD MEEETING

Jan 28, 2025 Nov 30, -0001

100%

The Board Meeting Took Place As Planned And All The Agendas Were Deliberated On.

Completed
782

KICOWASCO MD AND TECHNICAL MANAGER INTERVIEW

Aug 05, 2024 Aug 05, 2024

100%

The Interviews Went On As Scheduled And For Each Position A Suitable Candidate Was Gotten.

Completed
783

KIcowasco Meeting

Jun 24, 2024 Jun 25, 2024

100%

Completed
784

KICOWASCO Meeting

Oct 08, 2024 Oct 09, 2024

100%

Completed
785

KICOWASCO Meeting

Aug 01, 2024 Aug 02, 2024

100%

Completed
786

KICOWASCO MEETING

Sep 09, 2024 Sep 10, 2024

100%

Completed
787

KICOWASCO Meeting

Oct 30, 2024 Oct 30, 2024

100%

Completed
788

KICOWASCO MEETING

Nov 04, 2024 Nov 05, 2024

100%

Completed
789

KICOWASCO MEETING

Sep 10, 2024 Sep 11, 2024

100%

Completed
790

KICOWASCO Meeting

Jul 09, 2024 Jul 10, 2024

100%

Completed
791

KICOWASCO Meeting

Aug 12, 2024 Aug 13, 2024

100%

Completed
792

KICOWASCO MEETING

Sep 12, 2024 Sep 13, 2024

100%

Completed
793

KICOWASCO Meeting On Revenue

Jun 25, 2024 Jun 26, 2024

100%

Completed
794

KICOWASCO MEETING WITH THE BOARD CHAIR ON THE MANAGEMENT ISSUES

Jun 12, 2024 Jun 12, 2024

100%

Several Issues Were Raised Up To And Including Planning Advertisements To Fill The Vacant Positions

Completed
795

KICOWASCO SPECIAL BOARD MEETING

Sep 30, 2024 Sep 30, 2024

100%

Members Were Taken Through The Financial Report, Gave Their Input And Agreed In Principle

Completed
796

KICOWASCO Staff Meeting

Oct 18, 2024 Oct 19, 2024

100%

Completed
797

KICOWASCO Staff Union Meeting

Jul 26, 2024 Jul 26, 2024

100%

Completed
798

KICOWASCO TEAM ON RE ALIGNMENT

Oct 17, 2024 Oct 17, 2024

100%

The Meeting Noted That The Exercise On Re Alignment Of Workers Was Positively Taken As It Had Over 95% Acceptance.

Completed
799

KICOWASCO TECHNICAL COMMITTEE

Jul 10, 2024 Jul 10, 2024

100%

We Held The Meeting And Were Briefed On The Technical Progress Issues Of The Company Which We Felt Needed To Be Detailed As In The Figures And Other Critical Details.It Was Resolved That A More Detailed And Elaborate Report Be Prepared And Furnished To The Committee On A Date To Be Communicated.

Completed
800

KICOWASCO TECHNICAL MEETING

Jan 15, 2025 Jan 15, 2025

100%

Board Members Of The Technical Committee Were Taken Through Progress And Pending Issues That Require Urgent Attention Thus Requiring Their Support During The Full Board Meeting.

Completed
801

Kimbimbi ESP Market

May 15, 2024 May 24, 2024

20%

Overdue
802

Kimbimbi ESP Market

May 15, 2024 May 15, 2024

0%

Completed
803

Kimbimbi Hospital Progress Site Meeting

May 08, 2024 May 08, 2024

%

Overdue
804

Kirima Dairy Meeting

May 21, 2024 May 21, 2024

100%

Completed
805

Kirinyaga Alcoholic Drinks Control Licensing Regulations 2024

Apr 29, 2024 May 03, 2024

%

Completed
806

Kirinyaga Central And West Routine Check Up

Jan 22, 2025 Jan 22, 2025

100%

The Cleaning Attendants Were Well On There Work And The Cleaning Status Was Good

Completed
807

Kirinyaga Central Community Health Promoters Data Review Meetings

May 29, 2024 May 29, 2024

100%

Completed
808

Kirinyaga County Children Policy Meeting

Feb 25, 2025 Mar 04, 2025

100%

Completed
809

Kirinyaga County Childrens Policy Formulation

Nov 05, 2024 Nov 12, 2024

100%

Completed
810

Kirinyaga County Cooperative Agreement Project- CDC Monthly Recurring Meeting

Sep 12, 2024 Sep 12, 2024

100%

Completed
811

Kirinyaga County FIF Board Meeting

Mar 03, 2025 Mar 03, 2025

100%

Completed
812

Kirinyaga County Nutrition Action Plan Development- Multisectoral Sensitization Workshop

Nov 19, 2024 Nov 19, 2024

100%

Completed
813

Kirinyaga County Revenue System Training

Jul 15, 2024 Nov 30, -0001

100%

Completed
814

Kirinyaga North Primary Care Network Inreach To Thiba Health Centre

May 28, 2024 May 28, 2024

100%

Completed
815

Kirinyaga South Primary Care Network Inreach To Gathigiriri Health Centre

May 28, 2024 May 28, 2024

100%

Completed
816

Kirinyaga Team Sharing Best-Practice At Regional Space.

May 22, 2024 May 22, 2024

100%

It Was Well Done 

6 Offiers Who Are Experts In TB/HIV Did The Activity Successfully.

Completed
817

Kiripay Liqour Outlets Approvals

Jan 14, 2025 Jan 21, 2025

100%

Completed
818

KISP 2

Jul 17, 2024 Jul 31, 2024

70%

Overdue
819

KISP 2 PROJECT

Sep 23, 2024 Sep 30, 2024

%

Overdue
820

Kiswahili Cultural Day Report

Jul 08, 2024 Jul 15, 2024

100%

Completed
821

KUSP II CPCT

May 14, 2024 May 14, 2024

100%

Completed
822

Kutus Market,Industrial Park,Kibirigwi Market

Aug 23, 2024 Aug 23, 2024

%

Completed
823

KWASH Conference

Sep 03, 2024 Sep 06, 2024

100%

Completed
824

KWASH Meeting

Oct 02, 2024 Oct 02, 2024

100%

Completed
825

KWASH Meeting

Oct 07, 2024 Oct 07, 2024

100%

Completed
826

KWASH Meeting

Sep 02, 2024 Sep 03, 2024

100%

Completed
827

KWASH Meeting

Sep 03, 2024 Sep 04, 2024

100%

Completed
828

KWASH Meeting

Sep 09, 2024 Sep 10, 2024

100%

Completed
829

Kwash Meeting At 11am

Dec 03, 2024 Dec 04, 2024

100%

Completed
830

Kwash Meeting At 8am

Dec 11, 2024 Nov 15, 2024

100%

Completed
831

Kwash Meeting At 8am

Jul 09, 2024 Jul 10, 2024

100%

Completed
832

Kwash Meeting At 8am

Aug 08, 2024 Aug 09, 2024

100%

Completed
833

Kwash Program

Jul 17, 2024 Jul 18, 2024

100%

Completed
834

KWASH Virtual Meeting With Secretariat

May 28, 2024 May 29, 2024

100%

Completed
835

Laboratory Quality Management Systems Complementary Training

Sep 02, 2024 Sep 06, 2024

100%

Completed
836

Labour Day Holiday - Tree Planting

May 01, 2024 May 01, 2024

100%

Completed
837

Land Identification

May 08, 2024 May 08, 2024

100%

Completed
838

Launch Of PARTIPATORY FOREST MANAGEMENT PLANS

Jul 31, 2024 Jul 31, 2024

100%

The Meeting Took Place And All The Five Participatory Management Plans Were Signed And Requests As To Use The Forest On PERIS And Terraces Was Granted.

Completed
839

Launch Of Point Of Care Ultrasound Guidelines

Sep 13, 2024 Sep 13, 2024

100%

Completed
840

Launching Of The Agripreneur Model

May 29, 2024 May 29, 2024

100%

Completed
841

Licensing Of Late/new Applicants.

May 07, 2024 Jun 30, 2024

100%

Completed
842

Liqour Management Issues

Jun 24, 2024 Jul 01, 2024

100%

Completed
843

Liqour Outlets Billings

Feb 04, 2025 Feb 11, 2025

100%

Completed
844

Liqour Outlets Inspection Exercise

Dec 04, 2024 Dec 11, 2024

100%

Completed
845

Liqour Outlets Monitoring

Jul 01, 2024 Jul 08, 2024

100%

Completed
846

Liqour Outlets Monitoring

Jun 18, 2024 Jun 25, 2024

100%

Completed
847

LVCT Dhibiti And Wezesha-supported Staff Appraisal;

Aug 22, 2024 Aug 22, 2024

100%

Completed
848

LVCT Dhibiti-supported Staff Appraisal – Kirinyaga Central;

Aug 19, 2024 Aug 19, 2024

100%

Completed
849

LVCT Dhibiti-supported Staff Appraisal – Kirinyaga East

Aug 21, 2024 Aug 21, 2024

100%

Completed
850

LVCT Dhibiti-supported Staff Appraisal – Mwea West

Aug 20, 2024 Aug 20, 2024

100%

Completed
851

Machakos G7 Governors CAUCUS

Aug 15, 2024 Aug 15, 0224

%

Completed
852

MADARAKA DAY CELEBRATIONS

Jun 01, 2024 Jun 01, 2024

100%

Completed
853

Madaraka Day Preparition

May 29, 2024 May 30, 2024

100%

Completed
854

Malaria Case Based Surveillance System Conceptualization Workshop

Nov 19, 2024 Nov 21, 2024

100%

Completed
855

Malaria Case Management Blended Training For Health Care Workers

Nov 25, 2024 Nov 29, 2024

100%

Completed
856

Malaria Case Management Guidelines Review Workshop

Mar 03, 2025 Mar 07, 2025

100%

Completed
857

Malaria Case Management Support Supervision

Nov 18, 2024 Nov 22, 2024

100%

Completed
858

Malaria Commodities Data Review Meeting In Nakuru With The County Pharmacist, County Records Officer, County Medical Lab Officer And County Malaria Coordinator.

May 13, 2024 May 14, 2024

100%

Completed
859

Malaria Commodities Quarterly Review Meeting

Dec 09, 2024 Dec 10, 2024

100%

Completed
860

Malaria Data Quality Assessments

Nov 13, 2024 Nov 13, 2024

100%

Completed
861

Malaria Elimination Support Supervision At Select Health Facilities:

Jan 20, 2025 Jan 22, 2025

100%

Completed
862

Malaria Elimination Support Supervision – 28-31 May- Malaria Coordinator

May 28, 2024 May 28, 2024

100%

Completed
863

Malaria Elimination Tools Dissemination And Support Supervision/Mentorship To Facilities

Mar 17, 2025 Mar 20, 2025

100%

Completed
864

Malaria Sensitization Meeting

Apr 24, 2024 Apr 24, 2024

100%

Completed
865

Malezi Bora Phase 2 Planning Meeting

Oct 03, 2024 Oct 03, 2024

100%

Completed
866

Management Advisory Committee Meeting

Jun 12, 2024 Jun 12, 2024

100%

Done.

Completed
867

Manufacturers Inspection

Dec 16, 2024 Dec 23, 2024

100%

Completed
868

Market Visit; Cooperatives Meeting

Jul 02, 2024 Jul 02, 2024

%

Completed
869

Market; Cooperatives

Sep 30, 2024 Sep 30, 2024

%

Completed
870

Markets

Aug 19, 2024 Aug 19, 2024

%

Completed
871

Markets

Sep 18, 2024 Sep 18, 0224

%

Completed
872

Markets

Sep 20, 2024 Sep 20, 2024

%

Completed
873

Markets

Nov 14, 2024 Nov 14, 2024

%

Completed
874

MARKETS

Jan 10, 2025 Jan 10, 2025

%

Completed
875

Markets

Oct 14, 2024 Oct 14, 2024

%

Completed
876

Markets

Jan 16, 2025 Jan 16, 2025

%

Completed
877

Markets

Oct 16, 2024 Oct 16, 2024

%

Completed
878

MARKETS

Jul 09, 2024 Jul 09, 2024

%

Completed
879

Markets

Oct 30, 2024 Oct 30, 2024

%

Completed
880

MARKETS

Nov 05, 2024 Nov 05, 2024

%

Completed
881

Markets

Jul 12, 2024 Jul 12, 2024

%

Completed
882

Markets Field Day

Oct 04, 2024 Oct 04, 2024

%

Completed
883

Markets Survey

Aug 07, 2024 Aug 07, 2024

%

Completed
884

Markets; Weights And Measures

Nov 30, -0001 May 22, 2024

%

Completed
885

Markets;Office Work

Sep 09, 2024 Sep 09, 2024

%

Completed
886

Marking Of Back Lanes

Aug 05, 2024 Aug 09, 2024

%

Overdue
887

Marking Of Public Access Road At Makutano

May 08, 2024 Sep 08, 2024

40%

Overdue
888

Marura B Culvert Repair In Kangai Ward

May 14, 2024 May 14, 2024

%

Completed
889

Mashujaa Celebrations At Kwale County

Oct 20, 2024 Oct 20, 2024

100%

Completed
890

Media Coverage Of Veterinary Diagnostic Centre At Kerugoya

Sep 03, 2024 Sep 03, 2024

100%

Completed
891

Media Coverage Of Veterinary Diagnostic Laboratory Centre At Kerugoya

Sep 03, 2024 Sep 03, 2024

100%

Completed
892

Meet County Environment Attendant Supervisors

Jun 14, 2024 Jun 14, 2024

100%

Done.

Completed
893

Meeting With CECM Water

Jun 28, 2024 Jun 29, 2024

100%

Completed
894

MEETING ALL BURSARY SECRETARIES IN PREPARATION FOR AUDIT.

Aug 30, 2024 Aug 30, 2024

100%

Completed
895

MEETING AT BEKAM

Jul 17, 2024 Jul 17, 2024

100%

Completed
896

MEETING AT COG FOR CECM INCHARGE OF INDUSTRY

Jul 10, 2024 Jul 10, 2024

0%

Completed
897

Meeting At County Assembly

Sep 18, 2024 Sep 19, 2024

100%

Completed
898

Meeting At DG Boardroom With SRC

Oct 31, 2024 Oct 31, 2024

100%

Completed
899

Meeting At Kaitheri Apparel

Aug 09, 2024 Aug 09, 2024

100%

Completed
900

Meeting At Kaitheri Polytechnic To Discuss Openning For Third Term.

May 13, 2024 May 13, 2024

100%

Completed
901

MEETING AT KIRINYAGA UNIVERSITY

Jun 04, 2024 Jun 04, 2024

100%

Completed
902

MEETING AT NARIG BOARDROOM

May 27, 2024 May 27, 2024

100%

Completed
903

MEETING AT NARIGP BOARDROOM

Jun 10, 2024 Jun 10, 2024

100%

Completed
904

Meeting At Rukanga

Jun 14, 2024 Jun 14, 2024

100%

Completed
905

Meeting At Rukanga Water

Jul 03, 2024 Jul 04, 2024

100%

Completed
906

Meeting At Rukanga Water

Jul 08, 2024 Jul 09, 2024

100%

Completed
907

MEETING AT THE SAGANA INDUSTRIAL PARK IN PREPARATION FOR THE PRESIDENTIAL SITE VISIT

Aug 08, 2024 Aug 08, 2024

100%

We Were Briefed On The Actual Sites The President Will Visit As Well As A Brief On Our Roles Before And During The Presidents Visit

Completed
908

MEETING IN NYERI COUNTY

Jun 28, 2024 Jun 28, 2024

100%

Completed
909

Meeting Of 22nd Inter-governmental Consultative Forum (IGF)

Dec 09, 2024 Dec 10, 2024

100%

Completed
910

Meeting On BPaLM Roll Out -Hylise Hotel In Naivasha.

May 06, 2024 May 07, 2024

100%

Completed
911

Meeting On Building Code Regulations Following The Collapse Of The Building At Karia Last Week – At NARIGP Boardroom. CPHO Attending.

May 06, 2024 May 06, 2024

100%

Completed
912

Meeting On County GBV/MENTAL Health Project From 8.30 A.m To 10.00 A.m

May 20, 2024 May 20, 2024

100%

Completed
913

MEETING ON MORTUARY COMPLAIN AT THE COUNTY COMMISSIONERS OFFICE

Nov 11, 2024 Nov 11, 2024

100%

NECC  Officers From Nairobi Came And Formally Raised The Complaint Of The Members Of The Public As Raised To Them Where The NEMA Director From The County Explained That There Was No Disclosure Of The Project To Be Done During The Public Participation.

Completed
914

MEETING ON REALIGHNMENT OF GICHUGU WATER INTO A WATER SERVICE PROVIDER

Oct 28, 2024 Oct 28, 2024

100%

The Identification Of A Company Secretary For The Purposes Of Beginning The Registration Process Was Done.

Completed
915

MEETING ON REVIEW OF SENATE RESPONSE

Oct 01, 2024 Oct 01, 2024

100%

The Meeting Took Place And Various Departments Present Were Tasked With With Various Input Roles Which Were To Be Worked On For A Full Document Compilation For Onward Submission To Senate After Approval

Completed
916

MEETING ON UPDATES AND STATUS OF OUR WATER PROJECTS

Sep 02, 2024 Sep 02, 2024

100%

This Meeting Took Place And A Status Report On The Current Water Projects Was Done.

Completed
917

MEETING TANA WATER WORKS ENGINEERS

Aug 07, 2024 Aug 07, 2024

100%

The Meeting Resolved To Have Our Engineers Involved In The Process So As To Come Up With A Consolidated Document With The Input Of Our Team

Completed
918

Meeting To Deliberate Environmental Degradation Complaints From The Residents Of Riandira, Mwea West Sub-County

Nov 11, 2024 Nov 11, 2024

100%

Completed
919

Meeting To Develop Content Of Comprehensive Activities By TB Community Actors

Dec 09, 2024 Dec 10, 2024

100%

Completed
920

Meeting Water Officers

Nov 04, 2024 Nov 05, 2024

100%

Completed
921

Meeting Wirh Kicowasco And Ruwasco Water Companies

May 31, 2024 May 31, 2024

100%

Completed
922

Meeting With A Self Help Group At Mutira

Nov 14, 2024 Nov 14, 2024

100%

Completed
923

Meeting With A Women Self Help Group At Kangai

Jul 05, 2024 Jul 05, 2024

100%

Completed
924

Meeting With A Women Self Help Group At Kangai Ward

Sep 06, 2024 Sep 06, 2024

100%

Completed
925

Meeting With A Women Self Help Group At Kariti

Oct 11, 2024 Oct 11, 2024

100%

Completed
926

Meeting With A Women Self Help Group At Karumandi Ward

Nov 05, 2024 Nov 05, 2024

100%

Completed
927

Meeting With A Women Self Help Group At Ngariama

Jul 26, 2024 Jul 26, 2024

100%

Completed
928

Meeting With A Women Self Help Group At Rurii, Thiba Ward

Jul 25, 2024 Jul 25, 2024

100%

Completed
929

Meeting With A Women Self Help Group At Thiguku Near Baricho

Jul 09, 2024 Jul 09, 2024

100%

Completed
930

Meeting With A Women Self Help Group In Kerugoya

Nov 22, 2024 Nov 22, 2024

100%

Completed
931

MEETING WITH ADB AND TANA WATER WORKS

Nov 07, 2024 Nov 07, 2024

100%

The Meeting Went On And Briefs Were Done On The Status Of The Projects .

Completed
932

Meeting With Afya Yetu Initiative To Plan On Sensitization Of Community Health Committees – CHMT Boardroom

Jun 12, 2024 Jun 12, 2024

100%

Completed
933

Meeting With All CECMs

Nov 30, -0001 May 27, 2024

100%

Completed
934

Meeting With Bursary Secretaries To Review Compliance With Bursary Issuance Regulations.

Jul 03, 2024 Jul 03, 2024

100%

Completed
935

Meeting With CECM Agriculture

Oct 22, 2024 Oct 23, 2024

100%

Completed
936

Meeting With CECM Agriculture

Jul 04, 2024 Jul 05, 2024

100%

Completed
937

Meeting With CECM Finance

Aug 28, 2024 Aug 29, 2024

100%

Completed
938

Meeting With CECM Finance

Oct 28, 2024 Oct 29, 2024

100%

Completed
939

Meeting With CECM Finance

Jun 10, 2024 Jun 11, 2024

100%

Completed
940

Meeting With CECM Finance And County Secretary

Aug 27, 2024 Aug 28, 2024

100%

Completed
941

Meeting With CECM Finance And County Secretary

Aug 27, 2024 Aug 28, 2024

100%

Completed
942

Meeting With CECM Finance And County Secretary

Aug 27, 2024 Nov 30, -0001

100%

Completed
943

Meeting With CECM Finance And County Secretary

Nov 11, 2024 Dec 11, 2024

100%

Completed
944

Meeting With CECM Water

Aug 22, 2024 Aug 23, 2024

100%

Completed
945

Meeting With CECM Water

Jul 25, 2024 Jul 26, 2024

100%

Completed
946

Meeting With CECM Water

Sep 02, 2024 Sep 03, 2024

100%

Completed
947

Meeting With CECM Water

Jul 04, 2024 Jul 05, 2024

100%

Completed
948

Meeting With CECM Water

Jul 10, 2024 Jul 11, 2024

100%

Completed
949

Meeting With CECM Water

Jul 15, 2024 Jul 16, 2024

100%

Completed
950

Meeting With CECM Water And Environment

Nov 20, 2024 Nov 21, 2024

100%

Completed
951

Meeting With CECM Water And Environment

Jul 30, 2024 Jul 31, 2024

100%

Completed
952

Meeting With CECM Water And Environment

Dec 03, 2024 Dec 04, 2024

100%

Completed
953

Meeting With CECM Water And Environment

Aug 19, 2024 Aug 20, 2024

100%

Completed
954

Meeting With CECM Water And KNHRC

Jul 16, 2024 Jul 17, 2024

100%

Completed
955

Meeting With CECM Water On Departmental Bliefing

Jul 01, 2024 Jul 02, 2024

100%

Completed
956

Meeting With CECM Water On Departmental Briefing

Jul 23, 2024 Jul 24, 2024

100%

Completed
957

MEETING WITH CHIEF OFFICER AND DIRECTORS

Aug 29, 2024 Aug 29, 2024

100%

Completed
958

MEETING WITH CHIEF OFFICER WATER ON KWASH UPDATES

Sep 02, 2024 Sep 02, 2024

100%

A Draft Alignment Schedule On The Requirements By The World Bank Was Done.

Completed
959

Meeting With Chief Officer, Director Youth, Director Gender, Director PWD

May 20, 2024 May 20, 2024

100%

Completed
960

Meeting With CMT (KICOWASCO)

Jul 30, 2024 Jul 31, 2024

100%

Completed
961

MEETING WITH CMT KICOWASCO

Jul 12, 2024 Jul 13, 2024

100%

Completed
962

Meeting With Company Secretary (KICOWASCO) - Mr. Gikuhi

Jul 30, 2024 Jul 31, 2024

100%

Completed
963

Meeting With County Attorney

May 22, 2024 May 23, 2024

100%

Completed
964

Meeting With County Attorney

May 23, 2024 May 24, 2024

100%

Completed
965

Meeting With County K-WASH PIU

May 21, 2024 May 22, 2024

100%

Completed
966

Meeting With County Secretary

Aug 22, 2024 Aug 23, 2024

100%

Completed
967

Meeting With County Secretary

Jul 24, 2024 Jul 25, 2024

100%

Completed
968

Meeting With County Secretary

Jul 29, 2024 Jul 30, 2024

100%

Completed
969

Meeting With County Secretary – Kutus;

Jul 16, 2024 Jul 16, 2024

100%

Completed
970

Meeting With County Solicitor General

May 24, 2024 May 24, 2024

100%

Completed
971

MEETING WITH CS AT NARIGP BOARD ROOM

Jul 24, 2024 Jul 24, 2024

100%

The Invite Turned Out To Be A Deliberation Meeting On The Correct Status Of The County Budget And Implementation Of The Projects In The Financial Year 2023/2024.

Completed
972

MEETING WITH CS WATER AND IRRIGATION AND NIA TEAM

Nov 25, 2024 Nov 25, 2024

100%

The CS Water And Irrigation Made A Courtesy Call To Her Excellency And Deliberations On How Best To Deal With The Snails And Rat Menace Were Done. Further I Was Tasked To Accompany The CS Which I Did.

Completed
973

MEETING WITH DEPARTMENTS DIRECTORS ON PERFOMANCE CONTRACTING

Jul 30, 2024 Jul 30, 2024

100%

The Meeting Was On How Best To Actualize The Departmental Contract With View To Each Players Involvement On Its Implementation. There Was A Major Focus On Reporting Especially The Relationship Between The Matrix And Notes.

Completed
974

MEETING WITH DG

Jul 02, 2024 Jul 02, 2024

100%

This Was A Meeting On Issues Of How Best To Improve On Performance And Reporting.

Completed
975

Meeting With Directorate Of Water Team

Nov 28, 2024 Nov 29, 2024

100%

Completed
976

MEETING WITH E WATER ON DEVELOPMENT PROGRESS

Jan 13, 2025 Jan 13, 2025

100%

The Team From E Water Paid A Courtesy Call As A Follow-up Meeting On Issues Pertaining To The SPA Which Required Some Level Of Agreement Before Any Amendments Or Implementations Were Done.

Completed
977

Meeting With E Water Services Ltd

Jul 08, 2024 Jul 08, 2024

100%

SPA Agreement Signed Between The County Government And E Water Services As Agreed And Guided

Completed
978

Meeting With Ewater

Jul 17, 2024 Jul 18, 2024

100%

Completed
979

Meeting With Finance Dept

Jun 11, 2024 Jun 11, 2024

100%

Done

Completed
980

Meeting With Gichugu Water

Aug 20, 2024 Aug 21, 2024

100%

Completed
981

MEETING WITH H.E DEPUTY GOVERNOR

Jul 16, 2024 Jul 16, 2024

100%

Completed
982

MEETING WITH HE AT COG

Aug 23, 2024 Aug 23, 2024

100%

Completed
983

Meeting With HE On G7 Visit

Sep 04, 2024 Sep 04, 2024

100%

Completed
984

Meeting With Health X To Explore Collaboration Areas

Sep 10, 2024 Sep 09, 2024

100%

Completed
985

Meeting With His Excellency TheDeputy Governor

Jul 01, 2024 Jul 02, 2024

100%

Completed
986

Meeting With Hr

Jul 23, 2024 Jul 24, 2024

100%

Completed
987

Meeting With JICA SAMACH To Plan For The Joint Coordinating Committee Meeting Scheduled For Wednesday 19 June 2024 In Nairobi

Jun 11, 2024 Jun 11, 2024

100%

Completed
988

Meeting With JICA-SAMACH On Progress On The Online Annual Work Plan For FY 2024-2025

May 20, 2024 May 20, 2024

100%

Completed
989

Meeting With JICA-SAMACH Team To Deliberate On 2025 Activities;

Jan 16, 2025 Jan 16, 2025

100%

Completed
990

Meeting With JICA-SAMACH Team To Review Project Progress And Plan For Q2

Sep 19, 2024 Sep 19, 2024

100%

Completed
991

MEETING WITH KABARE WATER COMMITTEE

Jul 16, 2024 Jul 16, 2024

100%

We Met With The Officials Of Kabare Water And Agreed To Have Them Follow The Due Process Of Law And Thus They Unanimously Agreed That They Had Truly Overstayed In The Office And Thus The Need To Have An Election Conducted For New Committee Members To Be Elected

Completed
992

Meeting With Kabare Water Project Officials

Jul 16, 2024 Jul 17, 2024

100%

Completed
993

MEETING WITH KAGIO MARKET TRADERS JOINTLY WITH MY COLLEAGUE IN TRADE

Aug 15, 2024 Aug 15, 2024

100%

This Meeting Happened And The Issues They Raised Were Addressed And A Commitment Given To The Proposed Improvements.

Completed
994

MEETING WITH KANGAI MCA AND KICOWASCO

Oct 09, 2024 Oct 09, 2024

100%

A Commitment Was Made By The Technical Implementation Team Of KICOWASCO PLC That The Works Would Begin In Two Days And Flow To Completion.

Completed
995

Meeting With Kenya Medical Practitioners, Pharmacists And Dentist Union – Central Branch

Aug 29, 2024 Aug 29, 2024

100%

Completed
996

Meeting With Kianduro Water Project Officials

Jul 16, 2024 Jul 17, 2024

100%

Completed
997

Meeting With Kicowasco And Ruwasco Water Companies

Jun 13, 2024 Jun 14, 2024

100%

Completed
998

Meeting With KICOWASCO HRM Manger

Jul 15, 2024 Jul 16, 2024

100%

Completed
999

Meeting With Kicowasco Management

Jun 18, 2024 Jun 19, 2024

100%

Completed
1000

Meeting With Kicowasco Management On Revenue Status And Way Forward

May 06, 2024 May 06, 2024

100%

Completed
1001

Meeting With KICOWASCO Management Team

Jul 02, 2024 Jul 03, 2024

100%

Completed
1002

Meeting With KICOWASCO Team

Aug 29, 2024 Aug 30, 2024

100%

Completed
1003

Meeting With KICOWASCO Team

Nov 26, 2024 Nov 27, 2024

100%

Completed
1004

MEETING WITH KICOWASCO TEAM ON CPF ISSUES

Jun 10, 2024 Jun 10, 2024

100%

 A Resolve Was Made To Have A Payment Plan And A Waiver On Penalties As Long As The Company Consistently Keeps A Regular Remittance Order

Completed
1005

MEETING WITH Kicowascos Company Secretary

Jul 30, 2024 Jul 30, 2024

100%

The Meeting Successfully Addressed The Issue Of Organizing Water Projects In Kirinyaga East Into A Regulated Water Service Provider.

Completed
1006

Meeting With Kirinyaga Central Water Association

Aug 12, 2024 Aug 13, 2024

100%

Completed
1007

Meeting With Kirinyaga Coffee Mills

Jul 24, 2024 Jul 24, 2024

100%

Completed
1008

Meeting With KMET

May 20, 2024 May 20, 2024

100%

Completed
1009

Meeting With MCA Representing PWDs With HCWs Trained In Sign Language And Deliberate On Other PWD Matters.

Apr 29, 2024 Apr 29, 2024

100%

Completed
1010

Meeting With Medtronic Labs To Deliberate On Digitization Of Primary Health Care Networks – CDH, PHC Coordinator, County Community Strategy Focal Person.

May 14, 2024 May 14, 2024

100%

Completed
1011

Meeting With Murinduko MCA

May 21, 2024 May 22, 2024

100%

Completed
1012

Meeting With MURIUKI NGARI On CARBON CREDITS

Jun 14, 2024 Jun 14, 2024

100%

We Resolved That Muriuki Will Do An Elaborate Concept On The Whole Value Chain Issue About Carbon Credits Even Before We Visit The KENYA CIVIL AVIATION AUTHORITY On The CORSEA ISO Standards To Be Met As Possible Investors Commit To Trading  On Our Carbon

Completed
1013

MEETING WITH MUTITHI SELF HELP GROUP

Jun 20, 2024 Jun 20, 2024

100%

Completed
1014

Meeting With NIA Scheme Manager

Jul 10, 2024 Jul 11, 2024

100%

Completed
1015

Meeting With Officials Of Parents Of Children With Cerebral Palsy

Nov 30, -0001 Nov 30, -0001

100%

Completed
1016

Meeting With Officials Of Parents Of Children With Cerebral Palsy

May 27, 2024 May 27, 2024

100%

Completed
1017

MEETING WITH PROFFESOR MARION ON CLIMATE CHANGE ISSUES(KNCHR)

Jul 16, 2024 Jul 16, 2024

100%

We Had A Very Successful Meeting With The Team From Kenya National Human Rights Commission (KNCHR) Sent By The Commission To Assess How We Are Dealing With The Issues Of Climate Change To Have A Resilient Society.

Completed
1018

MEETING WITH PS PRISON

Aug 20, 2024 Aug 20, 2024

100%

The Tour To Our Prisons Was Very Successful And Proposals For Areas Of Partnerships Was Done

Completed
1019

Meeting With Real Planner Consultant

May 20, 2024 May 20, 2024

%

Overdue
1020

MEETING WITH RIN FOREST ALLIANCE AT EMBU

Sep 13, 2024 Sep 13, 2024

%

Overdue
1021

Meeting With RUKANGA General Manager And KICOWASCO Managing Director

Nov 05, 2024 Nov 06, 2024

100%



Completed
1022

Meeting With Ruwasco Management

Nov 22, 2024 Nov 25, 2024

100%

Completed
1023

MEETING WITH RUWASCO TECHNICAL COMMITTEE

Jul 29, 2024 Jul 29, 2024

100%

The Meeting Addressed Among Other Issues The Safi San Toilets Tusle As Well As How Soon The Construction Of The DTF Project Begins

Completed
1024

Meeting With Safaricom

Jun 10, 2024 Jun 10, 2024

100%

Done

Completed
1025

MEETING WITH SECTION HEADS IN THE OFFICE

Jul 15, 2024 Jul 15, 2024

100%

Completed
1026

Meeting With Stakeholders On Community Health Strategy To Discuss Progress.

May 09, 2024 May 09, 2024

100%

Completed
1027

Meeting With Tana At Ahiti Ndomba

Aug 06, 2024 Aug 07, 2024

100%

Completed
1028

Meeting With Tana, KICOWASCO And Sewerage Contractor

Aug 02, 2024 Aug 03, 2024

100%

Completed
1029

Meeting With The Finance Department To Discuss Pending Bills

Jul 23, 2024 Jul 23, 2024

100%

Completed
1030

MEETING WITH THE KIRINYAGA ASSOCIATION OF MANUFACTURES

Jul 19, 2024 Jul 19, 2024

100%

Completed
1031

Meeting With The Three Gender Directors In The Office

Jul 04, 2024 Jul 04, 2024

100%

Completed
1032

MEETING WITH TUNGSTEN TEAM AND THE CZECH REPUBLIC INVESTORS

Jan 29, 2025 Jan 29, 2025

100%

The Meeting Was Postponed To A Later Date

Completed
1033

Meeting With Water Director

Jun 03, 2024 Jun 04, 2024

100%

Completed
1034

Meeting With Water Officers

May 20, 2024 May 21, 2024

100%

Completed
1035

Meeting With Water Police Unit

May 28, 2024 May 29, 2024

100%

Completed
1036

Meeting With World Bank

Dec 09, 2024 Dec 10, 2024

100%

Completed
1037

MEETING WITH WORLD BANK AND MINISTRY OF WATER OFFICIALS ON K WASH PROGRAMME

Dec 09, 2024 Dec 09, 2024

100%

The Team Held A Meeting With The County PIU Team On The Level Of Progress And Project Assessment With View To Identifying Areas Of Improvement Before We Are Subjected To The IVA.

Completed
1038

MEETING- AQUACULTURE BUSINESS DEVELOPMENT PROGRAMME (ABDP)

Jun 24, 2024 Jun 24, 2024

0%

Completed
1039

Mental Health Forum C/O HealthX And Enterprising World Kenya

Dec 06, 2024 Dec 06, 2024

100%

Completed
1040

Mental Health Workshop For Health Care Workers

Sep 02, 2024 Sep 06, 2024

100%

Completed
1041

Mentorship Of Nakuru CHMT On Use Of Online AWP Tools Developed Under JICA-SAMACH Project. Venue-Nakuru; Officer Involved- Sub-County HRIO Kirinyaga West

Jun 04, 2024 Jun 04, 2024

100%

Completed
1042

Mentorship Visit To Taita Taveta County On Integrated Community Case Management; Officer Involved; County Clinical Officer

Jun 10, 2024 Jun 14, 2024

100%

Completed
1043

Mid Term Review Workshop

Jun 03, 2024 Jun 07, 2024

0%

The County Is Expected To Make Presentations To The Implementation Unit On The Progress Made From Funds Received So Far

Overdue
1044

Mining Progress Review Meeting

Jun 14, 2024 Jun 14, 2024

100%

The Gazettement Of County Artisanal Miners Committee Is Done. Cooperatives For Artisanal Miners Still Underway

Completed
1045

MOBILIZATION FOR TREE SEEDLINGS FROM THE COUNTY FORESTER

Nov 27, 2024 Nov 27, 2024

100%

We Met As A Department To Deliberate On Issues Of Tree Planting And Came Up With A Work Plan.

Completed
1046

MOH Disease Surveillance Unit Support Supervision In Kirinyaga County

Jul 08, 2024 Jul 12, 2024

100%

Completed
1047

Monitor Assessment Of Dairy Farmers Supported Through Fodder Production By NARIGP

Jun 03, 2024 Jun 14, 2024

100%

Completed
1048

Monitor Assessment Of Dairy Goat Farmers Supported By NARIGP

Jun 03, 2024 Jun 14, 2024

100%

Completed
1049

Monitor Assessment Of Feed Mixtures Supported By NARIGP

Jun 03, 2024 Jun 14, 2024

100%

Completed
1050

Monitor Assessment Of Functional Incubators But Not Functional

Jun 03, 2024 Jun 14, 2024

100%

Completed
1051

Monitor Assessment Of Of Coffee Pulping Stations In The County

Jun 03, 2024 Jun 14, 2024

100%

Completed
1052

Monitor Assessment Of Poultry Cage Farming Groups Supported By NARIGP

Jun 03, 2024 Jun 14, 2024

100%

Completed
1053

Monitor On Spot Check On Dam And Fish Pond Status In Mwea East

May 06, 2024 May 10, 2024

100%

Completed
1054

Monitor Pond Construction Mwea East

Jul 15, 2024 Jul 19, 2024

100%

Completed
1055

Monitor Repair Of Faulty Incubators

Jun 03, 2024 Jun 14, 2024

100%

Completed
1056

Monitor The Status Of All Banana Aggregation Centers

Jun 03, 2024 Jun 14, 2024

100%

Completed
1057

Monitor Training Of Agriprenuer Cohort One

Jul 17, 2024 Jul 17, 2024

100%

Completed
1058

Monitor Training Of CDDC Committee Members

Jul 17, 2024 Jul 17, 2024

100%

Completed
1059

Monitoring And Surveillance Of Suspected Outbreak Of Black Quarter Disease At Kagio

May 28, 2024 May 28, 2024

100%

Completed
1060

Monitoring Agriculture Extension For The Trai Ning Of Integrated Pest Management (IPM) On Tomato Production

Jul 22, 2024 Jul 22, 2024

100%

Completed
1061

Monitoring Agriculture Extension For The Training Of Rice Farmers Crop Protection Practices In Mwea And Distribution Of Crop Protection Equipment On Sub-counties And Ward Levels.

Jul 29, 2024 Aug 02, 2024

100%

Completed
1062

Monitoring And Evaluation Exercise At Kaitheri Polytechnic.

May 20, 2024 May 20, 2024

100%

Completed
1063

Monitoring And Evaluation Exercise-Kaitheri Polytechnic

Jul 11, 2024 Jul 11, 2024

100%

Completed
1064

Monitoring And Inspection Of Slaughter Slabs Kirinyaga Central

Nov 25, 2024 Nov 29, 2024

100%

Completed
1065

Monitoring And Supervision Of Garbage Collection In Mwea

Jul 02, 2024 Jul 02, 2024

%

Overdue
1066

Monitoring And Supervision Of Garbage Collection In Mwea

Jul 03, 2024 Jul 03, 2024

%

Overdue
1067

Monitoring And Supervision Of Garbage In Sagana

Jul 04, 2024 Jul 04, 2024

%

Overdue
1068

MONITORING AND SUPERVISION OF SPECIAL ECONOMIC ZONE BUSH CLEARING

Aug 05, 2024 Aug 05, 2024

100%

The Clearing Of Bushes Along The Road Started Off Nicely Though A Bit Late Due To Attendance To Normal Cleaning Duties First. The Team Did Not Finish And Thus Will Continue.

Completed
1069

Monitoring And Surveillance Of Quelea Qualea Birds At Mwea East & West Sub-counties

Oct 28, 2024 Nov 01, 2024

100%

Completed
1070

Monitoring And Surveillance Of Quelea Quelea Bird In Mwea Rice Fields

Nov 04, 2024 Nov 29, 2024

100%

Completed
1071

Monitoring And Surveillance Of Quelea Quelea Birds In Mwea To Avoid Destruction Of Rice Field

Nov 30, -0001 Nov 30, -0001

100%

Completed
1072

Monitoring Aquaculture Extension Services On TIMPs Mwea West.

Nov 11, 2024 Nov 15, 2024

100%

Completed
1073

Monitoring Assessement Of Seedlings Nurseries Supported By NARIGP

Nov 30, -0001 Jun 14, 2024

100%

Completed
1074

Monitoring Assessment Of Greenhouses Supported By NARIGP

Jun 03, 2024 Jun 14, 2024

100%

Completed
1075

Monitoring Construction And Liners Installation And Sensitization On Other Innovative Fish Production Technologies For Increased Fish Production

Oct 15, 2024 Oct 18, 2024

100%

Completed
1076

Monitoring Extension Services On Aquaculture TIMPS In Kirinyaga West

Aug 05, 2024 Aug 09, 2024

100%

Completed
1077

Monitoring Farmers Training On Fish Technological Management Practices

Dec 09, 2024 Dec 13, 2024

100%

Completed
1078

Monitoring Farmers Training On Technology Integrated Management Practices (TIMPs)

Dec 09, 2024 Dec 13, 2024

100%

Completed
1079

Monitoring Insurance Of Fish Feed On Farmers Input Support By Aquaculture Business Development Programme In Kirinyaga West And Kirinyaga Central

Jan 27, 2025 Jan 31, 2025

100%

Completed
1080

Monitoring Liqour Outlets Operations.

Jun 24, 2024 Jul 01, 2024

100%

Completed
1081

Monitoring Liqour Outlets Operations.

Mar 04, 2025 Mar 11, 2025

100%

Completed
1082

Monitoring Liqour Outlets Operations.

Nov 19, 2024 Nov 26, 2024

100%

Completed
1083

Monitoring Liqour Outlets Operations.

Jul 22, 2024 Jul 29, 2024

100%



Completed
1084

Monitoring Liqour Outlets Operations.

May 27, 2024 Jun 03, 2024

100%

Completed
1085

Monitoring Liqour Outlets Operations.

Nov 26, 2024 Dec 04, 2024

100%

Completed
1086

Monitoring Liqour Outlets Operations.

Oct 14, 2024 Oct 21, 2024

100%

Completed
1087

Monitoring Liqour Outlets Operations.

Aug 27, 2024 Sep 03, 2024

100%

Completed
1088

Monitoring Liqour Outlets Operations.

Sep 02, 2024 Sep 09, 2024

100%

Completed
1089

Monitoring Liqour Outlets Operations.

Oct 22, 2024 Oct 29, 2024

100%

Completed
1090

Monitoring Liqour Outlets Operations.

Jul 29, 2024 Aug 05, 2024

100%

Noted Re Emergence Of Previously Banned Manufacturers Brands And Reported The Same To The County Commissioner For Actioning.

Completed
1091

Monitoring Liqour Outlets Operations.

Oct 30, 2024 Nov 06, 2024

100%

Completed
1092

Monitoring Liqour Outlets Operations.

Aug 05, 2024 Aug 12, 2024

100%

Completed
1093

Monitoring Liqour Outlets Operations.

Sep 09, 2024 Sep 16, 2024

100%

Completed
1094

Monitoring Liqour Outlets Operations.

Sep 09, 2024 Sep 16, 2024

100%

Completed
1095

Monitoring Liqour Outlets Operations.

Nov 04, 2024 Nov 12, 2024

100%

Completed
1096

Monitoring Liqour Outlets Operations.

Nov 11, 2024 Nov 19, 2024

100%

Completed
1097

Monitoring Liqour Outlets Operations.

Jul 08, 2024 Jul 15, 2024

100%

Completed
1098

Monitoring Liqour Outlets Operations.

Jan 14, 2025 Jan 21, 2025

100%

Completed
1099

Monitoring Liqour Outlets Operations.

Jan 21, 2025 Jan 28, 2025

100%

Completed
1100

Monitoring Liqour Outlets Operations.

Sep 16, 2024 Sep 23, 2024

100%

Completed
1101

Monitoring Liqour Outlets Operations.

Jan 28, 2025 Feb 04, 2025

100%

Completed
1102

Monitoring Liqour Outlets Operations.

Jun 10, 2024 Jun 17, 2024

100%

Completed
1103

Monitoring Liqour Outlets Operations.

Aug 19, 2024 Aug 27, 2024

100%

Completed
1104

Monitoring Liqour Outlets Operations.

Feb 04, 2025 Feb 11, 2025

100%

Completed
1105

Monitoring Liqour Outlets Operations.

Jul 15, 2024 Jul 22, 2024

100%

Had A Meeting With The County Commissioner On Matters Arising With Regards To 2nd Generation Liqour.

Enforcement To Follow.

Completed
1106

Monitoring Liqour Outlets Operations.

Feb 10, 2025 Feb 18, 2025

100%

Completed
1107

Monitoring Liqour Outlets Operations.

Feb 17, 2025 Feb 25, 2025

100%

Completed
1108

Monitoring Liqour Outlets Operations.

Sep 30, 2024 Oct 07, 2024

100%

Completed
1109

Monitoring Liqour Outlets Operations.

Oct 07, 2024 Oct 14, 2024

100%

Completed
1110

Monitoring Livestock Extension In The Training Of Poultry Incubator Technology At Wamumu Mwea West

Jul 24, 2024 Jul 24, 2024

100%

Completed
1111

Monitoring Meat Inspection At The County Slaughter Slabs And Disease Surveillance In All The Sub-counties

Jan 20, 2025 Jan 24, 2025

100%

Completed
1112

Monitoring Meat Inspection At The County Slaughter Slabs.Disease Surveillance

Nov 30, -0001 Nov 30, -0001

100%

Completed
1113

Monitoring Meat Inspection On The County Slaughter Slabs And Disease Surveillance

Dec 02, 2024 Dec 13, 2024

100%

Completed
1114

Monitoring Meet Inspection Activities At Kirinyaga Central

Jul 29, 2024 Aug 02, 2024

100%

Completed
1115

Monitoring Of Community Barazas

May 23, 2024 May 24, 2024

100%

Completed
1116

Monitoring Of Community Entry Barazas For The PICD Process In The NAVCDP Project

May 23, 2024 May 24, 2024

100%

Completed
1117

Monitoring Of Disease Surveillance In Kirinyaga Central And Ndia

May 13, 2024 May 17, 2024

100%

Completed
1118

Monitoring Of Fall Army Worm Pesticides Distribution

May 14, 2024 May 17, 2024

100%

Completed
1119

Monitoring Of Fish Stocking In Rice Field Demo Plots At MIAD Mwea

Sep 02, 2024 Sep 06, 2024

100%

Completed
1120

Monitoring Of FPOs And Irrigation Cooperatives.

Oct 31, 2024 Nov 01, 2024

100%

Completed
1121

Monitoring Of Kangainseedling Propagation Unit Centre Progress

Sep 09, 2024 Sep 09, 2024

100%

Completed
1122

Monitoring Of Livestock Household Listing Conducted By Kenya Livestock Master Plan (KLMP) Across The 20 Wards

Nov 18, 2024 Nov 26, 2024

100%

Completed
1123

Monitoring Of Meat Inspection

Sep 02, 2024 Sep 06, 2024

100%

Completed
1124

Monitoring Of Meat Inspection Process At Mwea East Sub-county

May 29, 2024 May 29, 2024

100%

Completed
1125

Monitoring Of Meat Inspection Process At Mwea East Sub-county

May 29, 2024 May 29, 2024

100%

Completed
1126

Monitoring Of NARIGP/WEZESHA Success Stories

May 22, 2024 May 23, 2024

100%

Documentary Done On

1. ABDP (Fish Annual Day)

2. Poultry Incubators

3. Goats In PLWD Groups

4. Bees

5. Banana Value Chain On Driers



Completed
1127

Monitoring Of Producer Organization Dairy Training Rukingo And Kirima

May 20, 2024 May 23, 2024

100%

Completed
1128

Monitoring Of Quelea Quelea Birds

Oct 29, 2024 Oct 01, 2024

100%

Completed
1129

Monitoring Of Quelea Quelea Birds In Mwea Paddy Rice Fields

Oct 28, 2024 Nov 01, 2024

100%

Completed
1130

Monitoring Of Reported Rabies Cases Follow Up At Kianjiru And Difathas Area

Sep 09, 2024 Sep 09, 2024

100%

Completed
1131

Monitoring Of Reported Rabies Cases Follow Up At Kianjiru And Difathas Areas

Sep 09, 2024 Sep 13, 2024

100%

Completed
1132

Monitoring Of Reported Rabies Cases Follow Up At Murinduko Mwea West

Sep 18, 2024 Sep 20, 2024

100%

Completed
1133

Monitoring Of Rice , Sunflower And Sorghum Distribution

Oct 09, 2024 Oct 18, 2024

100%

Completed
1134

Monitoring Of SACCO Official Sensitization On Budget Preparation, Credit Management And Automation

Sep 03, 2024 Sep 06, 2024

100%

Completed
1135

Monitoring Of Sunflower And Sorghum Distribution Across All Wards.

Oct 07, 2024 Oct 11, 2024

100%

Completed
1136

Monitoring Of Sunflower And Sorghum Distribution

Oct 09, 2024 Oct 09, 2024

100%

Completed
1137

Monitoring Of Sunflower Distribution To Satellite Stations For Issuing To Beneficiaries From KIAGA

May 21, 2024 May 21, 2024

100%

Completed
1138

MONITORING OF THE AHITI NDOMBA BUSH CLEARING

Aug 05, 2024 Aug 05, 2024

100%

Site Cleaning And Clearing Of Bushes In Preparation For Presidential Visit Is Complete

Completed
1139

Monitoring Of The SAGs Reviews On Preparation Of Grant Proposals

May 14, 2024 May 16, 2024

100%

Completed
1140

Monitoring Of Vaccination Activities Against Foot And Mounh Disease (FMD)

Jul 15, 2024 Jul 19, 2024

100%

Completed
1141

Monitoring Of Ward Based SACCOs Performances

Oct 08, 2024 Oct 11, 2024

100%

Completed
1142

Monitoring Of Ward Primary Data Collection Through Transect Walk , Resource Maps ,Focus Development Groups (FDGs) And Key Informate Individual (KII))

May 28, 2024 May 29, 2024

100%

Completed
1143

Monitoring Of Ward Primary Data Collection Through Transect Walk, Resource Maps, FDGs & KII

May 28, 2024 May 29, 2024

100%

Completed
1144

Monitoring Ponds Construction And Liners Installation And Training Farmers On TIMPS At The Ward Level

Aug 26, 2024 Aug 30, 2024

100%

Completed
1145

Monitoring Preparation Meeting For Primary Data Collection At The Ward Level

May 27, 2024 May 27, 2024

100%

Completed
1146

Monitoring Ring Vaccination Against Foot And Mouth Disease At Makutano Mwea West

Jul 22, 2024 Jul 22, 2024

100%

Completed
1147

Monitoring Routine Disease Surveillance And Extension Through Stock Route Inspection And Farm Visit Kirinyaga West

Aug 05, 2024 Aug 05, 2024

100%

Completed
1148

Monitoring Routine Disease Surveillance And Extension Through Stock Route Inspection And Farm Visit Mwea West

Aug 26, 2024 Aug 30, 2024

100%

Completed
1149

Monitoring Routine Disease Surveillance And Extension Through Stock Route Inspection And Farm Visit Mwea West

Aug 19, 2024 Aug 23, 2024

100%

Completed
1150

Monitoring Routine Disease Surveillance And Extension Through Stock Route Inspection And Farm Visit Mwea West

Aug 19, 2024 Aug 23, 2024

100%

Completed
1151

Monitoring Selection Of Cohort II Agri-preneurs At Ward Level

May 14, 2024 May 17, 2024

100%

Completed
1152

Monitoring Sensitization Of PICD Process In NAVCDP To County Technical Staff And And CTAC

May 06, 2024 May 06, 2024

100%

Completed
1153

Monitoring Slaughter Slab Inspection And Meat Inspection Supervision

Sep 20, 2024 Sep 20, 2024

100%

Completed
1154

Monitoring Smallholder Aquaculture Group Training On Organizational Skills, GALS And Good Aquaculture Practices In K. East-Njukiini Ward

Jan 30, 2025 Jan 30, 2025

100%

Completed
1155

Monitoring Sunflower Seeds Distribution To Satellite Center(KIAGA)

May 14, 2024 May 17, 2024

100%

Completed
1156

Monitoring Surveillance Of Disease Outbreak Of Livestock In Mwea East And West

May 06, 2024 May 10, 2024

100%

Completed
1157

Monitoring Surveillance Of Floods To Livestock In Ndia

May 06, 2024 May 10, 2024

100%

Completed
1158

Monitoring Surveillance Of Slaughter Slabs In Kirinyaga Central

May 06, 2024 May 10, 2024

100%

Completed
1159

Monitoring The Repair Of 12 Unfunctional Incubator In The County.

Jun 03, 2024 Jun 14, 2024

100%

Completed
1160

Monitoring The Assessment Of Greenhouses Supported By NARIGP Project

Jun 03, 2024 Jun 14, 2024

100%

Completed
1161

Monitoring The Construction Of The Ponds Across The County For Grant By The ABDP Project.

Jul 15, 2024 Jul 19, 2024

100%

Completed
1162

Monitoring The Distribution OF Pesticides And PPES For The Control Of FAW To The Sub County Headquarters

May 31, 2024 May 31, 2024

100%

Completed
1163

Monitoring The Distribution Of Sunflower Seeds To The Subcounty For The Access To The Registered Farmers

May 20, 2024 May 23, 2024

100%

Completed
1164

Monitoring The Inspection Of Slaughter Slabs

Sep 02, 2024 Sep 02, 2024

100%

Completed
1165

Monitoring The Inspection Of Slaughter Slabs

Nov 30, -0001 Nov 30, -0001

100%

Completed
1166

Monitoring The Inspection Of Slaughter Slabs Kirinyaga Central

Jan 27, 2025 Jan 31, 2025

100%

Completed
1167

Monitoring The Performance Ward Based SACCOs

Oct 09, 2024 Oct 09, 2024

100%

Completed
1168

Monitoring The Performance Of Data Collection For Capacity Need Assessment (CNA) For Selected FPOs And Irrigation Cooperatives.

Oct 31, 2024 Nov 01, 2024

100%

Completed
1169

Monitoring The Progress Of Rice Fish Integration Demo Plots At Mwea MIAD

Oct 16, 2024 Oct 16, 2024

100%

Completed
1170

Monitoring The Progress Of The Community Development Plan (CDP) For The NAVCDP Project

May 31, 2024 May 31, 2024

100%

Completed
1171

Monitoring The Progress Of The Kangai Seedlins Propagation Centre

Sep 12, 2024 Sep 13, 2024

100%

Completed
1172

Monitoring The Progress Of The Rice – Fish Integration Demo Plots At Mwea MIAD

Sep 10, 2024 Sep 13, 2024

100%

Completed
1173

Monitoring The Progress Of The Ward Based Community Development Plan (CDP) For The NAVCDP Project.

May 31, 2024 May 31, 2024

100%

Completed
1174

Monitoring The Progress Of The Ward Based SACCO

Oct 09, 2024 Oct 11, 2024

%

Completed
1175

Monitoring The Prongress And Fish Stocking In The Rice-fish Intergration Demo At Mwea MIAD

Sep 13, 2024 Sep 13, 2024

100%

Completed
1176

Monitoring The Sub-county PICD Secondary Data Review

May 13, 2024 May 17, 2024

100%

Completed
1177

Monitoring The Vaccination Of Foot And Mouth Disease At Kirinyaga West, Kirinyaga Central Sub-counties Baricho And Inoi Areas.

Jul 01, 2024 Jul 04, 2024

100%

Completed
1178

Monitoring Vaccination Against FMD In Kangai Ward

Jul 15, 2024 Jul 19, 2024

100%

Completed
1179

Monthly Check-in Meeting With CDC-Kenya Team

Jul 18, 2024 Jul 18, 2024

100%

Completed
1180

Monthly Virtual Check-in Meeting With CDC Kenya Team On Progress Of The G2G Project

Sep 19, 2024 Sep 19, 2024

100%

Completed
1181

Montoring Extension Services For Fisheries ABDP On TIMPS Kirinyaga East

Aug 19, 2024 Aug 20, 2024

100%

Completed
1182

Montoring Routine Disease Surveillance And Extension Through Stock Route Inspection And Farm Visit Mwea West

Aug 26, 2024 Aug 30, 2024

100%

Completed
1183

Mosquito Nets Post-Household Registration County Stakeholders Meeting At Kerugoya CDF Hall.

May 16, 2024 May 16, 2024

100%

Completed
1184

Mosquito Nets Post-Household Registration Data Validation Exercise.

May 13, 2024 May 14, 2024

100%

Completed
1185

Mosquito Nets Post-Household Registration Sub-County Stakeholders Meeting At CCS Wang’uru.

May 15, 2024 May 15, 2024

100%

Completed
1186

MTP IV FORUM;Kerugoya Market

Jun 04, 2024 Jun 04, 2024

%

Completed
1187

Multi Institutional Technical Team Meeting For The Control Of Rats At Kerugoya CDA Office

Aug 05, 2024 Aug 05, 2024

100%

Completed
1188

Municipal Board Meeting

May 23, 2024 May 23, 2024

%

Overdue
1189

Music Festival At Eldoret

Aug 02, 2024 Aug 07, 2024

100%

Completed
1190

Music Festival At Eldoret

Nov 30, -0001 Nov 30, -0001

%

Overdue
1191

MUTIRA FCS ELECTIONS

Jul 12, 2024 Jul 12, 2024

0%

Completed
1192

MUTIRA FCS SPECIAL GENERAL MEETING

Jun 27, 2024 Jun 27, 2024

0%

Completed
1193

Mutira Youth Football League

Dec 17, 2023 Apr 28, 2024

%

Completed
1194

Mwea Market;Kagio Market

Jun 14, 2024 Jun 14, 2024

%

Completed
1195

Mwea Market;Kagio Market

Nov 30, -0001 Nov 30, -0001

%

Completed
1196

Mwea Market;Makutano Market

Jul 03, 2024 Jul 03, 2024

%

Completed
1197

Mwea Ngurubani Market Meeting;ESP Kimbimbi

May 13, 2024 Jun 13, 2024

0%

Completed
1198

Napenda Kusoma Meeting At St Michael Kerugoya

Jul 30, 2024 Jul 30, 2024

0%

Completed
1199

NASCOP Health Service Integration And Health System Strengthening Learning Session(Virtual)

Sep 30, 2024 Sep 30, 2024

100%

Completed
1200

NASCOP HIV Data Quality Assessment (DQA) And Service Quality Assessment (SQA) In Select Facilities In The County

Oct 31, 2024 Oct 31, 2024

100%

Completed
1201

Nation School Based Deworming Sub-county Level Training.

May 09, 2024 May 10, 2024

100%

Completed
1202

Nation School Based Deworming Sub-county Level Training.

May 13, 2024 May 14, 2024

100%

Completed
1203

National Equipment Service Project Facility Assessment Exercise

Jan 20, 2025 Jan 20, 2025

100%

Completed
1204

National Health Facility Census; 3rd -29th June 2024; Point Person- CCO

Jun 03, 2024 Jun 29, 2024

100%

Completed
1205

National Immunization Big-Catchup Support Supervision

Dec 02, 2024 Dec 06, 2024

100%

Completed
1206

National Immunization Target Setting Meeting

Dec 09, 2024 Dec 10, 2024

100%

Completed
1207

National Mass Net Distribution Campaign Weekly Review Meeting - Virtual

May 30, 2024 May 30, 2024

100%

Completed
1208

National Quality Assurance In Malaria Diagnostics Visit For Corrective Action And Improvement Plan

Dec 02, 2024 Dec 04, 2024

100%

Completed
1209

National School Based Deworming Program Planning Meeting – Virtual 7:30 – 8:30

Jun 18, 2024 Jun 18, 2024

100%

Completed
1210

National School Based Deworming Program Sub-County Training – Kirinyaga Central, Kirinyaga West, And Kirinyaga South-; Officers; CCO, CCHFP, CP, Select SCHMT Members And CHEWs

Jun 18, 2024 Jun 19, 2024

100%

Completed
1211

National School Based Deworming Program Sub-County Training – Kirinyaga East And Kirinyaga North; Officers; CCO, CCHFP, CP, Select SCHMT Members And CHEWs

Jun 20, 2024 Jun 21, 2024

100%

Completed
1212

National School Based Deworming Training At The County Level For ECDE And Primary Schools.

May 02, 2024 May 02, 2024

100%

Completed
1213

National Training Of Facilitator Workshop On Positive Deviance Hearth Approach

Sep 16, 2024 Sep 24, 2024

100%

Completed
1214

National Training Of Trainers On Cancer Awareness And Prevention

Dec 02, 2024 Dec 06, 2024

100%

Completed
1215

NAVCDP Meeting At Embu

Aug 09, 2024 Aug 10, 2024

100%

Completed
1216

NAVCDP Workshop

Apr 24, 2024 Apr 24, 2024

100%

Noted.

Work In Progress.

Completed
1217

NAVCDP WORKSHOP

Apr 28, 2024 Apr 01, 2024

%

Completed
1218

NB: Pending To Take Place On A Later Date -----Induction Of FIF Board And Hospital Board

Oct 18, 2024 Oct 18, 2024

100%

Completed
1219

NCDs Coordinators Caucus Meeting

Sep 27, 2024 Sep 27, 2024

100%

Completed
1220

Neglected Tropical Diseases Technical Working Group Meeting At Bekam Hotel

May 28, 2024 May 28, 2024

100%

Completed
1221

Nema Validation Meeting On E WASTE

Dec 16, 2024 Dec 16, 2024

100%

Day One On E WASTE Sessions Was Full Of High Level Enlightenment On The Kenyan And County Situation On Especially Data On E Waste.

Completed
1222

New KICOWASCO Board Members County Tour.

Feb 18, 2025 Feb 18, 2025

0%

The New Members Of Kicowasco Were Taken Through The Various Intakes And Sewer Treatment Site.

Completed
1223

NEW NGARIAMA SGM

Jul 25, 2024 Jul 25, 2024

0%

Completed
1224

New Year Back To Work Strategy;CAIPS

Jan 06, 2025 Jan 06, 2025

%

Completed
1225

Nutrition Data Quality Audit Indicators Planning Meeting

Jul 22, 2024 Jul 22, 2024

100%

Completed
1226

Nutrition Routine Data Quality Analysis – Site Visits

Jul 23, 2024 Jul 26, 2024

100%

Completed
1227

Nutrition, Deworming, Immunization Routine Data Quality Review Meeting - Kirinyaga West

Aug 23, 2024 Aug 23, 2024

100%

Completed
1228

Nutrition, Deworming, Immunization Routine Data Quality Review Meeting -Kirinyaga Central

Aug 20, 2024 Aug 20, 2024

100%

Completed
1229

Nutrition, Deworming, Immunization Routine Data Quality Review Meeting -Kirinyaga East

Aug 19, 2024 Aug 19, 2024

100%

Completed
1230

Nutrition, Deworming, Immunization Routine Data Quality Review Meeting -Mwea East

Aug 22, 2024 Aug 22, 2024

100%

Completed
1231

Nutrition, Deworming, Immunization Routine Data Quality Review Meeting -Mwea West

Aug 21, 2024 Aug 21, 2024

100%

Completed
1232

Nutrition, Deworming, Immunization Routine Data Quality Review Meeting-Mwea West

Aug 28, 2024 Aug 28, 2024

100%

Completed
1233

Nyangati Tents And Chairs

Sep 16, 2024 Sep 23, 2024

100%

Completed
1234

Off Duty

Oct 07, 2024 Oct 11, 2024

%

Completed
1235

Officce Duties And KIFCO AGM

Jul 18, 2024 Jul 18, 2024

0%

Completed
1236

Office Work ;Kutus Market

Nov 11, 2024 Nov 11, 2024

%

Completed
1237

Office ;Cooperatives

May 23, 2024 May 23, 2024

0%

Completed
1238

Office ;Kutus Market

Jul 15, 2024 Jul 15, 2024

%

Completed
1239

Office ;Markets;Cooperatives;Industrial Park

May 24, 2024 May 24, 2024

%

Completed
1240

Office Administration- Kutus & Kerugoya Offices

May 06, 2024 May 06, 2024

%

Completed
1241

OFFICE And KABARE SGM

Jul 11, 2024 Jul 11, 2024

0%

Completed
1242

OFFICE DAY

Jun 26, 2024 Jun 26, 2024

0%

Completed
1243

OFFICE DAY

Jun 28, 2024 Jun 28, 2024

0%

Completed
1244

OFFICE DAY

Jul 24, 2024 Jul 24, 2024

0%

Completed
1245

OFFICE DAY

Jul 05, 2024 Jul 05, 2024

0%

Completed
1246

OFFICE DAY

Jul 09, 2024 Jul 09, 2024

0%

Completed
1247

OFFICE DAY

Jul 15, 2024 Jul 15, 2024

0%

Completed
1248

OFFICE DAY

Jul 16, 2024 Jul 16, 2024

0%

Completed
1249

OFFICE DAY

Jul 19, 2024 Jul 19, 2024

0%

Completed
1250

OFFICE DAY

Jun 24, 2024 Nov 30, -0001

0%

Completed
1251

Office Meeting At 11:30AM

Apr 22, 2024 Apr 22, 2024

%

Completed
1252

Office Meeting At 5PM

Apr 22, 2024 Apr 22, 2024

0%

Completed
1253

Office Meeting At 9AM

Apr 22, 2024 Apr 22, 2024

%

Completed
1254

Office Task

May 20, 2024 May 31, 2024

%

Overdue
1255

Office Tasks

Jul 08, 2024 Jul 08, 2024

100%

Completed
1256

Office Work

Aug 26, 2024 Aug 26, 2024

100%

Completed
1257

Office Work

Apr 23, 2024 Apr 23, 2024

100%

Completed
1258

Office Work

Apr 25, 2024 Apr 25, 2024

%

Completed
1259

OFFICE WORK

Jul 22, 2024 Jul 22, 2024

100%

Completed
1260

OFFICE WORK

Sep 02, 2024 Nov 30, -0001

%

Overdue
1261

OFFICE WORK

Sep 02, 2024 Sep 02, 2024

%

Completed
1262

Office Work

Dec 11, 2024 Dec 11, 2024

%

Completed
1263

OFFICE WORK

Jul 05, 2024 Jul 05, 2024

100%

Completed
1264

Office Work

Nov 18, 2024 Nov 18, 2024

%

Completed
1265

OFFICE WORK

Jul 31, 2024 Jul 31, 2024

100%

Completed
1266

Office Work

Nov 25, 2024 Dec 25, 0024

%

Completed
1267

Office Work

Aug 02, 2024 Aug 02, 2024

100%

Completed
1268

Office Work

Jun 05, 2024 Nov 30, -0001

%

Completed
1269

OFFICE WORK

Sep 09, 2024 Sep 09, 2024

%

Completed
1270

Office Work

Jul 09, 2024 Jul 09, 2024

100%

Completed
1271

OFFICE WORK

Jul 09, 2024 Jul 09, 2024

100%

Completed
1272

OFFICE WORK

Jan 09, 2025 Jan 09, 2025

%

Completed
1273

Office Work

Jan 17, 2025 Jan 17, 2025

%

Completed
1274

Office Work

Jun 03, 2024 Jun 05, 2024

100%

Completed
1275

Office Work

Oct 23, 2024 Oct 23, 2024

%

Completed
1276

Office Work

Jun 18, 2024 Jun 18, 2024

0%

Completed
1277

Office Work ;Kagio Market

Nov 15, 2024 Nov 15, 2024

%

Completed
1278

OFFICE WORK AND KIBINGOTI ESP MARKET SITE VISIT

Jul 04, 2024 Jul 04, 2024

0%

Completed
1279

Office Work And Field

May 27, 2024 May 27, 2024

%

Completed
1280

Office Work And Markets

May 30, 2024 May 30, 2024

%

Completed
1281

OFFICE WORK AND MUKARARA SITE VISIT

Jul 02, 2024 Jul 02, 2024

0%

Completed
1282

OFFICE WORK AND MUTIRA FCS ELECTIONS PREPAREDNESS MEETING

Jul 08, 2024 Jul 08, 2024

0%

Completed
1283

OFFICE WORK AND MUTIRA FCS Offices Visit

Jul 03, 2024 Jul 03, 2024

0%

Completed
1284

OFFICE WORK AND SAIC SITE VISIT

Jul 01, 2024 Jul 01, 2024

0%

Completed
1285

Office Work Then Mwea Ngurubani Market Visit

Jul 05, 2024 Nov 30, -0001

%

Completed
1286

OFFICE WORK, GROUPS VISIT

Jul 18, 2024 Jul 18, 2024

100%

Completed
1287

Office Work: Market

Sep 23, 2024 Sep 23, 2024

%

Completed
1288

Office Work:CAIPS Meeting

Sep 17, 2024 Sep 17, 2024

%

Completed
1289

Office Work; CAIPs Meeting And Site Visit

May 28, 2024 May 28, 2024

%

Completed
1290

Office Work;CAIP Market;Kerugoya Market,

Sep 12, 2024 Sep 12, 2024

%

Completed
1291

Office Work;CAIP Visit

Jan 07, 2024 Jan 07, 2024

%

Completed
1292

Office Work;CAIP Visit

Jun 05, 2024 Jun 03, 2024

%

Completed
1293

Office Work;Cooperatives

Sep 01, 2024 Sep 01, 2024

%

Completed
1294

Office Work;Cooperatives

Oct 03, 2024 Oct 03, 2024

%

Completed
1295

Office Work;Cooperatives;Markets

Sep 02, 2024 Sep 02, 2024

%

Completed
1296

Office Work;Field Day

Jun 28, 2024 Jun 28, 2024

%

Completed
1297

Office Work;Field Visit On MUKARARA ESP Market;RECCE

Sep 13, 2024 Sep 13, 2024

%

Completed
1298

Office Work;Industrial Park

Jun 13, 2024 Jun 13, 2024

%

Completed
1299

Office Work;Industrial Park;Kagio Market

Sep 05, 2024 Nov 30, -0001

%

Completed
1300

Office Work;Kagio Market

Aug 05, 2024 Aug 05, 2024

%

Completed
1301

Office Work;Kerugoya Market

Oct 18, 2024 Oct 18, 2024

%

Completed
1302

Office Work;Kibirigwi FCS Elections Preparedness

Aug 21, 2024 Aug 21, 2024

%

Completed
1303

Office Work;Kutus Market

Nov 11, 2024 Nov 11, 2024

%

Completed
1304

Office Work;Kutus Market

Nov 27, 2024 Nov 27, 2024

%

Completed
1305

Office Work;Kutus Market

Jul 04, 2024 Jul 04, 2024

%

Completed
1306

Office Work;Kutus Market

May 17, 2024 May 17, 2024

%

Completed
1307

Office Work;Kutus Market Visit

Sep 19, 2024 Sep 19, 2024

%

Completed
1308

Office Work;Kutus Market/ Mukarara Market

Oct 22, 2024 Oct 22, 2024

%

Overdue
1309

Office Work;Market

Jul 16, 2024 Jul 16, 2024

%

Completed
1310

Office Work;Market Visit

Jun 20, 2024 Jun 20, 2024

%

Completed
1311

Office Work;Markets

Jun 25, 2024 Jun 25, 2024

%

Completed
1312

Office Work;Public Participation

Aug 12, 2024 Aug 12, 2024

%

Completed
1313

Office;Makutano Market

Nov 21, 2024 Nov 21, 2024

%

Completed
1314

Office;Markets;Cooperatives

May 21, 2024 May 21, 2024

%

Completed
1315

Official Commissioning Of The Digital X-Ray From LVCT Dhibiti By CECM Health

Mar 04, 2025 Mar 04, 2025

100%

Completed
1316

Official Day Off

Jul 12, 2024 Jul 12, 2024

100%

Completed
1317

Official Day Off

Dec 06, 2024 Dec 06, 2024

100%

Completed
1318

Official Day Off

Jul 29, 2024 Jul 29, 2024

100%

Completed
1319

Official Day Off

Jul 30, 2024 Jul 30, 2024

100%

Completed
1320

Official Day Off

Jul 31, 2024 Jul 31, 2024

100%

Completed
1321

Official Day Off

Aug 01, 2024 Aug 01, 2024

100%

Completed
1322

Official Day Off

Aug 02, 2024 Aug 02, 2024

100%

Completed
1323

Official Day Off

Oct 21, 2024 Oct 22, 2024

100%

Completed
1324

Official Opening Of Kiandagae Dispensary, Kirinyaga West

Dec 11, 2024 Dec 11, 2024

100%

Completed
1325

Official Opening Of Kiandai Dispensary In Kirinyaga East

Sep 17, 2024 Sep 17, 2024

100%

Completed
1326

Official Rollout Of The Digitalisation Of Kirinyaga County Public Health Facilities

Mar 20, 2025 Mar 20, 2025

100%

Completed
1327

Official Visit At Kibingoti Polytechniv

Jul 09, 2024 Jul 09, 2024

100%

Completed
1328

Official Visit To Mutu Polytechnic

Jul 10, 2024 Jul 12, 2024

0%

Completed
1329

Official Visit To Mutu Polytechnic

Jul 10, 2024 Jul 19, 2024

0%

Completed
1330

On Leave

Jun 21, 2024 Jun 21, 2024

100%

Completed
1331

On Leave

Jun 20, 2024 Jun 20, 2024

100%

Completed
1332

Online Meeting With NHIF/SHIF

Apr 24, 2024 Apr 24, 2024

100%

Completed
1333

Ordering Of Mosquito Nets For Distribution To Mwea Constituency In Early June.

May 24, 2024 May 24, 2024

100%

Completed
1334

Orgaising ECDE Learning Materials And Uniforms For Distribution Once Schools Open.

May 08, 2024 May 08, 2024

100%

Completed
1335

Organising ECDE Learning Materials For Distribution And Office Work

May 16, 2024 May 16, 2024

100%

Completed
1336

Organization Of Department Work Plan And Bursary Request Documentation

Jul 05, 2024 Jul 05, 2024

100%

Completed
1337

Orientation Of Agripreneurs Onboarded In The Engaging Kenyan Youth In Agriculture & Nutrition (EKYAN) Programme

Jul 31, 2024 Aug 01, 2024

100%

Completed
1338

Orientation Of The New Project Officer On The Wezesha Afya CoAg Project

Mar 03, 2025 Mar 03, 2025

100%

Completed
1339

Orientation On Malaria Data Quality Assessment

Dec 04, 2024 Dec 04, 2024

100%

Completed
1340

Overseeing Distribution Of Uniforms And Learning/teaching Materials

Jun 04, 2024 Jun 19, 2024

100%

Completed
1341

Oxygen, Maternal Newborn And Child Health Data Collection Exercise

Feb 10, 2025 Feb 14, 2025

100%

Completed
1342

Participation In The Ahiti Ndoba Field Day For The Goat AI

Feb 17, 2025 Feb 19, 2025

%

Completed
1343

Participation Of The 8th Agricultural Expo For The Agricultural Innovation And Technological Innovations Management Practices (TIMPS )

Feb 19, 2025 Feb 20, 2025

%

Completed
1344

Participatory Integrated Community Development Workshop- Various Venues- Participants- Community Health Assistants.

May 16, 2024 May 16, 2024

100%

Completed
1345

PARTNERSHIPS MANAGEMENT- REVIEW MEETING WITH CDC USA TEAM

May 28, 2024 May 28, 2024

0%

Completed
1346

PERFOMANCE CONTRACT SYNCRONIZATION

Jun 24, 2024 Jun 24, 2024

100%

The Meeting Happened And We Harmonized Our  Contract And Have Since Forwarded The Same To The Secretariat

Completed
1347

Performace Contract Vetting

Jul 22, 2024 Jul 24, 2024

40%

Performance Contract Appraisal Exercise With The The County Secretary.

Overdue
1348

Phase 1 Training On Gender, Equity And Human Rights Integration In Health Sector At County Level

Oct 01, 2024 Oct 04, 2024

100%

Completed
1349

Phase II Malezi Bora Activity

Oct 14, 2024 Oct 16, 2024

100%

Completed
1350

Phase II Malezi Bora Activity Day 4

Oct 15, 2024 Oct 15, 2024

100%

Completed
1351

Piloting Of Community Data Quality Audit Tool In ECHIS Within The County– 3rd – 7th June 2024; Key Officers- CHRIO And Community Health Focal Person.

Jun 03, 2024 Jun 07, 2024

100%

Completed
1352

PIPES AND ASSORTED MATERIALS DISTRIBUTION IN KANGAI WARD

Aug 12, 2024 Aug 12, 2024

100%

The Activity Went On Very Well Led By HE The Governor And Members Of The Public Really Appreciated

Completed
1353

Planning And Preparation For The Agriculture Field Day To Be Held At Kamweti ATVET

Jan 22, 2025 Jan 22, 2025

80%

Overdue
1354

PLANNING FOR SPACE AND RECEIVING OF PIPES, TANKS AND SKIP BEANS

Sep 25, 2024 Sep 25, 2024

100%

This Activity Took Place And All The Departments Materials Were Assigned An Appropriate Space For Display.

Completed
1355

Planning Meeting For The Sensitization Of Community Health Committees In Kirinyaga Central, Kirinyaga West And Kirinyaga East Sub-Counties

Mar 26, 2025 Mar 26, 2025

100%

Completed
1356

Plant Health Rallies For The Control Of FAW ( Fall Army Worm)

Oct 17, 2024 Oct 18, 2024

100%

Completed
1357

Post G7 Summit Briefing

Sep 27, 2024 Sep 27, 2024

100%

Completed
1358

Post Malezi Bora Review Meeting

Oct 18, 2024 Oct 18, 2024

100%

Completed
1359

Post Malezi Bora Review Meeting;

Oct 25, 2024 Oct 25, 2024

100%

Completed
1360

Post Malezi Bora Vitamin A Supplementation + Deworming Data Review Meeting – Bekam Hotel; Officers SCHMT Members

Jun 13, 2024 Jun 13, 2024

100%

Completed
1361

Post Mosquito Net Distribution Sub-County Stakeholders Meeting

Sep 18, 2024 Sep 18, 2024

100%

Completed
1362

Post Mosquito Net Distribution Sub-County Stakeholders Meeting

Sep 20, 2024 Sep 20, 2024

100%

Completed
1363

Post Mosquito Nets Distribution Report Writing

Sep 16, 2024 Sep 17, 2024

100%

Completed
1364

Post School Based Deworming Review Meeting

Aug 12, 2024 Aug 12, 2024

100%

Completed
1365

Post-Mass Net Distribution Campaign Review Meeting

Sep 23, 2024 Sep 23, 2024

100%

Completed
1366

Post-Partum Family Planning Study Review Meeting

Oct 14, 2024 Oct 14, 2024

100%

Completed
1367

Post-Primary Health Care Networks-Baseline/draft Analysis Report

Jul 29, 2024 Jul 30, 2024

100%

Completed
1368

PPP CAIPS FORUM In Naivasha

Jun 10, 2024 Jun 12, 2024

%

Completed
1369

Pre-visit Meeting To Plan For Johnson And Johnson Visit On 29 October To Monitor Progress Of The Primary Care Networks;

Oct 24, 2024 Oct 24, 2024

100%

Completed
1370

Preparation For Senate Appearance

Jun 18, 2024 Jun 18, 2024

100%

Completed
1371

Preparation Of 2024/2025 Performance Contracts

Jun 24, 2024 Jun 25, 2024

%

Overdue
1372

Preparation Of 2024/25 Workplan

Jun 17, 2024 Jun 17, 2024

100%

Completed
1373

Preparation Of Audit Reports

Oct 28, 2024 Oct 29, 2024

100%

Completed
1374

Preparation Of Departmental Briefs To Present To The Cabinet

Jul 30, 2024 Jul 30, 2024

0%

Completed
1375

Preparation Of H.E Arrival Both At Residence And HQ

May 13, 2024 May 13, 2024

100%

Completed
1376

Preparation Of Jamuhuri Celebration Meeting

May 28, 2024 May 28, 2024

100%

Completed
1377

Preparation Of Monthly Bursary Reconciliations

May 15, 2024 May 15, 2024

100%

Completed
1378

Preparation Of Performance Contract.

Jul 22, 2024 Jul 22, 2024

100%

Completed
1379

Preparatory Meeting For Primary Data Collection At The Ward Leve

May 27, 2024 May 27, 2024

100%

Completed
1380

Preparing Departmental Reports

Jul 08, 2024 Jul 08, 2024

100%

Completed
1381

Pretesting Of Health System Performance Index Tool

Aug 29, 2024 Aug 29, 2024

100%

Completed
1382

Pretesting Of Health System Performance Index Tool

Sep 03, 2024 Sep 03, 2024

100%

Completed
1383

Procurement Process

Apr 22, 2024 Apr 22, 2024

100%

Completed
1384

Project Inspection

Jul 29, 2024 Aug 02, 2024

%

Overdue
1385

PROJECT MANAGEMENT

May 21, 2024 May 23, 2024

0%

Completed
1386

Projects Implementation Status

Jun 03, 2024 Jun 10, 2024

100%

Completed
1387

Projects Progress Report

Jun 24, 2024 Jul 01, 2024

100%

Completed
1388

Projects Visit By Auditors,Display Items

Sep 20, 2024 Dec 20, 2024

%

Completed
1389

Public Engagement Forums On GBV Activism

Dec 02, 2024 Dec 03, 2024

100%

Completed
1390

Public Finance Management(Kirinyaga County Alcoholic Drinks Control Fund)Regulations 2024

Apr 19, 2024 Apr 26, 2024

%

Completed
1391

Public Health/Environmental Health Campaign Meeting

Oct 14, 2024 Oct 14, 2024

100%

Completed
1392

Public Holiday

Nov 01, 2024 Nov 01, 2024

100%

Completed
1393

Public Participation

Oct 28, 2024 Nov 01, 2024

%

Overdue
1394

Public Participation

Aug 05, 2024 Nov 30, -0001

%

Completed
1395

Public Participation At Industrial Park

May 31, 2024 May 31, 2024

100%

Completed
1396

Public Participation Exercise At Kagio Market

Nov 12, 2024 Nov 12, 2024

100%

Completed
1397

Public Participation Meetings On Liqour Issues

Nov 26, 2024 Dec 04, 2024

100%

Completed
1398

Public Participation On Annual Development Plan(ADP) Activities In The 20 Wards

Aug 13, 2024 Aug 16, 2024

100%

Completed
1399

PUBLIC PARTICIPATION ON E WATER

Aug 22, 2024 Aug 22, 2024

100%

The Public Participation Exercise Took Place And Members Of Public Were Okey With E Water Project

Completed
1400

Public Participation On KICOWASCO In MWEA

Nov 13, 2024 Nov 13, 2024

100%

Members Of The Public Were Engaged And Gave Responses.

Completed
1401

Public Participation On The Annual Development Plan (ADP) Activitity.

Aug 13, 2024 Aug 16, 2024

100%

Completed
1402

QUALITY ASSESSMENT EXERCISE BY TVETA

Aug 26, 2024 Aug 26, 2024

100%

Completed
1403

Quarter 3-Wezesha Afya Technical Report Feedback Meeting

Aug 06, 2024 Aug 06, 2024

100%

Completed
1404

Quarterly Consultative Meeting Between CoG And County Directors Of Health

Jul 10, 2024 Jul 12, 2024

100%

Completed
1405

Quarterly Departmental Motor Vehicle Assessment

May 31, 2024 May 31, 2024

100%

Completed
1406

QUARTERLY MEETING FOR CECMS INCHARGE OF ENERGY, ENVIRONMENT, WATER, CLIMATE CHANGE AND NATURAL RESOURCES

Sep 18, 2024 Sep 19, 2024

100%

Various Players And Partners Were On Boarded In The Meeting That Brought Together All CECMS Of Environment And State Departments Of Water , Environment, Energy, Mining And COG Secretariat Where Various Knowledge Sharing Activities And Lessons Were Deliberated On.

Completed
1407

QUARTERLY REVIEW MEETING FOR COUNTY HEALTH CHIEF OFFICERS

May 15, 2024 May 17, 2024

%

Completed
1408

Quarterly Slaughter Slabs Monitoring Gichugu

May 14, 2024 May 17, 2024

100%

Completed
1409

QUARTYERLY MEETING FOR CECMS EECCNRWI IN TAITA TAVETA COUNTY

Jun 16, 2024 Jun 20, 2024

100%

This Meeting Took Place And Several Issues Were Highlighted Up To And Including,

1. Conservation Of Forests Which Earn Counties Carbon Credits Through REDD+

2.Involvement Of Local Communities In Identification Of Projects For FLLoCA

3. Dump Site Upgrading And Possible Construction Of MRFs In Solid Waste Management.

Completed
1410

Rapid Disease Control Awareness Campaign -Dairy Stakeholder’s Forum

Aug 20, 2024 Aug 23, 2024

100%

Completed
1411

Rapid Disease Control Awareness Campaign Through Zonal Meetings

Aug 26, 2024 Aug 30, 2024

100%

Completed
1412

Rapid Disease Control Awareness Campaign Through Zonal Meetings

Aug 26, 2024 Aug 30, 2024

100%

Completed
1413

Rapid Disease Control For TOT Meeting

Aug 23, 2024 Aug 23, 2024

100%

Completed
1414

Rapid Disease Control For Trainer Of Trainers (TOT) Meeting.

Aug 21, 2024 Aug 22, 2024

100%

Completed
1415

Re-survey And Beaconing Of Industrial Park Land

May 20, 2024 May 24, 2024

%

Overdue
1416

Recce On E Water Visit

Mar 03, 2025 Mar 03, 2025

%

Overdue
1417

RECCE To G7 Route Map

Sep 10, 2024 Sep 10, 2024

100%

The Recce Tour Was Ok In All The Four Visited Sites

Completed
1418

RECCE To The Remaining Destinations For The G7

Sep 11, 2024 Sep 11, 2024

100%

A Second Day Recce Was Conducted And The Sites Visited Were Ok

Completed
1419

Receipt Of Medicines And Medical Supplies From KEMSA To Hospitals

Sep 09, 2024 Sep 11, 2024

100%

Completed
1420

REDCROSS, COUNTY AND KIRINYAGA UNIVERSITY KUTUS TOWN CLEAN UP

Oct 25, 2024 Oct 25, 2024

100%

The Members Of The Kutus Market Fraternity Where The Clean Up Exercise Took Place Were Very Happy And By Extension Committed To Ensure That The Environment Is Kept Safe And Clean.

Completed
1421

Refresher Training For Lab Officers On TB Diagnostics

Oct 15, 2024 Oct 15, 2024

100%

Completed
1422

Regional Music Festival

Jul 01, 2024 Jul 05, 2024

100%

Completed
1423

Regional Sensitization Public Awareness And Capacity Building On Drug And Substance Abuse Focusing On Tobacco Use E

Nov 26, 2024 Nov 28, 2024

100%

Completed
1424

Report Generation

Nov 08, 2024 Nov 08, 2024

100%

Completed
1425

Report Generation

Oct 02, 2024 Oct 02, 2024

100%

Completed
1426

Report Generation

May 21, 2024 May 21, 2024

100%

Completed
1427

Report Generation

Oct 24, 2024 Oct 24, 2024

100%

Completed
1428

Report Writing On Alignment Of Priority Projects Identified By Ward Climate Change Committees

Jun 28, 2024 Jun 28, 2024

%

Overdue
1429

Requisitions

May 24, 2024 May 24, 2024

100%

Completed
1430

Resolving The Issue Of PSV Operators In Kerugoya

Jul 08, 2024 Jul 12, 2024

%

Overdue
1431

Response To Various Issues Raised By County Assembly

May 27, 2024 May 29, 2024

0%

Completed
1432

Restoration And Opening Thigirichi-Karima Public Access Road In Kariti Ward

Jul 29, 2024 Aug 02, 2024

0%

Overdue
1433

Revenue Collection

May 20, 2024 May 24, 2024

80%

Overdue
1434

Revenue Mobilization

Mar 11, 2025 Apr 01, 2025

%

Overdue
1435

Revenue Mobilization

May 20, 2024 May 24, 2024

%

Overdue
1436

Reviel Assessment Of Poultry Cage Farming Groups Supported By NARIGP

Jun 17, 2024 Jun 28, 2024

100%

Completed
1437

Review The Status Of All Banana Aggregation Centers

Jun 17, 2024 Jun 28, 2024

100%

Completed
1438

Review Of Assessment Reports Of Banana Aggregation Centers

Jul 17, 2024 Jun 24, 2024

100%

Completed
1439

Review Of Budget Status

Jun 28, 2024 Jun 28, 2024

100%

Completed
1440

Review Of Bursary Documents With Bursary Secretaries.

Jul 23, 2024 Jul 23, 2024

100%

Completed
1441

REVIEW OF FLOCCA WORK PLAN

Oct 08, 2024 Oct 09, 2024

100%

This Was Done And The Various Inputs And As Guided Were Considered Pending Cabinet Approval.

Completed
1442

Review Of Irrigation Cooperatives

Jun 03, 2024 Jun 14, 2024

100%

Completed
1443

REVIEW OF K WASH PRESENTATION IN READINESS FOR THE MONDAY PRESENTATION

Dec 04, 2024 Dec 04, 2024

100%

A Harmonized Report Was Developed,

Completed
1444

REVIEW OF K WASH WORK PLANS

Oct 07, 2024 Oct 08, 2024

100%

All The Various Team Players From Both The Health Department As Well As The Water Department Gave Further Input In Preparation For Presentation To HE For Her Comments.

Completed
1445

Review Of Progress At Kianyaga Level 4 Hospital

Jun 26, 2024 Jun 26, 2024

70%

Overdue
1446

Review Of Progress At Kimbimbi Level 4 Hospital

Jun 25, 2024 Jun 25, 2024

70%

Overdue
1447

Review Of Strategic Plan

May 22, 2024 May 22, 2024

100%

Completed
1448

Review On Partners Implementation Meeting

Nov 26, 2024 Nov 26, 2024

100%

Completed
1449

Review Reports After The Assessment Of Greenhouses And Seedlings Nursery Supported By The Narigp Project.

Jun 17, 2024 Jun 28, 2024

100%

Completed
1450

Review The Repair Of Faulty Incubators

Jun 17, 2024 Jun 28, 2024

100%

Completed
1451

Reviewal Assessment Of Dairy Goat Farmers Supported By NARIGP

Jun 17, 2024 Jun 28, 2024

100%

Completed
1452

Reviewal Assessment Of Dairy Farmers Supported Through Fodder Production By NARIGP

Jun 17, 2024 Jun 28, 2024

100%

Completed
1453

Reviewal Assessment Of Feed Mixtures Supported By NARIGP

Jun 17, 2024 Jun 28, 2024

100%

Completed
1454

Reviewal Assessment Of Functional Incubators But Not Functional

Jun 17, 2024 Jun 28, 2024

100%

Completed
1455

Reviewal Assessment Of Of Coffee Pulping Stations In The County

Jun 17, 2024 Jun 28, 2024

100%

Completed
1456

Reviewing Assessment Of Greenhouses Supported By NARIGP

Jun 17, 2024 Jun 28, 2024

100%

Completed
1457

Reviewing Of Irrigation Cooperatives

Jun 03, 2024 Jun 14, 2024

100%

Completed
1458

Reviewing Assessement Of Seedlings Nurseries Supported By NARIGP

Jun 17, 2024 Jun 28, 2024

100%

Completed
1459

Reviewing Of Performance Contracts

Jul 23, 2024 Jul 23, 2024

100%

Completed
1460

Ring Vaccination Against LSD

Aug 20, 2024 Aug 22, 2024

100%

Completed
1461

RMNCAH Target Setting Meeting

Jan 23, 2025 Jan 23, 2025

100%

Completed
1462

RMS MEETING

Aug 05, 2024 Aug 05, 2024

100%

Completed
1463

Rollout Of Neglected Tropical Diseases Score Card

Oct 07, 2024 Oct 09, 2024

100%

Completed
1464

ROUND UP CHECK FOR BARICHU, KIBURU, KIBIRIGWI AND KIBINGOTI CLEANLINESS STATUS

Jul 16, 2024 Jul 16, 2024

100%

I Went Round As Planned But Found The Buckhoe Stuck At Kiburu As It Broke One Of The Hydraulic Pipes Which I Organised  With The Works Department And Had It Fixed. Great Improvement Noted

Completed
1465

Route Map Discussion For Meko Distribution In Ngariama Ward

Apr 23, 2024 Apr 26, 2024

%

Overdue
1466

ROUTINE Check

Mar 05, 2025 Mar 05, 2025

%

Overdue
1467

ROUTINE TOWN CLEAN UP SPOT CHECK

Aug 29, 2024 Aug 29, 2024

100%

This Is An Activity That Has Been Beefed Up By Status Reports On The Total Garbage Collected Per Week.

Completed
1468

ROUTINE CHECK UP

Jan 21, 2025 Jan 21, 2025

100%

The Status Of Cleanliness Required Some Improvement And Thus I Sat With The Supervisors To Check On What The Issues Were.

Completed
1469

ROUTINE CHECK UP IN KAGIO, SAGANA AND KIBIRIGWI AND KIANGAI

Jul 23, 2024 Jul 23, 2024

100%

The Exercise Observed A Routine And Regular Cleanliness Of Our Towns.

Completed
1470

ROUTINE CLEAN UP CHECKS

Jun 24, 2024 Jun 29, 2024

100%

Our Towns Are Clean Save For Some Delays In Collection Occasioned By Break Downs Of Our Machinery.

Completed
1471

ROUTINE CLEANLINESS CHECK OF KAGIO, BARICHU, KIBURU, KIANGAI, KIBINGOTI, KIBIRIGWI AND SAGANA TOWNS

Jan 20, 2025 Jan 20, 2025

100%

Collection Of Garbage Was On Course And The Cleanliness Of Towns Was On Course As Well.

Completed
1472

Routine Disease Surveillance And Extension Through Stock Route Inspection And Farm Visits

Oct 09, 2024 Oct 11, 2024

100%

Completed
1473

Routine Dispute Tasks, Dispute Resolution Meetings And Dispute Site Visits

Jul 17, 2024 Jul 31, 2024

%

Overdue
1474

Routine Dispute Tasks, Dispute Resolution Meetings And Dispute Site Visits

Jul 09, 2024 Jul 31, 2024

%

Overdue
1475

Routine Duties

Aug 05, 2024 Aug 09, 2024

80%

Completed
1476

Routine Immunization Catch-up Planning Meeting;

Nov 04, 2024 Nov 05, 2024

100%

Completed
1477

Routine Immunization Catch-up Sub-County Planning Meeting

Nov 11, 2024 Nov 12, 2024

100%

Completed
1478

ROUTINE INSPECTION

Oct 15, 2024 Oct 15, 2024

100%

Despite The Challenge Of Collection Occasioned By The Breakdown Of The Buckhoe The Towns Are Clean With The Concerted Efforts Of Manual Collection Of Waste.

Completed
1479

ROUTINE INSPECTION ALONG MAKUTANO SAGANA KIANGAI ROUTE

Oct 22, 2024 Oct 22, 2024

100%

Our Team Of Cleaners And Supervisors Are On Ground And Good Effort Noted On The Cleanliness Status Of Our Towns.

Completed
1480

Routine Inspection Of Kerugoya Kagio Sagana And Makutano Towns

Dec 04, 2024 Dec 04, 2024

100%

There Is A General Improvement On The Status Of Cleanliness

Completed
1481

Routine Malaria Entomological Surveillance

Dec 10, 2024 Dec 11, 2024

100%

Completed
1482

Routine Malaria Entomological Surveillance

Sep 16, 2024 Sep 25, 2024

100%

Completed
1483

ROUTINE MANAGEMENT OF TOWN CLEANING AND GARBAGE COLLECTION

Jul 01, 2024 Jul 05, 2024

100%

The Impromptu Checks Have Really Improved The Cleanliness Standards  In Our Towns. This Includes Checking On The Status Of Our Drainages.

Completed
1484

ROUTINE MANAGEMENT OF TOWN CLEANING AND GARBAGE COLLECTION

Jun 03, 2024 Jun 07, 2024

100%

The Cleaning Bit Is Thorough In Our Towns Save For Some Delays In Collection Occasioned By Challenges In Our Collection Equipments

Completed
1485

ROUTINE MANAGEMENT OF TOWN CLEANING AND GARBAGE COLLECTION

May 20, 2024 May 24, 2024

100%

On Track

Completed
1486

ROUTINE MANAGEMENT OF TOWN CLEANING AND GARBAGE COLLECTION

May 20, 2024 May 25, 2024

100%

Cleaning Works And And Collection Effective On The Areas We Conducted Spot Checks

Completed
1487

Routine Office Works

Aug 26, 2024 Aug 30, 2024

%

Overdue
1488

ROUTINE ROUNDS ON CLEANING CHECK UP

Aug 19, 2024 Aug 19, 2024

100%

The Visited Towns Are Well Off In Terms Of Cleanliness

Completed
1489

Routine Services

Jul 02, 2024 Jul 31, 2024

70%

Overdue
1490

Routine Services To The Public

Jul 29, 2024 Aug 02, 2024

0%

Overdue
1491

ROUTINE SPOT CHECK

Sep 23, 2024 Sep 23, 2024

100%

The County Is Clean And Ready For Visitors.

Completed
1492

ROUTINE SPOT CHECK ALONG THE MWEA CORRIDOR

Nov 07, 2024 Nov 07, 2024

100%

Good Work In Progress

Completed
1493

ROUTINE SPOT CHECK OF KAGIO SAGANA CLEANLINESS CHECK

Jan 08, 2025 Jan 08, 2025

100%


There Is A Skip In Sagana That Needs To Be Replaced As It Is No Longer Liftable. The Buck Hoe Has However Emptied It. All The Other Areas Are Ok.

Completed
1494

Routine Spot Check On Kagio, Baricho Mukinduri And Kerugoya Towns

Sep 09, 2024 Sep 09, 2024

100%

The Towns Were Clean As Visited

Completed
1495

ROUTINE SPOT CHECK ON NDIA ROUTE

Nov 20, 2024 Nov 20, 2024

100%

Our Officers On The Ground Have And Are Doing A Good Job In As Far As Environmental Cleanliness Is Concerned.

Completed
1496

ROUTINE SPOT CHECKS ON THE STATUS OF MUKINDURI, KAGUMO AND KERUGOYA

Aug 09, 2024 Aug 09, 2024

100%

The Exercise Justified And Confirmed That Our Markets Are Well Cleaned

Completed
1497

Routine Vaccination Big-Catchup Mentorship At Immunizing Facilities

Nov 13, 2024 Nov 15, 2024

100%

Completed
1498

Routine Vaccination Big-Catchup Planning Meeting;

Nov 07, 2024 Nov 08, 2024

100%

Completed
1499

RRI ON KUTUS AND KERUGOYA DRAINAGES

Jul 04, 2024 Nov 30, -0001

100%

Good Work In Progress

Completed
1500

RUKANGA Meeting

Oct 31, 2024 Nov 01, 2024

100%

Completed
1501

Rukanga Public Balaza

May 30, 2024 May 31, 2024

100%

Completed
1502

Rurii Inspection

Jun 07, 2024 Jun 07, 2024

100%

Completed
1503

RUWASCO BOARD MEETING

Jun 25, 2024 Jun 25, 2024

100%

The Meeting Was Held And Budget And Next Financial Years Programs Were Presented For Approval By The BOARD.

Completed
1504

RUWASCO BOARD MEETING

Aug 30, 2024 Aug 30, 2024

100%

Board Of Directors Were Taken Through The Progress Of The Company Performance As Well As Approving The Necessary Approvals Sought

Completed
1505

RUWASCO Meeting

Sep 23, 2024 Sep 24, 2024

100%

Completed
1506

RUWASCO Meeting

Sep 19, 2024 Sep 20, 2024

100%

Completed
1507

SAFARICOM ON MY COUNTY APP MEETING

Jun 10, 2024 Jun 10, 2024

100%

The Meeting Was Successful And The Senior Officials Were Enlightened More My County App Operations Supported By Safaricom

Completed
1508

Sagana Industrial Park

May 27, 2024 Jun 30, 2024

80%

Overdue
1509

Sagana Industrial Park

Aug 05, 2024 Aug 10, 2024

%

Overdue
1510

SAGANA INDUSTRIAL PARK Site Visit

Jul 17, 2024 Jul 17, 2024

0%

Completed
1511

SAIC

Oct 29, 2024 Oct 29, 2024

%

Completed
1512

SAIC

Jul 11, 2024 Jul 11, 2024

%

Completed
1513

SAIC Visit

Aug 07, 2024 Aug 07, 2024

%

Completed
1514

SAIC VISIT ;Kagio Market

Jun 03, 2024 Jun 03, 2024

%

Completed
1515

SAIC VISIT;MARKETS SUPERVISION

Mar 06, 2024 Mar 06, 2024

%

Completed
1516

SCHMT Sensitization On Hormonal IUD - Bekam Hotel. Officers Involved; 4 SCHMT Members

Jun 12, 2024 Jun 12, 2024

100%

Completed
1517

Scientific Conference On Climate Change And Health

Oct 15, 2024 Oct 18, 2024

100%

Completed
1518

SENATE ATTENDANCE ON KIRIWASCO OAG QUERRIES

Nov 26, 2024 Nov 26, 2024

100%

Attended To The Senate Meeting And Had Deliberations On The Issues Raised By The OAG And A Further Report To Be Done.

Completed
1519

Senate Bursary Audit Responses.

May 06, 2024 May 07, 2024

100%

Completed
1520

Senior Staff Briefing At Kutus Headquaters

May 27, 2024 May 27, 2024

100%

Completed
1521

Senior Staff Meeting

May 27, 2024 May 27, 2024

100%

Completed
1522

Senior Staff Meeting

May 27, 2024 May 27, 2024

100%

Completed
1523

Senior Staff Meeting For The Preparation Of Public Participation For The County

Feb 10, 2025 Feb 10, 2025

%

Completed
1524

Senior Staffs Meeting For The Preparation Of Public Participation For The County

Feb 10, 2025 Feb 10, 2025

100%

Completed
1525

Sensitization Meeting On The Adolescent And Young Persons (AYP) Package Of Care For HIV Prevention And Treatment Guidance; Kiambu; Officer- CASCO; AYP Focal Person; Kerugoya CCC Clinician

Jun 13, 2024 Jun 14, 2024

100%

Completed
1526

Sensitization Of 50 CHPs On Hormonal IUD – Kerugoya CDF Hall

Jun 13, 2024 Jun 13, 2024

100%

Completed
1527

Sensitization Of CHMT/SCHMT On Upcoming CHP Training

Nov 30, -0001 Jul 09, 2024

100%

Completed
1528

Sensitization Of Community Health Committee Members In Mwea East And Mwea West

Jul 12, 2024 Jul 12, 2024

100%

Completed
1529

Sensitization Of Facility In Charges Of Phase II Malezi Bora Activity

Oct 07, 2024 Oct 07, 2024

100%

Completed
1530

Sensitization Of Facility-wide Adoption Kenya EMR 3.0- Naivasha – CDH, CHRIO, CASCO, County Pharmacist

May 30, 2024 May 30, 2024

100%

Completed
1531

Sensitization Of Members Of County Assembly On The PICD Project

May 20, 2024 May 20, 2024

100%

Completed
1532

Sensitization Of PICD Process To County County Assembly

May 20, 2024 May 20, 2024

100%

Completed
1533

Sensitization Of SACCO Officials On Budget Preparation, Credit Management & Automation.

Sep 03, 2024 Sep 06, 2024

100%

Completed
1534

Sensitization Of SCHMT On Primary Health Care Networks - Kirinyaga Central, East And West;

Jul 22, 2024 Jul 23, 2024

100%

Completed
1535

Sensitization On Digitization Of Kirinyaga South Primary HealthCare Network; CHMT And Kirinyaga South SCHMT; Venue To Be Determined.

Aug 02, 2024 Aug 02, 2024

100%

Completed
1536

Sensitization On Screening, Brief Intervention And Referral To Treatment (SBIRT) Programme For Substance Abuse

Mar 27, 2025 Mar 28, 2025

100%

Completed
1537

SERVICE DELIVERY-COUNTY DATA REVIEW MEETING

Jun 26, 2024 Jun 26, 2024

0%

Completed
1538

Serving Walk Ins From 10.00 A.m - 12.00 Noon

Jul 01, 2024 Jul 01, 2024

100%

Completed
1539

Serving Walk Ins From 8.00 - 10.00 A.m

Jul 02, 2024 Jul 02, 2024

100%

Completed
1540

Sewer Inspection

Oct 14, 2024 Oct 15, 2024

100%

Completed
1541

SEZ;Rainforest Meeting

Jan 13, 2025 Jan 13, 2025

%

Completed
1542

SEZA Public Participation For SAIC

Jun 25, 2024 Jun 25, 2024

0%

Completed
1543

SGM;Industrial Park

Aug 06, 2024 Aug 06, 2024

%

Completed
1544

SHealth Services Delivery- Medical Gases Plant And Back Up At Kerugoya

May 14, 2024 May 14, 2024

0%

Completed
1545

Signing Of Performance Contracts

Jul 23, 2024 Jul 23, 2024

100%

Completed
1546

Site Inspection

May 20, 2024 May 24, 2024

%

Overdue
1547

Site Visit At Kianyaga Stadium Ahead Of G7

Sep 23, 2024 Sep 23, 2024

100%

Completed
1548

Site Visit In Kianyaga Sub-county Hospital Complex

Apr 23, 2024 Apr 23, 2024

100%

Deadlines On Completion Of Works For Each Sub-contractor Were Agreed Upon And Most Of Them Fell On 31st May 2024.

The MC Indicated That Works Were Slow Due To Delay In Payments.

Completed
1549

Site Visits To Conduct Case Reviews In Selected Advanced HIV Disease And TB Centers Of Excellences (CoEs)

Feb 03, 2025 Feb 07, 2025

100%

Completed
1550

SMS Validation Workshop On Hypertension & Diabetes

Oct 01, 2024 Oct 03, 2024

100%

Completed
1551

Social Health Insurance Fund Virtual Training On Emergency Module For Level 3 Facilities

Feb 11, 2025 Feb 11, 2025

100%

Completed
1552

Social Health Insurance Fund Virtual Training On Emergency Module For Level 3 Facilities

Feb 17, 2025 Feb 17, 2025

100%

Completed
1553

Social Health Insurance Registration Coordination Meeting;

Nov 04, 2024 Nov 04, 2024

100%

Completed
1554

South Ngariama

Dec 07, 2024 Jul 31, 2024

0%

Overdue
1555

South Ngariama

Jul 02, 2024 Jul 31, 2024

%

Overdue
1556

South Ngariama

Nov 11, 2024 Nov 15, 2024

0%

Overdue
1557

South Ngariama, Riadira Morgue, Municipality Meeting With County Assembly

Nov 11, 2024 Nov 15, 2024

%

Overdue
1558

Special General Meeting

Jun 27, 2024 Jun 27, 2024

%

Completed
1559

Sports Equipments Verification

Jun 18, 2024 Jun 25, 2024

100%

Completed
1560

SPOT CHECK FOLLOW UP IN THE FIELD

Jul 08, 2024 Jul 08, 2024

100%

On Visiting The Mwea Makutano Corridor I Have Noted A Great Level Of Improvement Especially With The Collection Of Garbage Which Was A Major Challenge. The Residents Are Happy.

Completed
1561

Spot Check For Global Fund Activities In Counties

Oct 14, 2024 Oct 18, 2024

100%

Completed
1562

Spot Road Improvement Around Kimbimbi Town

May 15, 2024 May 15, 2024

%

Overdue
1563

Staff Audit Of COVID-19 Supported Staff By Ministry Of Health Officials.

May 20, 2024 May 20, 2024

100%

Completed
1564

Staff Capacity Building On Coffee Agronomy

Dec 16, 2024 Dec 18, 2024

100%

Completed
1565

Staff Capacity Building On Coffee Agronomy

Dec 19, 2024 Dec 20, 2024

100%

Completed
1566

Staff Capacity Building On Integrated Pest Management

Aug 22, 2024 Aug 23, 2024

100%

Completed
1567

STAFF MEETING

Jul 10, 2024 Jul 10, 2024

100%

Completed
1568

STAFF MEETING IN THE OFFICE

Jul 12, 2024 Jul 12, 2024

100%

Completed
1569

Staff Training And Sensitization On By Agriculture Food Authority (AFA) On Food Safety And Regulation

Nov 12, 2024 Nov 12, 2024

100%

Completed
1570

Staff Training And Sensitization On Fall Amy Worm (FAW)

Oct 15, 2024 Oct 16, 2024

100%

Completed
1571

Staff Training And Sensitization On Food Safety And Regulations By Agriculture Food Authority (AFA)

Nov 13, 2024 Nov 13, 2024

%

Completed
1572

Stakeholder Engagement On The Control Of Fall Army Worm Using Bio Pesticides

Aug 22, 2024 Aug 23, 2024

100%

Completed
1573

Stakeholder Engagement On The Control Of Fall Army Worm Using Bio Pesticides

Sep 06, 2024 Sep 06, 2024

100%

Completed
1574

Stakeholder Engagement On The Control Of Fall Army Worm Using Bio Pesticides, Follow-up On Coffee Berry Borer ( CBB) Control Piloting Project By CABI

Aug 26, 2024 Aug 30, 2024

100%

Completed
1575

Stakeholder Engagement On The Introduction Of BIXA Crop In Kirinyaga By Agriculture Food Authority (AFA

Sep 06, 2024 Sep 06, 2024

100%

Completed
1576

Stakeholder Planning Meeting For The EKYAN Programme For The Schedule Of Activities

Jul 25, 2024 Jul 25, 2024

100%

Completed
1577

Stakeholder Sensitization On Safe Use Of Pesticides For The Mwea Rice Farmers

Feb 26, 2025 Feb 26, 2025

%

Overdue
1578

STAKEHOLDERS MEETING ON LIQUOR INSPECTION;Kerugoya Market

Jan 14, 2025 Jan 14, 2025

%

Completed
1579

Stakeholders Meeting On The Increase Of Stray Dogs In The County. ( Public Health, Director Health And KWS

Jan 27, 2025 Jan 27, 2025

100%

Completed
1580

Stakeholders’ Dissemination Workshop For IDSR Evaluation And 7-1-7 Outbreak Performance Metrics Baseline Assessment

Feb 25, 2025 Feb 28, 2025

100%

Completed
1581

Stakeholder’s Meeting With Ministry Of Education And Other Stakeholders To Discuss Upcoming School Based Deworming All Over The County.

May 03, 2024 May 03, 2024

100%

Completed
1582

Starniqreign

May 07, 2024 May 07, 2024

%

Overdue
1583

Starniqreign Text C

May 14, 2024 May 18, 2024

0%

Overdue
1584

Start Of Phase II Malezi Bora Activity

Oct 09, 2024 Oct 09, 2024

100%

Completed
1585

State Of County Address

Dec 18, 2024 Dec 19, 2024

0%

Overdue
1586

Status Check Of H.E Residence

Jul 19, 2024 Jul 19, 2024

100%

Completed
1587

Status Check Of H.E Residence

Jun 04, 2024 Jun 04, 2024

100%

Completed
1588

Strategy Meeting With CDAC Team On Implementation Of CBET Curriculum.

Jul 04, 2024 Jul 04, 2024

100%

Completed
1589

Sub-County Immunisation Data Review, Target Setting And Forecasting Meeting

Dec 13, 2024 Dec 13, 2024

100%

Completed
1590

SUBMISSION OF DONOR FUNDED PROGRAMS WORK PLANS

Sep 03, 2024 Sep 03, 2024

100%

The Work Plans Were Presented And Areas Of Corrections Highlighted

Completed
1591

Supervion Of All Infrastructural Projects That Have Been Handed Over To VTC

May 21, 2024 May 28, 2024

100%

Completed
1592

Supervion On Sharing Of Uniforms, Learning And Teaching Materials To All ECDE Schools

May 20, 2024 May 25, 2024

100%

Completed
1593

Supervise On The VTCs Asset Register Compliance

May 23, 2024 May 25, 2024

100%

Completed
1594

Supervise Preparation Of FPO Selection Committee

Jul 19, 2024 Jul 19, 2024

100%

Completed
1595

Supervision And Monitoring Of Garbage Collection In Kirinyaga Central

Jul 01, 2024 Jul 01, 2024

%

Completed
1596

Supervision Of Ecde Teachers For Males Bora Activity For Administration Of Vitamin Supplement And Deworming Tablets

May 30, 2024 May 31, 2024

100%

Completed
1597

Supervision Of FMD Vaccination At Mukure Ward

Jul 01, 2024 Jul 05, 2024

100%

Completed
1598

Supervision Of FMD Vaccination At Inoi Ward

Jul 01, 2024 Jul 05, 2024

100%

Completed
1599

Supervision Of Hormonal Intrauterine Devices Uptake In Health Facilities

Sep 09, 2024 Sep 11, 2024

100%

Completed
1600

Supervision Of Household Registration In Mwea East And West Sub-counties.

May 06, 2024 May 08, 2024

100%

Completed
1601

Supervision Of Senate Bursary Audit Responses.

Apr 29, 2024 May 06, 2024

100%

Completed
1602

Supervision Of Sharing Out Materials In Readiness For Further Distribution To The Wards

May 29, 2024 May 31, 2024

100%

Completed
1603

Supervision Of The Construction And Installation Of Liner For The Fish Farmers Supported By ABDP

Oct 08, 2024 Oct 11, 2024

%

Completed
1604

Supervision Of Various Building Projects Within The County That Are Currently Ongoing.

May 27, 2024 May 31, 2024

%

Overdue
1605

Supervision On Ponds Construction And Liner Installation And Sensitizations On Other Innovative Fish Production Technologies For Increased Fish Production

Oct 08, 2024 Oct 11, 2024

100%

Completed
1606

Support Supervision At Gathigiriri Health Center – To Assess Integration Of HIV Services Into Routine Service Delivery.

May 06, 2024 May 06, 2024

100%

Completed
1607

Support Supervision For Rural Health Facilities

Feb 24, 2025 Feb 24, 2025

100%

Completed
1608

Support Supervision In Kirinyaga Central:

Oct 24, 2024 Oct 24, 2024

100%

Completed
1609

Support Supervision In Mwea West

Nov 21, 2024 Nov 21, 2024

100%

Completed
1610

Support Supervision On Hormonal Intrauterine Devices

Aug 27, 2024 Aug 30, 2024

100%

Completed
1611

Surveillance And Monitoring Of Quelea Birds In The Rice Fields At Mwea

Oct 08, 2024 Oct 18, 2024

100%

Completed
1612

Surveillance And Monitoring Of Quelea Quelea Birds In The Rice Fields At Mwea

Oct 08, 2024 Oct 11, 2024

100%

Completed
1613

Survey And Beaconing Of Kiandai Market And Opening Of Access Public Road, Kiine Ward

Jul 29, 2024 Aug 02, 2024

40%

Overdue
1614

System Upgrade Workshop

Jul 02, 2024 Jul 12, 2024

%

Overdue
1615

TaifaCare EMR Partners Consultative Meeting;

Nov 27, 2024 Nov 29, 2024

100%

Completed
1616

Tana Sewerage Inspection

Jun 20, 2024 Jun 21, 2024

100%

Completed
1617

Tana Water Meeting

Apr 24, 2024 Apr 24, 2024

%

Completed
1618

Tana Water Meeting

Apr 24, 2024 Apr 24, 2024

100%

Completed
1619

TASK MANAGEMENT SYSTEM REFRESHER TRAINING

Aug 19, 2024 Aug 20, 2024

100%

Completed
1620

TB Advocacy Shoot On Inooro TV -how By Kirinyaga East Sub-County TB Coordinator.

Mar 11, 2025 Mar 11, 2025

100%

Completed
1621

TB Diagnostics Technical Working Group Meeting

Dec 02, 2024 Dec 02, 2024

100%

Completed
1622

TB HIV Indicators Training

Dec 03, 2024 Dec 03, 2024

100%

Completed
1623

TEBERE KIAMANYEKI WATER PIPES DISTRIBUTION

Feb 19, 2025 Feb 19, 2025

%

Overdue
1624

Technical Committee Meeting For Kicowasco Plc

Oct 29, 2024 Oct 29, 2024

100%

The Technical Meeting Gave Recommendations On How Best To Deal With NRW, Expansion Plan And Proposals For Funding To The Various Players.

Completed
1625

TEST DURING REFRESHER TRAINING

Aug 20, 2024 Aug 20, 2024

100%

Completed
1626

Text 2

May 14, 2024 May 15, 2024

100%

Completed
1627

Thiba Dam Meeting

Aug 08, 2024 Aug 09, 2024

100%

Completed
1628

THIBA WARD FOOTBALL TOURNAMENT

Aug 01, 2024 Oct 13, 2024

%

Overdue
1629

Thiba Ward Sports Kits, Awarding Ceremony

Oct 07, 2024 Oct 14, 2024

100%

Completed
1630

THIBA WARD WATER PIPES DISTRIBUTION

Feb 19, 2025 Feb 19, 2025

%

Overdue
1631

Thirikwa Centre Water Project Meeting

Jul 15, 2024 Jul 16, 2024

100%

Completed
1632

To Attend A Board Of Management Meeting

Jun 04, 2024 Nov 30, -0001

100%

Completed
1633

To Attend A CEDACC TRAINING PROGRAMME

May 28, 2024 May 29, 2024

100%

Completed
1634

To Attend Kirima Dairy Annual General Meeting

May 24, 2024 May 24, 2024

100%

Completed
1635

To Coordinate The County Assembly Responses And Organisation Of Documents

Jun 06, 2024 Nov 30, -0001

100%

Completed
1636

TOT Training On Psychosocial Support For Children Survivors Of Violence

Oct 14, 2024 Oct 16, 2024

100%

Completed
1637

Tourism And Culture

Oct 17, 2024 Oct 17, 0224

%

Completed
1638

Tourism And Markets;SAIC Public Participation

May 31, 2024 May 31, 0024

0%

Completed
1639

TRADE MARKET AFRICA STAKEHOLDERS WORKSHOP;Office Work

Nov 30, -0001 Nov 30, -0001

%

Overdue
1640

Training

Aug 21, 2024 Aug 21, 2024

100%

Completed
1641

Training Of 1222 Community Health Promoters On SHA Registration

Oct 01, 2024 Oct 01, 2024

100%

Completed
1642

Training Of 30 Health Care Workers On Advanced HIV Disease At Roswam Hotel – CASCO And CTLC Involved.

May 08, 2024 May 09, 2024

100%

Completed
1643

Training Of 300 Community Health Promoters

Jul 22, 2024 Jul 26, 2024

100%

Completed
1644

Training Of 300 Community Health Promoters;

Jul 26, 2014 Aug 02, 2024

100%

Completed
1645

Training Of 6 Nurses On Cancer Care.

May 23, 2024 May 23, 2024

100%

Completed
1646

Training Of Agripreneur Under The EKYAN Project

Jul 17, 2024 Jul 17, 2024

100%

Completed
1647

Training Of Agripreneurs On Coffee TIMPS, Safe Use Of Pesticides And Digital Soil Testing & Mapping

Jan 27, 2025 Jan 31, 2025

80%

Overdue
1648

Training Of Catholic Diocese Of Murang’a Supported Facilities On SHA, PCNs And Health Digitization;

Oct 03, 2024 Oct 04, 2024

100%

Completed
1649

Training Of CCDC Committee Members Who Will Oversee The Implementation Of The NAVCDP Project At The Community Level.

Jul 16, 2024 Jul 16, 2024

100%

Completed
1650

Training Of CHPs/Village Elders On Mass Net Distribution.

May 02, 2024 May 02, 2024

100%

Completed
1651

Training Of Community Health Committees And Select Facility Management Committees In Mwea East And West On Budget Advocacy

Aug 08, 2024 Aug 09, 2024

100%

Completed
1652

Training Of County TOTs On Management And M&E Of TB And Other Co-Morbidities - 3rd – 7th June 2024; Venue- Naivasha; Officer Involved – CASCO And CTLC

Jun 03, 2024 Jun 07, 2024

100%

Completed
1653

Training Of Fish Farmers On Technological Innovation And Management Practices(TIMPS)

Feb 17, 2025 Feb 21, 2025

100%

Completed
1654

Training Of Healthcare Workers (Trainers Of Trainers) On Malaria Net Distribution In Mwea.

Apr 26, 2024 Apr 30, 2024

100%

Completed
1655

Training Of Sub-County Health And Education Officials On The National School Based Deworming To Be Conducted On 24 May 2024 – Kirinyaga West, Mwea East And Kirinyaga Central.

May 09, 2024 May 10, 2024

100%

Completed
1656

Training Of TOT On Agripreneur Manual

Feb 17, 2025 Feb 18, 2025

%

Completed
1657

Training Of TOTs On Reprocessing Of Medical Devices

Nov 30, -0001 Nov 30, -0001

100%

Completed
1658

TRAINING ON GREEN FINANCING

Dec 03, 2024 Dec 03, 2024

100%

The Training Took Place And TORs For Proposed Projects And There Expected Thresh Holds Was Done.

Completed
1659

Training On HIV 3-Tier Testing

Jan 14, 2025 Jan 17, 2025

100%

Completed
1660

Training On Integrated Community Health Supportive Supervision Tool

Nov 28, 2024 Nov 29, 2024

100%

Completed
1661

Training Workshop On Reporting Tools For Health Workers Implementing The ATscale Project From 3-7 June 2024; Venue- Naivasha; Officers Involved- Rehabilitative Health Focal Person And Other HCWs.

Jun 03, 2024 Jun 07, 2024

100%

Completed
1662

Transport And Parking Bill - County Assembly Summon

May 15, 2024 May 15, 2024

%

Completed
1663

TRAVEL TO NAIROBI

May 23, 2024 May 23, 2024

100%

Completed
1664

Traveling To Kwale For G7

Oct 16, 2024 Oct 16, 2024

100%

Completed
1665

Triple Threat Community Dialogue Sessions In Mwea East And Mwea West

Mar 26, 2025 Mar 26, 2025

100%

Completed
1666

Tusome Validation Workshop

May 07, 2024 May 08, 2024

100%

Completed
1667

TVET Quality Assurance Audit At Thome VTC

Aug 27, 2024 Aug 27, 2024

100%

Completed
1668

TWWA Meeting At Nyeri

Jul 05, 2024 Jul 06, 2024

100%

Completed
1669

UN International Day For PWD Celebrations

Dec 05, 2024 Dec 05, 2024

100%

Completed
1670

UN Women Meeting

Jun 05, 2024 Jun 05, 2024

100%

Completed
1671

US-PEPFAR Implementing Partners Meeting?-Virtual.

Apr 30, 2024 Apr 30, 2024

100%

Completed
1672

USAID-TB Program Support County Entry Meeting;

Aug 14, 2024 Aug 14, 2024

100%

Completed
1673

Ushirika Day Planning;Review On Mutira Elections Progress

Jul 05, 2024 Jul 05, 2024

%

Completed
1674

Vaccination

Oct 28, 2024 Nov 01, 2024

100%

Completed
1675

Vaccination Against LSD In Cattle And Rabies In Dogs And Cats

Nov 11, 2024 Nov 16, 2024

100%

Completed
1676

Vaccination Campaign For Black Quarter Anthrax And Rabies.

Oct 14, 2024 Nov 15, 2024

100%

Completed
1677

Vaccination Of Livestock Against For Black Quarter Anthrax And Rabies

Oct 28, 2024 Nov 01, 2024

100%

Completed
1678

Vaccination Of Livestock Against Lumpy Skin Disease (LMD) In Cattle And Rabies In Dogs And Cats

Nov 11, 2024 Nov 15, 2024

100%

Completed
1679

Vaccination Of Livestock On Foot And Mouth Disease( FMD) & Rabies

Feb 24, 2025 Feb 28, 2025

100%

Completed
1680

VALIDATION OF KIDA STRATEGY MEETING

Feb 17, 2025 Feb 17, 2025

%

Overdue
1681

Value Based Training On Kenya EMR PMTCT Solutions

Sep 03, 2024 Sep 06, 2024

100%

Completed
1682

Veterinary Officers And Slaughter Slabs Stakeholders Capacity Building On Hides And Skins By The Directorate Of Veterinary Services (DVS)

Dec 16, 2024 Dec 20, 2024

100%

Completed
1683

Virtual Consultative Meeting Between CECMs And CASCOs On Situation Of ARVs In The Country;

Mar 10, 2025 Mar 10, 2025

100%

Completed
1684

Virtual Consultative Meeting With NASCOP

Feb 04, 2025 Feb 04, 2025

100%

Completed
1685

Virtual Feedback On Nutrition And Rice Utilisation Baseline Survey; 4-5PM

Aug 06, 2024 Aug 06, 2024

100%

Completed
1686

Virtual Kirinyaga County COAG Recurring Meeting

Nov 21, 2024 Nov 21, 2024

100%

Completed
1687

Virtual Mass Nets Distribution Campaign National Coordination Committee Meeting

Sep 04, 2024 Sep 04, 2024

100%

Completed
1688

Virtual Meeting On Building Resilient And Responsive Health Systems (BREHS) With County Officials

Feb 24, 2025 Feb 24, 2025

100%

Completed
1689

Virtual Meeting On Continuous Quality Improvement (CQI)

Aug 27, 2024 Aug 27, 2024

100%

Completed
1690

Virtual Meeting On National School Based Deworming Program – Post-event Review

Aug 20, 2024 Aug 20, 2024

100%

Completed
1691

Virtual Meeting On National School Based Deworming Program – Post-event Review

Aug 21, 2024 Aug 21, 2024

100%

Completed
1692

Virtual Meeting On Partnering On HIV Awareness During World AIDS Day 8-10 Am

Nov 20, 2024 Nov 20, 2024

100%

Completed
1693

Virtual Meeting On Point Of Care Ultrasound

Aug 20, 2024 Aug 20, 2024

100%

Completed
1694

Virtual Meeting On Progress Of Continuous Quality Improvement Projects

May 29, 2024 May 29, 2024

100%

Completed
1695

Virtual Meeting To Discuss Big Catch Up Immunization Support

Nov 26, 2024 Nov 26, 2024

100%

Completed
1696

Virtual Meeting With CDC-Kenya On Supported HRH Transition Plan For Implementing Partners In Kirinyaga

Mar 19, 2025 Mar 19, 2025

100%

Completed
1697

Virtual Meeting With CDC-Kenya Team On Wezesha Afya FY 25 Continuation Application

Oct 16, 2024 Oct 16, 2024

100%

Completed
1698

Virtual Meeting With E-water Team On Villages Identified In Kirinyaga County

May 06, 2024 May 06, 2024

100%

Completed
1699

Virtual Meeting With JICA To Review Progress Of SAMACH Project; 9:00 Am

Sep 24, 2024 Sep 24, 2024

100%

Completed
1700

Virtual Meeting With K -wash Coordinators

May 21, 2024 May 22, 2024

100%

Completed
1701

Virtual Meeting With LVCT-Health Management

Feb 19, 2025 Feb 19, 2025

100%

Completed
1702

Virtual Meeting With MoH And Other Stakeholders To Discuss Ongoing Plans In Readiness For The Mass Net Distribution.

May 02, 2024 May 02, 2024

100%

Completed
1703

Virtual Meeting With To Review Progress Of National School Based Deworming Program

Oct 01, 2024 Oct 01, 2024

100%

Completed
1704

Virtual National Security Coordination Meeting On Mass Net Distribution Campaign In Mwea Constituency.

May 23, 2024 May 23, 2024

100%

Completed
1705

Virtual Sensitization Meeting On The Introduction Of Fixed Dose Combination Of Antiretrovirals For Clinically Eligible HIV Patients

Sep 17, 2024 Sep 17, 2024

100%

Completed
1706

Virtual Sensitization Of County Health Managers On Digitalization Of Kirinyaga Health Facilities

Mar 18, 2025 Mar 18, 2025

100%

Completed
1707

Virtual Sensitization Of Facility In Charges On Digitalization Of Kirinyaga Health Facilities And How To Request The Devices

Mar 19, 2025 Mar 19, 2025

100%

Completed
1708

Virtual Training Of Digitalization Of Kirinyaga Health Facilities- Health Pro User Creation

Mar 17, 2025 Mar 17, 2025

100%

Completed
1709

Virtual Training On Device Issuance Workflow On HealthPro System;

Mar 28, 2025 Mar 28, 2025

100%

Overdue
1710

Virtual Validation Meeting On The Kenya National Public Health Institute Strategic Plan

Mar 12, 2025 Mar 12, 2025

100%

Completed
1711

Virtual – Capacity Building On Reprocessing Of Medical Devices Audit Tool – Various Health Facility Managers.

May 16, 2024 May 16, 2024

100%

Completed
1712

Visit A Welfare Group At Njukiini Ward

Aug 27, 2024 Aug 27, 2024

%

Overdue
1713

Visit By DANIDA Auditors To Review FY 23/24 DANIDA Level 1 Support Activities

Oct 30, 2024 Oct 30, 2024

100%

Completed
1714

Visit By Johnson And Johnson Team To Observe Mwea West Primary Health Care Network (PCN) And Community Strategy Activities

Oct 29, 2024 Oct 29, 2024

100%

Completed
1715

VISIT KWIRORA WOMEN GROUP IN NJUKIINI WARD

Sep 12, 2024 Sep 12, 2024

%

Overdue
1716

Visit Self Help Groups At Nyangati & Rukenya

May 24, 2024 May 24, 2024

100%

Completed
1717

Visit Self Help Groups At Nyangati & Rukenya

May 24, 2024 May 24, 2024

100%

Completed
1718

Visit To Impoverished Households

Sep 09, 2024 Sep 09, 2024

100%

Completed
1719

Visit Vulnerable Families

Sep 03, 2024 Sep 03, 2024

100%

Completed
1720

VISITING FIRE VICTIMS AT KAGUMO

May 28, 2024 May 28, 2024

100%

Completed
1721

Visiting Groups At Inoi

Jun 13, 2024 Jun 13, 2024

100%

Completed
1722

VISITING GROUPS GROUPS AT NDIA AND MWEA WEST SUB COUNTIES

May 31, 2024 May 31, 2024

100%

Completed
1723

Visiting Groups In Mwea West

Jun 06, 2024 Jun 06, 2024

100%

Completed
1724

VISITING WOMEN GROUPS AT NYANGATI AND GICHUGU

May 30, 2024 May 30, 2024

100%

Completed
1725

Vitamin A + Deworming At All ECDE Centers In The County From 27-30 May 2024 – Many Healthcare Workers Involved.

May 27, 2024 May 30, 2024

100%

Completed
1726

Vocational Training Centres Principals Meeting

Jul 03, 2024 Jul 03, 2024

100%

Completed
1727

Vouchers Follow-up

Jun 20, 2024 Jun 20, 2024

100%

Completed
1728

Wamumu Ward Unblocking Of Drainages

May 06, 2024 May 08, 2024

%

Overdue
1729

Wanguru Hyper Market

Nov 12, 2024 Nov 12, 2024

%

Completed
1730

Wanguru Stadium Visit

Jul 29, 2024 Aug 05, 2024

100%

Completed
1731

Ward Based Inhouse Road Program- Mutira Ward

May 14, 2024 May 17, 2024

%

Overdue
1732

Ward Based Projects Visit

Jul 29, 2024 Aug 12, 2024

100%

Completed
1733

WARD EVENTS

Sep 16, 2024 Sep 16, 2024

%

Completed
1734

Ward Sports Equipment Stock Taking

Jul 22, 2024 Jul 29, 2024

100%

Completed
1735

Ward Sports Equipments Disbursement Review

Oct 14, 2024 Oct 21, 2024

100%

Thiba Ward Tournament Sports Kits Issuance.

Completed
1736

Ward Sports Equipments Disbursement Review

Sep 02, 2024 Sep 09, 2024

100%

Completed
1737

Ward Sports Equipments Disbursement Review

Sep 09, 2024 Sep 16, 2024

100%

Completed
1738

Ward Sports Equipments Disbursement Review

Jun 10, 2024 Jun 17, 2024

100%

Completed
1739

Ward Sports Equipments Disbursement Review

Aug 19, 2024 Aug 27, 2024

100%

Completed
1740

Ward Sports Equipments Disbursment Status

Jun 24, 2024 Jul 01, 2024

100%

Completed
1741

Ward Sports Equipments Disbursment Status

Aug 27, 2024 Sep 03, 2024

100%

Completed
1742

WASCO Games

Aug 23, 2024 Aug 24, 2024

100%

Completed
1743

WASH And CCRI Approval Meetings With HE

Nov 21, 2024 Nov 21, 2024

100%

It Was Agreed That Both Work Plans Are Ready For Submission To Cabinet For Approval.

Completed
1744

WASREB MEETING

Jun 27, 2024 Jun 27, 2024

100%

The Meeting Was Held Virtually And Was Successful

Completed
1745

Water & Electricity Follow Up

Oct 03, 2024 Oct 03, 2024

100%

Completed
1746

Water & Electricity Follow Up

May 24, 2024 May 24, 2024

100%

Completed
1747

Water & Electricity Follow Up

Oct 25, 2024 Oct 25, 2024

100%

Completed
1748

Water And Sanitation Hygiene Training

Aug 25, 2024 Aug 30, 2024

100%

Completed
1749

WEEKLY CLEAN UP CHECK UP

Jun 10, 2024 Jun 14, 2024

100%

Good Progress

Completed
1750

Weights And Measures;Cooperatives

Nov 01, 2024 Nov 01, 2024

%

Completed
1751

WEIGHTS And MEASURES

Nov 12, 2024 Nov 12, 2024

%

Completed
1752

Weights And Measures

Nov 22, 2024 Nov 22, 2024

%

Completed
1753

Weights And Measures

Nov 26, 2024 Nov 26, 2024

%

Completed
1754

Weights And Measures

Oct 28, 2024 Oct 28, 2024

%

Completed
1755

Weights And Measures

Jul 18, 2024 Jul 18, 2024

%

Completed
1756

Weights And Measures Exercise;Kibingoti Market

Sep 11, 2024 Sep 11, 2024

%

Completed
1757

WEZESHA AFYA PROJECT-COBTINUOUS APPLICATION

May 07, 2024 May 07, 2024

0%

Completed
1758

Wezesha Close Of Year Meeting At Embu

Sep 07, 2024 Sep 07, 2024

100%

Completed
1759

Women Convocation Meeting At Kerugoya

Aug 07, 2024 Aug 07, 2024

100%

Completed
1760

Women Empowerment Meeting

Oct 10, 2024 Oct 10, 2024

100%

Completed
1761

Women Empowerment Meeting

Jul 01, 2024 Jul 01, 2024

100%

Completed
1762

WORK IN THE OFFICE

Jul 03, 2024 Jul 03, 2024

100%

Completed
1763

WORK IN THE OFFICE, SERVING WALK INS

Jul 16, 2024 Jul 16, 2024

100%

Completed
1764

Work Plan Presentations

Sep 05, 2024 Sep 05, 2024

100%

Work Plans Were Presented And Further Review Was Recommended

Completed
1765

Working On Branding For Milk For Ecde Programme

Jun 04, 2024 Jun 10, 2024

100%

Completed
1766

Working On Branding For Milk For Ecde Programme

Nov 30, -0001 Nov 30, -0001

80%

Completed
1767

Working On Proposal To World Aid On TVETA Funding.

Aug 29, 2024 Aug 29, 2024

%

Completed
1768

WORKING OUT THE ADP 2025/2026

Jul 11, 2024 Jul 15, 2024

100%

The ADP Took Some Time To Prepare Because Of All The Various Players And Thus Consultations And Back And Forth Communications. The Document Is Complete And Already Submitted.

Completed
1769

WORKPLAN APPROVAL MEETINGS WITH REGARD TO FLOCCA AND K WASH

Sep 17, 2024 Sep 17, 2024

100%

This Happened And Proposed Corrections Raised For Address

Completed
1770

Workplan For The GDU

May 23, 2024 May 23, 2024

100%

Completed
1771

Workshop To Develop Hospital Acquired Infections Surveillance Training Package

Oct 28, 2024 Nov 01, 2024

100%

Completed
1772

Workshop To Develop Integrated NCDs-HIV Patient Literacy Materials

Mar 26, 2025 Mar 28, 2025

100%

Completed
1773

Workshop To Plan For The Digital Xray Equipment Assessment And Certification And Review Of End-user Training Materials

Jan 27, 2025 Jan 31, 2025

100%

Completed
1774

Workshop To Revise The Nutrition And HIV Tool Kit For Service Providers And Kenya National Guidelines On Nutrition And HIV

Sep 23, 2024 Sep 27, 2024

100%

Completed
1775

WORLD BANK MISSION MEETING ON K WASH

Sep 04, 2024 Sep 04, 2024

100%

The Meeting Took Place And Further Details Pertaining Alignment To Meet The Conditions Set By World Bank Under P For R

Completed
1776

World Environment Day 2024

Jun 05, 2024 Jun 06, 2024

100%

Completed
1777

WORLD ENVIRONMENT DAY PLANNING MEETING 2

May 22, 2024 May 22, 2024

100%

The Meeting Addressed The Final Details About The Celebration Of The World Environment Day

Completed
1778

WORLD ENVIRONMENT DAY PLANNING MEETING 2

May 22, 2024 May 22, 2024

100%

The Meeting Sought To Address The Final Details Of The World Environment Day

Completed
1779

World No Tobacco Day Stakeholders Meeting At Bekam Hotel

May 27, 2024 May 27, 2024

100%

Completed
1780

Writing Reports And Answers To The County Assembly On Departmental Budget Estimates For The Financial Year 2024/2025

May 27, 2024 May 29, 2024

100%

Completed
1781

?Integrated Management Of Neonatal And Child Illnesses (IMNCI)

Feb 10, 2025 Feb 14, 2025

100%

Completed
1782

?Workshop For The Finalisation Of The School Meals Menu Guideline

Feb 03, 2025 Feb 06, 2025

100%

Completed
>